Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Jayvir Dyechem
(b)Name of the Company / Organisation JAYVIR DYE CHEM, NARODA
(c)Registered Address Plot No. 314/1/1/B & C, Phase I, Naroda,,Ahmedabad,Gujarat-382330
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Bharatbhai D Patel
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Plot No. 314/1/1/B & C, Phase I, Naroda,Ahmedabad,Gujarat-382330
(d)Pin code 382330
(e)E-mail jayvirdyechem2020@gmail.com
(f)Telephone No. 79-2228117
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/IND2/54823/2014
(e)Master Proposal Number(Single Window) SW/163928/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 314/1/1/B&C , 313/14/B, Phase - 1 GIDC Naroda, Ahm
(b)Pincode 382330
(c)Bounded Latitudes (North)
From
Degree 23.2891
Minutes
Second
From
Degree 23.3236
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.9825
Minutes
Second
From
Degree 73.0288
Minutes
Second
(e)Survey of India Topo Sheet No. F43A12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 60
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAhmedabadAhmadabad CityNaroda
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SEIAA/GUJ/EC/5(f)/298/2016
(b)Date of Apply of EC 21 Aug 2014
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Proposal in in GIDC, Naroda
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. 001
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)2 Nitro PPD60060Tons per Annum(TPA)Road
(2.)Dyes1200120Tons per Annum(TPA)Road
(3.)Sodium Thiosulphate360-3600Tons per Annum(TPA)Road
(4.)Aniline 2,4 Disulphonic Acid00300300Tons per Annum(TPA)Road
(5.)Para Anisidine 3 Sulfonic Acid00300300Tons per Annum(TPA)Road
(6.)Chromotropic Acid00300300Tons per Annum(TPA)Road
(7.)6 Chloro 4 NAP00300300Tons per Annum(TPA)Road
(8.)Picramic Acid00300300Tons per Annum(TPA)Road
(9.)1(P-Toyl) Phenyl 3 Methyl 5 Pyrazolone00300300Tons per Annum(TPA)Road
(10.)1 Phenyl 3 Methyl 5 Pyrazolone00300300Tons per Annum(TPA)Road
(11.)N - Propionyl H- Acid00300300Tons per Annum(TPA)Road
(12.)1 ( 3 Sylfophenyl ) 3 methyl 5 Pyrozolone00300300Tons per Annum(TPA)Road
(13.)DCSPMP00300300Tons per Annum(TPA)Road
(14.)Para Phenyl Di Amine Or180540720Tons per Annum(TPA)Road
(15.)Meta Phenyl Di Amine00540540Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)MSRL Storage Tank2 NO OF 20 KL CAPACITY3 NO OF 30 KL CAPACITY5
(2.)Storage Vessel , HDPE2 NO OF 10 KL CAPACITY2 NO OF 10 KL CAPACITY4
(3.)DG Set1 NO. OF 66 KVA1 NO. OF 100 KVA2
(4.)Receiving Tank (SS6 NO OF 2 KL CAPACITY6 NO OF 6 KL CAPACITY12
(5.)Cooling Tower 100 Tr1 NO.2 NO.3
(6.)HAG1 NO. 2 Lac K Cal1 NO. 5 Lac K Cal2
(7.)Vacuum Pump2 NO. OF 15 HP5 NO. OF 15 HP7
(8.)MSRL Storage Tank6 NO OF 20 KL CAPACITY3 NO OF 30 KL CAPACITY9
(9.)Storage Vessel , HDPE2 NO OF 10 KL CAPACITY2 NO OF 10 KL CAPACITY4
(10.)REDUCTION VESSEL (SS)3 NO OF 4Kl CAPACITY2 NO OF 15Kl CAPACITY5
(11.)SS Vessel2 NO OF 5 KL CAPACITY5 NO OF 10 KL CAPACITY7
(12.)Pusher Centrifuge2 NO. (18' Dia)2 NO. (18' Dia)4
(13.)Pulitzers2 NO. OF 15 HP2 NO. OF 15 HP4
(14.)Steam Boiler1 NO. 0.6 KL1 NO. 1.0 KL2
(15.)ATFD01 NO OF 20 KL/DAY1
(16.)MSRL Open Vessel2 NO OF 7 KL CAPACITY5 NO OF 15 KL CAPACITY7
(17.)Centrifuge5 NO. (36' Dia)10 NO. (48' Dia)15
(18.)TFH1 NO. OF 3000U1 NO. OF 4000U & 1 NO. OF 8000U3
(19.)Distillation Vessel (SS)3 NO OF 5 KL CAPACITY3 NO OF 10KL CAPACITY6
(20.)Auto Clave03 NO OF 10KL CAPACITY3
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 Mar 2020
(iv)Valid Upto 30 Jun 2024
(v)File No. DPCB/ABD/ND/CCA 137(2)
(vi)Application No. 172590
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 4.5
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.75
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.45
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.28
(e) Funds Allocated for Environment Management Capital(%) 16.67
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3526.09
(b)Existing quantity of raw material/fuel 407.1
(c)Total quantity of raw material/fuel 3933.19
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Caustic Flakes1440Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(2.)nitric acid1440Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(3.)Cast iron1836Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(4.)HCL1534.32Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(5.)WATER11235.84Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(6.)ACETIC ANHYDRATE158.4Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(7.)Nitrobenzene540Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(8.)Soda Ash1440Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(9.)Soda187.56Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(10.)NaHS3165Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(11.)Lime858Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(12.)Ice3996.48Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(13.)Sulphuric Acid 98%2450.4Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(14.)Soda Bi Carbonate1131Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(15.)Aniline187.56Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(16.)HNO3180Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
