Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed sugar plant expansion from 1250 TCD to 5000 TCD, Co-generation power plant 15 MW and 60 KLPD Distillery/ethanol plant.
(b)Name of the Company / Organisation SHREE RENUKA SUGARS LTD., UNIT VIII
(c)Registered Address BC 105, Havelock Road, Cantonment,Belgaum,,Belgaum,Karnataka-590001
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Shivraj Munavalli Teli
(b)Designation (Owner/ Partner/ CEO) seniormanager
(c)Address BC 105, Havelock Road, Cantonment,Belgaum,Belgaum,Karnataka-431506
(d)Pin code 431506
(e)E-mail shivraj.teli@renukasugars.com
(f)Telephone No. 831-2404000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(g) Distilleries
5(j) Sugar Industry
(b)Minor Project/Activity1(d) Thermal Power Plants
(c)Category B1
(d)Proposal Number SIA/MH/IND2/54082/2019
(e)Master Proposal Number(Single Window) SW/159809/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 276, 277, 278, 279, 298 and 323
(b)Pincode 431506
(c)Bounded Latitudes (North)
From
Degree 19.265067
Minutes
Second
From
Degree 19.272256
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.435847
Minutes
Second
From
Degree 76.436922
Minutes
Second
(e)Survey of India Topo Sheet No. 56 A/7,56 A/8, 56 A/11,56 A/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 440
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 8.23
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraParbhaniParbhaniDevnanadra
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number No.IA-J-11011/182/2019-IA-II(I)
(b)Date of Apply of TOR 30 Apr 2019
(c)Date of Issue of TOR / Standard ToR 06 Jun 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :29 Oct 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :01 Nov 2019
Distance of Public Hearing Venue from the Proposed Project :0.15
Factory site
State :Maharashtra
District :Parbhani
Tehsil :Parbhani
Village :Devnandra
150Dust emission and water pollution queriesOthers
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Distillery/ethanol plant , Sugar expansion5000 TCD sugar, 60 KLPD Distillery, 15 MW COgen-
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sugar5000Tons Crushed per DayRoad
(2.)Distillery60Kilo Litre per DayRoad
(3.)Co-generation15Mega Watt(MW)Road
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 11 Nov 2019
(iv)Valid Upto 31 Jul 2020
(v)File No. F-1.0/BO/JD(WPC)/UAN NO. 076853/R/CC-1911000423
(vi)Application No. 076853
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 227.71
(b) Funds Allocated for Environment Management (Capital) (in crores) 24
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 3.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 36
(e) Funds Allocated for Environment Management Capital(%) 10.54
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 325
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 325
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Grains (Maize, corn, Sorghum grain, broken rice and other starch based grains, etc.)43200Tons per AnnumNearby FieldRoad150 Othersas per availability nearby marketCopy of Linkage
(2.)Coal119200Tons per AnnumNearby marketRoad150 Fuel Supply AgreementCopy of Linkage
(3.)Molasses240OthersMTDOwn sugar factory + procured molassesRoad100 Othersassurance letterCopy of Linkage
(4.)Sulphur400OthersMTANearby marketRoad150 Others_Copy of Linkage
(5.)Lime1280OthersMTANearby marketRoad150 Otherssupply agreementCopy of Linkage
(6.)B- molasses180OthersMTD during seasonown sugar factoryRoad0 OthersOwn sugar factoryCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube34.618.222.260
(2.)PM10Micro Gram per Meter Cube56.636.945.5100
(3.)SO2Micro Gram per Meter Cube15.26.010.780
(4.)NOxMicro Gram per Meter Cube20.78.215.280
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.776.56.58.5
(2.)TSSmg/l5500
(3.)TDSmg/l9766987042000
(4.)Total Hardnessmg/l470330.2200600
(5.)Fluoridemg/l001.01.5
(6.)Heavy MetalsHexavalent Chromiummg/l00000
(7.)Chloridesmg/l110.772.92501000
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.776.5A
(2.)BODmg/l96D
(3.)DOmg/l5.34.6B
(4.)CODmg/l3222C
    14.4.     No. of Ambient Noise Monitoring Locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))58.245.255
(2.)Leq(Night)A-weighted decibels(dB(A))44.438.745
    14.5.     No. of Soil Sample Monitored Locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare20.115.4
(2.)pH8.17.2
(3.)N(Nitrogen)Kilogram per hectare155.4101.2
(4.)K(Potassium)Kilogram per hectare353.4123.8
(5.)Electric ConductivityMillisiemens per Centimetre984.2402.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 10
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersSurface and ground water8060.6Copy of Permission LetterPipelineOthersOpen well and jack well665118 Nov 2019470
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)sugar unit waste water430500AerobicReuse within the Plant & Recycling,Green Belt Renewal Plant430
(2.)Process Condensate, spent lees560600Condensate treatment plantReuse within the Plant & Recycling560
16.1.
