| Form-1 | | APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE | | | | 1. Basic Informations | | Project Name | Expansion of API (Bulk drug and intermediates manufacturing) unit by M/s. Sri Krishna Pharmaceuticals Limited - Unit IV | Company/Organisation Name | SRI KRISHNA PHARMACEUTICALS LIMITED, | | Registered Address | Sri Krishna Pharmaceuticals Limited, C-4 IDA, Uppal, Hyderabad Telangana 500039 | Legal Status of the Company | Private |
| | 2. | | Address for the correspondence: | | (a)Name of the Applicant | G Chandra Sekhar | | (b)Designation (Owner/ Partner/ CEO) | DGM-Corporate EHS | | (c)Address | M/S SRI KRISHNA PHARMACEUTICALS LIMITED, Unit-IV
Sy. No. 296/7/10, INDUSTRIAL DEVELOPMENT AREA, BOLLARAM, JINNARAM (M), MEDAK DISTRICT, TELANGANA STATE,,Jinnaram,Medak,Telangana-502325 | | (d)Pin code | 502325 | | (e)E-mail | gcssrikrishna@gmail.com | | (f)Telephone No. | 40-23748555 | | (g)Fax No. | | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| | 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a)Major Project/Activity | 5(f)-API
| | (b)Minor Project/Activity | NIL | | (c)Category | B2 | | (d)Proposal Number | SIA/TG/IND2/152928/2020 | | (e)Master Proposal Number(Single Window) | SW/152927/2020 | | (f)EAC concerned (for category A Projects only) | Industrial Projects - 2 | | (g)Project Type(New/Expansion/Modernization) | Expansion |
|
| | 4. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Telangana | |
| | Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Telangana | Sangareddy | Jinnaram | IDA Bollaram | | | 5. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | Yes | | (c)Reason | -1 | | (d)Supporting Document | NILL | |
| | Location of the project | Sy. No. 296/7/10, Industrial Development Area, Bollaram, Jinnaram Mandal, Sangareddy District, Telangana | | | Town / Village (Name of more than one town may be entered by separating with) | IDA Bollaram | Plot/Survey/Khasra No. (Name of more than one town may be entered by separating with) | Sy. No. 296/7/10 | | State | Telangana | District | Sangareddy | | Tehshil | Jinnaram | Pincode | 502325 | | Nearest railway station | Patancheru | Distance from the project site | 6.77 | | Nearest airport | Rajiv Gandhi International Airport | Distance from the project site | 35.25 | | Nearest Town/City/District Headquarters | Sangareddy | Distance from the project site | 27 | | Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) | Bollaram Village | Upload GPS file | Copy of Kml File  Uploaded GPS file | | Shape of the project land | Block (Polygon) | Site alternative under consideration(If any) | Uploaded Site alternative under consideration | | Brief summary of project | Uploaded Brief summary of project | | | | Does your project location falls under out of any following areas | Patancheru-Bollaram (A.P.) | | | | Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) | 2450 | Existing Built Up Area(In Meter /Sqr) | 12140.62 | | Does it attract any of the general conditions given below? | Yes | | | | Does it attract the specific condition given below? | No | | | | Interlinked Projects | No | | | | Whether separate application of interlinked projects has been submitted? | | Date of Submission | | | Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | | | Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | | | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No | | | | Whether there is any Government Order/Policy relevent/relating to the site? | No | | | | Forest land involved(hectares) | No forest land involved | | | | Is there any litigation pending against the project? | No | | |
| 1. | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | The proposal is for expansion Bulk Drugs Unit Chemicals in the existing unit. No additional land.
Total Land area after proposed expansion 4.5 Acres. | | 1.2 | Clearance of existing land, vegetation and buildings? | No | The proposal is for expansion Bulk Drugs Unit Chemicals in the existing unit. No additional land.
Total Land area after proposed expansion 4.5 Acres | | 1.3 | Creation of new land uses? | No | | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil Testing completed | | 1.5 | Construction works? | Yes | Construction activity involves creation of new additional utilities like Boiler, DG set, Chilling Plant etc and ZLD system. | | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Construction labor from local villages shall be employed. | | 1.8 | Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations | Yes | Storage facilities shall be constructed. No major cut and fill or excavation is anticipated. | | 1.9 | Underground works including mining or tunneling? | No | | | 1.10 | Reclamation works? | No | | | 1.12 | Offshore structures? | No | | | 1.13 | Production and manufacturing processes? | Yes | Enclosed in Annexure – I | | 1.14 | Facilities for storage of goods or materials? | No | Raw materials and solvents shall be stored with safety precautions. | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Solid waste shall be disposed to end users/recyclers or sent to incineration. Effluent generated from the plant are treated and reused. Details presented in Annexure II | | 1.16 | Facilities for long term housing of operational workers? | No | Local people shall be employed. | | 1.17 | New road, rail or sea traffic during construction or operation? | No | | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | | | 1.20 | New or diverted transmission lines or pipelines? | No | | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | | | 1.22 | Stream crossings? | No | | | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Total water required shall increase from 104.0 KLD to 734.4 KLD out of which 394.4 KLD shall be met from TSIIC (Industrial supply) and the balance shall be recycled water. | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | The construction material shall be drawn from local sources within 10 – 15 km. There is no transport of personnel, as the construction workers shall be drawn from local villages. | | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | The proposed project shall increase the employment potential and hence may lead to migration to surrounding villages. | | 1.29 | Introduction of alien species? | No | | | 1.30 | Loss of native species or genetic diversity? | No | | | 1.31 | Any other actions? | No | | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Existing Unit | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Total water required shall increase from 104.0 KLD to 734.4 KLD out of which 394.4 KLD shall be met from TSIIC (Industrial supply) and the balance shall be recycled water.
