Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name Environment Clearance for “proposed construction and development of a Class - A Commercial Office Building at Plot C-65, Block G, Bandra-Kurla Complex, Mumbai 400051, Maharashtra” Company/Organisation Name M/S GOISU REALTY PRIVATE LIMITED
Registered Address R18, Dextrus, A-802, Crescenzo, C/38-39, G-Block, BKC, Mumbai Maharashtra 400051 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Hironori Kawahara
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address R18, Dextrus, a-802, Crescenzo, C/38-39, G-Block, BKC, Mumbai,,Mumbai,Mumbai City,Maharashtra-400051
(d)Pin code 400051
(e)E-mail soichiro.okada@goisu-realty.co.in
(f)Telephone No. 22-62606800
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(a) Building and Construction projects
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/MH/MIS/175479/2020
(e)Master Proposal Number(Single Window) SW/175475/2020
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraMumbai (Suburban)KurlaBandra
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document NILL
Project Profile
Location of the project Plot C-65, Block G, Bandra-Kurla Complex, Mumbai 400051, Maharashtra
Town / Village
(Name of more than one town may be entered by separating with)
Bandra Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
Plot C-65, Block G,
State Maharashtra District Mumbai (Suburban)
Tehshil Kurla Pincode 400051
Nearest railway station Kurla Railway Station Distance from the project site 1.49
Nearest airport Chhatrapati Shivaji International Airport Distance from the project site 2.92
Nearest Town/City/District Headquarters Bandra Kurla Complex (BKC) Distance from the project site 0
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) Mumbai Metropolitan Region Development Authority (M.M.R.D.A) Upload GPS file Copy of Kml File     
Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas None of above Areas
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 126768.12 Existing Built Up Area(In Meter /Sqr) 00
Does it attract any of the general conditions given below? No
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) 00
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Land use: The proposed development is in conformity with the Development Plan of Mumbai Metropolitan Region Development Authority (MMRDA). Land Cover: Proposed site is barren land without any existing structures on site. There is no change in Land use as per DP Remarks & Plan.
1.2 Clearance of existing land, vegetation and buildings? Yes Process for obtaining Tree NOC is in progress.
1.3 Creation of new land uses? No There is no change in Land use as per DP Remarks & Plan.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geotechnical investigation on site is in progress.
1.5 Construction works? Yes The proposed project is development of 1 commercial building. Configuration is as given below: Commercial Building – 6 Basements + Ground + 1st to 12th Upper Floors
1.6 Demolition works? No There are no existing structures on site.
1.7 Temporary sites used for construction works or housing of construction workers? No There will be no temporary housing facility for the construction workers. Temporary sheds will be used for storage of the construction goods or materials on site.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes The proposed project is development of 1 commercial building. Configuration is as given below: Commercial Building – 6 Basements + Ground + 1st to 12th Upper Floors Excavation will be carried out on site for creating 6 Nos. of Basement and Foundation purpose. Depth of excavation = 28.50 M. Excavated material =296,700cum
1.9 Underground works including mining or tunneling? No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? No Not Applicable
1.14 Facilities for storage of goods or materials? Yes Temporary sheds will be constructed for storage of construction materials. Temporary storeroom for the storage of construction materials will be provided on site, which will be removed later. Thus, the impact on the physical environment will be temporal. During the operational phase, there will be well-designated confined storage areas within the building, which will not have an impact on the physical environment.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Construction Phase: ? Temporary sanitation facilities would be provided for construction workers which would be directly connected to the existing municipal sewer line for disposal of wastewater. ? The biodegradable and nonbiodegradable waste from construction workers would be handed over to the local garbage collecting vehicles and would be disposed off in the existing municipal solid waste management system. ? Substratum excavated for the basement and foundation will be used on
1.16 Facilities for long term housing of operational workers? No There are no provisions of long-term housing facilities for operational workers. There will be a maintenance team along with security which will be hired from nearby areas and they will work on rotation basis.
1.17 New road, rail or sea traffic during construction or operation? Yes Construction Phase There will be a temporary increase in traffic due to transportation of construction material and workers. Operation Phase There will be a minor increase in traffic due to occupants/visitors commuting to the commercial building from outside.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No There is no new rail, air-borne transport infrastructure required for the project. Approach road & internal road will be constructed as a part of the project plan.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Due to the upcoming project, there will be no closure or diversion of existing transport routes or infrastructures leading to changes in traffic movements.
1.20 New or diverted transmission lines or pipelines? No There will be no diversion of transmission and pipelines, though the project involves construction of new internal pipelines for fresh water, recycled water, rainwater harvesting, sewer lines, storm water drain and internal power distribution lines.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No The project will not involve any impoundment, damming, culverting or realignment or other changes to the hydrology of watercourses or aquifers.