(a)Total Waste Water Generation 990
(b)Total Discharged Water 0
(c)Total Reused Water 990
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Coal AshOtherstotal ash generation40320Tons0RoadOthersSent to Brick manufacturing
(2.)Bagasse AshOthersTotal ash generation2512Tons0RoadOthersBagasse ash will be sold to farmer as manure
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube22.20.80.12122.32160
(2.)SO2Microgram per Meter Cube14.50.62.67817.1780
(3.)PM10Microgram per Meter Cube55.80.50.30456.10100
(4.)NOxMicrogram per Meter Cube20.70.651.62622.380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)100 TPH boilerCoal and bagasse854.5SO27.7
(2.)100 TPH boilerCoal and bagasse854.5NOx4.2
(3.)100 TPH boilerCoal and bagasse854.5PM100.093
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1500
(b)Source own boiler with 15 MW TG
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1000 kVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 28.38
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 28.38
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 27970
(b)Waste/Barren Land 457
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 215
(e)Settlements 962
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA 0
    Total 29604
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersExisting Sugar factory area5.66Existing Sugar factory area
Total 5.66
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)NPANA0NA
(3.)ESZsNA0NA
(4.)ESAsNA0NA
(5.)WLSNA0NA
(6.)CorridorsNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Godavari
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 8.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 30
(d)Temporary Employment- During Operation 100
(e)No. of working days 270
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 9.36
(b)Percentage of Total Project Area 32.98
(c)No. of Plants to be Planted 8000
(d)Funds Allocated for Plantation 2000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmentalfuel ethanol production has less severe impact on the environment than conventional gasoline and less dangerous to health.
(2.)SocialThe industry is in the rural region. Creation of job opportunity and other business activity will improve the economy
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Supreme Court of India
(c)Case No. CIVIL APPEAL NO.3278-79/2009
(d)Orders/Directions of the court ,if any and its relevance with the proposed project Case No. CIVIL APPEAL NO.3278-79/2009 By an Order
(e)Case Details Case No. CIVIL APPEAL NO.3278-79/2009 By an Order
(f)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0075
(ii)Name of the EIA Consultant MITCON Consultancy & Engineering Services Ltd.
(iii)Address Environment Management and Engineering Division Behind DIC Office, Agri College Campus, Shivajinagar, Pune 411 005, Maharashtra (INDIA)
(iv)Mobile No. 9665043400
(v)Landline No. 0226628940
(vi)Email Id eme@mitconindia.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 16 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)22/04/2021pls go through the minutes uploaded
(2.)05/05/2021Absent letter and consideration of our project in the next SEAC meetingADS Letter
(3.)20/05/2021Pls comply Minutes
(4.)02/12/2021We have revised EIA hence, request you to withdraw the EC proposal SIA/MH/IND2/54082/2019 dated 4.07.2020ADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShivraj Munavalli Teli
Designationseniormanager
Name of Company (Applicant Name should not be given here)SHREE RENUKA SUGARS LTD., UNIT VIII
AddressBC 105, Havelock Road, Cantonment,Belgaum
Print