Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Residential and Commercial Development “Tree Land” by M/s. ABH Developers Pvt. Ltd..
(b)Name of the Company / Organisation M/S. ABH DEVELOPERS PVT. LTD.
(c)Registered Address Sr. No. 21, Gangapur Shiwar, opp. Hira Baug, Gangapur Road, Nashik,,Nashik,Maharashtra-422005
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Nishit Atal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Sr. No. 21, Gangapur Shiwar, opp. Hira Baug, Gangapur Road, Nashik,Maharashtra,Nashik,Nashik,Maharashtra-422005
(d)Pin code 422005
(e)E-mail atal29@gmail.com
(f)Telephone No. 253-2312627
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MH/MIS/53799/2020
(e)Master Proposal Number(Single Window) SW/157060/2020
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sr. No. 21/1+3/5+21/1+3/6+21/1+3/9 +24+25/1+25/2 +
(b)Pincode 422002
(c)Bounded Latitudes (North)
From
Degree 2012127
Minutes
Second
From
Degree 7344305
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 2011741
Minutes
Second
From
Degree 7344301
Minutes
Second
(e)Survey of India Topo Sheet No. F43T16,F43T12,E43B13 & E43B9
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 584
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraNashikNashikNashik
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number SIA/MH/NCP/50625/2020
(c)Date of Apply of TOR 22 Feb 2020
(d)Date of Issue of TOR / Standard ToR 13 Mar 2020
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason It is construction project, hence Public Hearing i
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)A WingLower Ground + Groiund + 19 Floors38 Tenements
(2.)B Wing to L WingBasement+Ground+1st Podium+2nd Podium+21 Floor882 tenements
(3.)P Wing to Q WingGround +1 FloorClub House-each
(4.)O WingLower Ground +Ground + 1FloorClub House
(5.)M Wing to N WingCommercial Ground+Mezzanine+3 Floors18 shops & 75 offices
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)It is construction project having Total construction Built up area: 1,96,501.85 m20Othersm2OthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 10 Jun 2020
(iv)Valid Upto 05 Sep 2020
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 188.21
(b) Funds Allocated for Environment Management (Capital) (in crores) 14.29
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 2.82
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.069
(e) Funds Allocated for Environment Management Capital(%) 7.59
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Building & construction raw materials (sand, Cement & steel)0OthersNALocal/DomesticRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Oct 2019 To 15 Jan 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube59.639.751.5100
(2.)PM2.5Micro Gram per Meter Cube25.910.518.660
(3.)SO2Micro Gram per Meter Cube23.48.913.580
(4.)NOxMicro Gram per Meter Cube27.811.0020.880
    14.2.     No. of Ground Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l182126200600
(2.)Chloridesmg/l68452501000
(3.)Fluoridemg/l0.180.111.01.5
(4.)Heavy MetalsZincmg/l0.160.1515
(5.)TSSNA0000
(6.)pHNA8.157.288.58.5
(7.)TDSmg/l4564285002000
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DONA5.902.80D
(2.)pHNA7.817.18D
(3.)BODmg/l12.105.00B
(4.)CODmg/l32.9221.00D
    14.4.     No. of Ambient Noise Monitoring Locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.641.445
(2.)Leq(Day)A-weighted decibels(dB(A))51.749.355
    14.5.     No. of Soil Sample Monitored Locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.520
(2.)N(Nitrogen)Kilogram per hectare648.180
(3.)P(Phosphorus)Kilogram per hectare4650
(4.)K(Potassium)Kilogram per hectare153.40
(5.)Electric ConductivityMillisiemens per CentimetreMicro562.320
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 6 To 7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 6 To 7
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Othersfrom NMC5361Copy of Permission LetterPipelineOthersPipeline285202028 May 2020536
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)STP Sewage water- 724m3/day687800MBBROthers348m3/day recycled for flushing & gardening348339
16.1.
(a)Total Waste Water Generation 687
(b)Total Discharged Water 339
(c)Total Reused Water 348
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)wet wasteMunicipal Solid Waste675Tons0RoadOthersTreated in OWC at site
(2.)Dry wasteMunicipal Solid Waste509Tons8RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube58.60.550.24458.84100
(2.)PM2.5Microgram per Meter Cube23.000.550.21823.2160
(3.)SO2Microgram per Meter Cube14.60.552.1816.7880
(4.)NOxMicrogram per Meter Cube26.10.551.1527.2580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set-300 kVA 2 Nos.Diesel60.03PM100.18kg/d
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 6840
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) DG sets 2 Nos. 300 kVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 6.4
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 6.4
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 6.4
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA 0
    Total 6.4
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Built Up Area6.4Total Construction Builtup area =196501.85m2
Total 6.4
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNA0NA
(2.)CorridorsNA0NA
(3.)NPANA0NA
(4.)ESAsNA0NA
(5.)Critically Polluted AreaNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)WLSNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsDevalali Camp15-
(2.)ForestReserved forest ( Near Pimpalad)8.3South West direction
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 6.4
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Godavari River- 20 m, North direction
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Aashevadi Dam
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 9.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 973
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 27
(e)No. of working days 365
(f)Total Manpower 1100
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.51
(b)Percentage of Total Project Area 7.97
(c)No. of Plants to be Planted 1179
(d)Funds Allocated for Plantation 100000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialIn indirect jobs and business opportunities to the local and nearby people. The project will have positive impact on the economic development of the region in terms of employment opportunities.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 69.8
(b)Total No. of Flats to be Build 920
(c)No. of Buildings 17
(d)Total plot area (sqm) 64130.00
(e)Total built up area (sqm) 196501.85
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity 0
(b)No. of Recharge Pits 12
    Capacity 168
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4W=1971 Nos., 2W= 2877 Nos., Cycles: 2172 Nos.
5.
Energy Saving Measures:
(a)Source/Mode proposed solar PV Panel
(b)Percentage 11
(c)Quantity 500
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. (NABET/EIA/1720/RA0073)
(ii)Name of the EIA Consultant M/s. ENVIRO ANALYSTS & ENGINEERS PVT. LTD.
(iii)Address 1003,Enviro House,10th floor. Western Edge-II,W.E Highway. Borivali(E),Mumbai-400066
(iv)Mobile No. 9321619738
(v)Landline No. 9122285464
(vi)Email Id s.shidid@eaepl.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 05 Aug 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)25/07/2020PP is informed to comply with the points raised in the minutes of 111th meeting of SEAC-3 uploaded on the portal and submit the same to SEAC-3.
(2.)01/08/2020111st SEAC ComplianceADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNishit Atal
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S. ABH DEVELOPERS PVT. LTD.
AddressSr. No. 21, Gangapur Shiwar, opp. Hira Baug, Gangapur Road, Nashik