1.22 Stream crossings? No Not Applicable
1.23 Abstraction or transfers of water from ground or surface waters? No Not Applicable
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not Applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Construction Phase: There will be movement of personnel, materials and machineries during the construction phase. The impact due to the movement of personnel will be negligible as local people will be deployed. The construction material and machinery required will be mobilized from the local area. Thus, there will be contribution of marginal noise & vehicular emissions which will be mitigated by implementation of effective EMP. Operation Phase: During commissioning, there will be
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Construction phase: During the construction phase, there will be inward and outward movement of local labour in the construction site, this will be an ongoing temporary activity and will not call for a permanent influx of people. Operation Phase: This is a commercial building. There will be a permanent influx of the building staff, office staff & visitors.
1.29 Introduction of alien species? No Local plant species will be planted for the green belt/ landscaping.
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No None
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Land is nonagricultural land.
2.2 Water (expected source & competing users) unit: KLD Yes Construction phase: Source: Tanker water for construction activity and MCGM for drinking and domestic use. Requirement: Total = 50 m3/day (For domestic & drinking purpose to construction workers = 10 m3/day For construction activity = 40 m3/day) Operation phase: Source: Municipal Corporation of Greater Mumbai (M.C.G.M) for drinking and domestic use and recycled water from STP for flushing, and gardening purpose. Total Water Requirement: 325 m3/day Fresh Water: 175 m3/day Flushing
2.3 Minerals (MT) Yes Bricks and stone (locally available in the market)
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes General Construction Material required for construction consists of Steel, Cement, Stone Aggregate, Sand, Bricks, Glass, Fly - ash based products, etc. The construction material would be used in the project site and would be obtained from authorized local dealers.
2.5 Forests and timber (source – MT) Yes The use of wood in the project has been planned to the minimum extent possible. Wood with recycled content such as MDF boards will be used to the extent possible.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Source: - TATA/Adani Electricity Power requirement: ? Construction Phase: 200 KW ? Operation Phase: Approx. Connected Load: 18,870KW Approx. Demand Load: 14,267 KW DG Set: 17,500 KVA
2.7 Any other natural resources (use appropriate standard units) No No other natural resources will be used.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No Not Applicable
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable
3.3 Affect the welfare of people e.g. by changing living conditions? No Not Applicable
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes Yes Excavation waste 296,700 cum
4.2 Municipal waste (domestic and or commercial wastes) Yes Operation Phase: Total Municipal Solid waste: 700 Kg/Day Biodegradable waste (40% of total waste generated): 280 Kg/Day Non- Biodegradable waste (60% of total waste generated): 420 Kg/Day
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No Not Applicable
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Operation Phase: About 30.00 Kg/day of sludge will be generated during the operation phase.
4.7 Construction or demolition wastes Yes All construction waste will be collected and segregation properly. Mostly of that will be recycled for the construction activity. Surplus will be disposed off at the proper site as per the norms.
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Proper care will be taken to avoid contaminated soil and if oil spilled soil will be found; the same will be scrapped off and stored at earmarked places and sent to disposal sites.
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Construction phase: ? There will be a slight increase in emission of SO2, NOx, SPM, and RSPM due to movement of trucks carrying raw material. ? Due to construction machinery Operation phase: ? Vehicular pollution during construction and operation phase. ? Use of DG sets as an emergency power back-up will add to slight emission of air pollutants.
5.2 Emissions from production processes No Not applicable.
5.3 Emissions from materials handling including storage or transport Yes The emission expected from the construction phase will be dust arising from material handling and vehicular emission from transport vehicles. These include the emissions due to idling of the vehicles during loading and unloading activities.
5.4 Emissions from construction activities including plant and equipment Yes The dust emission sources are: ? Excavation ? Haul-road movements ? Construction ? Material Handling ? Finishing There will be minor emissions from construction equipment & dust generation during construction activity & raw material handling.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes During the construction phase, there will be some dust generation due to handling of raw material and movement of vehicles carrying raw material. During Operation Phase negligible gaseous emission due to vehicle movements will be generated.
5.6 Emissions from incineration of waste No Not applicable.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable.
5.8 Emissions from any other sources No Not applicable.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Construction phase: Minor increase in noise is anticipated due to the ongoing construction activity. The construction activity will be restricted to daytime only. Operation phase: Noise will be generated due to DG sets (only in case of power failures) and vehicular movement.