(17.)PNA1202.4Tons per AnnumLOCALRoad500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Nov 2018 To 31 Jan 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube904868100
(2.)SO2Micro Gram per Meter Cube24102280
(3.)NOxMicro Gram per Meter Cube56205580
(4.)PM2.5Micro Gram per Meter Cube56304460
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l13929285002000
(2.)Total Hardnessmg/l400370300600
(3.)Chloridesmg/l3903002501000
(4.)Fluoridemg/l0.40.211.5
(5.)pHNA7.67.28.58.5
(6.)TSSmg/l1810100100
    14.3.     No. of Surface Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.127.64A
(2.)CODmg/l3510A
(3.)BODmg/l8.54A
(4.)OthersTDSmg/l440310A
(5.)DOTSSmg/l6.25.1A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))643870
(2.)Leq(Day)A-weighted decibels(dB(A))724575
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram7161
(2.)pH8.07.5
(3.)P(Phosphorus)Milligram per Kilogram6256
(4.)K(Potassium)Milligram per Kilogram6256
(5.)Electric ConductivityMillisiemens per Centimetre200100
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 100 To 100
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 90 To 90
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater422Copy of Permission LetterPipelineOthersGIDC SUPPLYGIDC/RM/ABD/TFR/NRD/482605 Oct 20100.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial35.535.5ETPReuse within the Plant & Recycling35.5
(2.)Domestic1.61.6Soak PitDischarge into Surface Water Body1.6
16.1.
(a)Total Waste Water Generation 37.1
(b)Total Discharged Water 1.6
(c)Total Reused Water 35.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SLUDGEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4800Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Discarded ContainerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)366Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Iron SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4620Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)USED OILHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.015Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Spent AcidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2950Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Bleed LiquorHazardous Waste (as per Hazardous and Other Waste Management rules 2016)175Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube5601.581657.581680
(2.)PM2.5Microgram per Meter Cube5600.254156.254160
(3.)SO2Microgram per Meter Cube2400.062124.062180
(4.)PM10Microgram per Meter Cube9000.254190.2541100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)TFHAGRO WASTE120.3PM10,SO2,NOx ,PM2.5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 125
(b)Source UGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0.2418
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.2418
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0.2418
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Forest land 0
    Total 0.2418
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.2418
Total 0.2418
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA10NA
(2.)ESAsNA10NA
(3.)CorridorsNA10NA
(4.)Wildlife CorridorsNA10NA
(5.)ESZsNA10NA
(6.)Critically Polluted AreaNA10NA
(7.)WLSNA10NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA10NA
(2.)OthersSEANA10NA
(3.)ForestNA10NA
(4.)Defence InstallationsNA10NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.1218
(b)Land yet to be acquired(Ha) 0.1200
(c)Status of Land acquisition if not acquired UNDER PROCESS
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 22
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 8
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt5268120
(2.)Percentage of Total Project Area5268120
(3.)No. of Plants51015
(4.)Funds Allocated5000500010000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialemployment generation
(2.)EnvironmentalGIDC Area
(3.)FinancialGIDC
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. High Court Order
(ii)Name of the EIA Consultant B. S. RANA
(iii)Address 426,502, GUNJ BAJAR, SHAHIBAG,AHMEDABAD
(iv)Mobile No. 9909362746
(v)Landline No. 9586249761
(vi)Email Id bsranaenvio@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 30 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)28/08/2020Kindly submit Certified Compliance Report (CCR) as per the provision in case of earlier EC obtained. Submit the latest format with all relevant details.EDS Letter
(2.)20/09/2020The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBharatbhai D Patel
DesignationPartner
Name of Company (Applicant Name should not be given here)JAYVIR DYE CHEM, NARODA
AddressPlot No. 314/1/1/B & C, Phase I, Naroda
Print