6.2 From industrial or similar processes No Not applicable.
6.3 From construction or demolition Yes Noise & dust will be generated from construction & demolition activity.
6.4 From blasting or piling No Not applicable.
6.5 From construction or operational traffic Yes Construction phase: Noise will be generated due to transport of trucks carrying the raw material/debris. Operation phase: During the operation phase, traffic noise will be generated due to vehicles. However, adequate measures like tree plantation at periphery will be taken to curb the noise pollution at the site.
6.6 From lighting or cooling systems No Not applicable.
6.7 From any other sources No D.G. sets will be enclosed in acoustic enclosures as prescribed by CPCB to mitigate noise while in operation phase during power failure.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Not applicable.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No No untreated sewage will be discharged into the open surfaces causing the contamination of groundwater. Construction Phase Temporary Toilets would be constructed for construction workers and it would be directly connected to the existing Municipal sewer line for disposal. Operation Phase Wastewater will be treated in the Sewage Treatment Plant. Treated water will be reused for flushing and gardening purposes. Remaining treated water will be disposed off to the existing municipal sewer line.
7.3 By deposition of pollutants emitted to air into the land or into water Yes Construction Phase During construction, there will be slight emissions generated from material transfer, construction operations, finishing operations, road construction, exhaust from vehicles, and stationary sources, etc. Dust generated during construction will be settled continuously by spraying water.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Not applicable. Proper fire-fighting arrangements will be provided in building and all around the project site (as per the norms of the NBC – 2016) and all the conditions mentioned in CFO NOC will be followed.
8.2 From any other causes Yes The major risks involved in the project would be working at different construction heights and mishaps due to human errors, bad construction practices and associated electric hazards. All safety measures will be in place prior to commencement of operations so as to avoid any risk to human life and as per the prevailing local by laws.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Landslides are not expected in the area. Management plan for flood is as follows Flood: ? Storm water system would be checked at regular interval for its proper functioning. ? Mapping the areas within or leading in or out of the building that may be waterlogged due to the flood. The areas will be marked after completion of the project (as final ground levels etc. will be available after completion). Earthquake: Mumbai lies in Seismic Zone - III and the design and construction will be
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes The proposed infrastructure is only for the proposed development: ? STP for treatment and recycling of wastewater generated on site. ? Biodegradable waste generated will be treated in an Organic Waste Composter (OWC) machine on site. ? Rainwater Harvesting ? Adequate parking space ? Common amenity areas, landscaping etc. for green belt development.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not applicable.
9.3 Set a precedent for later developments No Not applicable.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not applicable.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Sanjay Gandhi National Park - Approx. 10.00 Km (N) Thane Creek Flamingo Sanctuary - Approx. 7.8 Km (E) Maharashtra Nature Park - Approx. 0.98 Km (S)
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Mahim Creek - Approx. 0.53 km (S) Arabian Sea - Approx. 4.55 km (W) & 6.63 Km (S) Thane Creek - Approx. 10.14 Km (E) Mahim Bay - Approx. 3.20 km (W) Malad Creek - Approx. 11.89 km (NW) Gorai Creek - Approx. 16.88 km (NW) Back Bay - Approx. 13.06 km (S) Powai Lake - Approx. 7.44 Km (N) Vihar Lake - Approx. 9.38 Km (N) Tulsi Lake - Approx. 14.60 Km (N)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Sanjay Gandhi National Park - Approx. 10.00 Km (N) Thane Creek Flamingo Sanctuary - Approx. 7.8 Km (E) Maharashtra Nature Park - Approx. 0.98 Km (S)
4 Inland, coastal, marine or underground waters Yes Mahim Creek - Approx. 0.53 km (S) Arabian Sea - Approx. 4.55 km (W) & 6.63 Km (S) Thane Creek - Approx. 10.14 Km (E) Mahim Bay - Approx. 3.20 km (W) Malad Creek - Approx. 11.89 km (NW) Gorai Creek - Approx. 16.88 km (NW) Back Bay - Approx. 13.06 km (S) Powai Lake - Approx. 7.44 Km (N) Vihar Lake - Approx. 9.38 Km (N) Tulsi Lake - Approx. 14.60 Km (N)
5 State, National boundaries No Not Applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes Bandra Kurla Complex Road Approx. 0.43 Km – (NW)
7 Defence installations No Not Applicable
8 Densely populated or built-up area Yes The proposed project is located at Bandra Kurla Complex.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No Proposed project site is located in a highly urbanized area. School, hospitals and small temples are observed in 15 km radius of the project site.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not Applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Not Applicable Mumbai lies in Seismic Zone - III and the design and construction will be done as per Indian Standards for Zone-III Seismic category.
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHironori Kawahara
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S GOISU REALTY PRIVATE LIMITED
AddressR18, Dextrus, A-802, Crescenzo, C/38-39, G-Block, BKC, Mumbai
Print