(Water Balance Enclosed in Annexure III) | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Shall be sourced from the local villages. | | 2.5 | Forests and timber (source – MT) | No | | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | The required energy shall be drawn from TS TRANSCO. The power shall be drawn from DG sets during load shut downs. Existing DG sets of 1 x 625 KVA and proposed 1 x 1500 KVA DG sets shall be provided to cater to energy requirement during load shut downs. The other energy source is coal fired boilers to meet the steam requirement for process and ZLD system. It is proposed to establish with 1 X 5 TPH and 1 x 10 TPH boilers. Existing 1 x 3 TPH coal fired boiler will be replace with proposed 1 x 5 T | | 2.7 | Any other natural resources (use appropriate standard units) | No | | |
| 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Solvents shall be used as reaction media. MSIHC rules shall be followed during storage, transportation and handling of raw materials and hazardous chemicals. | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Shall increase the employment potential for locals and affect the living conditions for betterment. | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | No sensitive receptors are present in the immediate vicinity of the site. The project shall not have any significant impact on vulnerable groups of people. | |
| 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | No | | | 4.2 | Municipal waste (domestic and or commercial wastes) | No | Wastes from canteen, other commercial wastes like paper, empty containers etc. The canteen wastes and commercial wastes shall be in the range of 5 kg/day | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | The quantity of hazardous waste generated during operation contain salts from evaporators, stripper distillate, process residue, and solvent residues, ETP sludge and filtration media etc. enclosed in Annexure – IV | | 4.4 | Other industrial process wastes | Yes | Enclosed at Annexure IV | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sludge from Effluent treatment plant and Salts from MEE & ATFD shall be sent to TSDF. | | 4.7 | Construction or demolition wastes | Yes | Construction activity involves creation of new additional utilities like boiler, DG set, Chilling Plant etc and enhancement of treatment system. | | 4.8 | Redundant machinery or equipment | No | | | 4.9 | Contaminated soils or other materials | No | | | 4.10 | Agricultural wastes | No | | | 4.11 | Other solid wastes | No | Enclosed at Annexure IV | |
| 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Coal Shall be used as fuel for boiler. Diesel is for DG set. Quantity of fuel and emissions details are enclosed in Annexure V | | 5.2 | Emissions from production processes | Yes | Enclosed in Annexure - VI | | 5.3 | Emissions from materials handling including storage or transport | No | Material transfer takes place in closed pipeline systems. | | 5.4 | Emissions from construction activities including plant and equipment | Yes | Dust may rise during transport of material and construction activity. The dust emissions shall be mitigated by water spraying on the roads within the premises. | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust may rise during transport of material and construction activity. The dust emissions shall be mitigated by water spraying on the roads within the premises. | | 5.6 | Emissions from incineration of waste | No | | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | | | 5.8 | Emissions from any other sources | No | | |
| 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Material transport and construction equipment shall be source of noise, while transfer pumps, vacuum systems, DG sets are the sources of noise during operation. | | 6.2 | From industrial or similar processes | Yes | DG sets, controlled by providing Acoustic Enclosures. | | 6.3 | From construction or demolition | Yes | Noise during construction shall be due to construction equipment and emergency DG sets. | | 6.4 | From blasting or piling | No | | | 6.5 | From construction or operational traffic | No | The increased traffic shall not have any significant impact. | | 6.6 | From lighting or cooling systems | No | | | 6.7 | From any other sources | No | | |
| 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | No | All the hazardous materials will be stored in MS drums, in a covered shed and no contamination of soil is expected | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | All the wastes from domestic operations are sent to Biological effluent treatment plant followed by RO plant. | | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | All the emissions from process are controlled by providing control equipment like scrubbers, Dust Collectors and emissions from boilers shall be controlled by providing bag filters. | | 7.4 | From any other sources | No | | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | |
| 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | All Inbuilt Safety precautions will be adopted and there will not be any damage to environment or human health | | 8.2 | From any other causes | No | | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | | |
| 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | The project shall enhance the socio economic status of the area by increasing the demand for housing, improving the employment. There are no major support industries required for this plant. | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | | | 9.3 | Set a precedent for later developments | No | | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | The baseline environmental status of the surrounding areas is within the prescribed limits as observed from the Secondary data. | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Wailal RF – N – 7 Km
Pottaguda RF – NW - 8.6 Km
Kazipalli RF – N – 2.7 Km
Kodakanchi RF – NW – 8.8 Km
Dundigal RF – NE – 8.7 Km
Suraram RF – E – 9.5 Km
Gajularamaram RF – E – 9.3 Km
Borampet RF – E – 9.1 Km | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | | | 4 | Inland, coastal, marine or underground waters | No | | | 5 | State, National boundaries | No | | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | | | 7 | Defence installations | No | | | 8 | Densely populated or built-up area | Yes | Bollaram – 1.45 Km. | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | 1.5 Km away from the site | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | | | | Essential Details Sought |
|---|
| S. No. | EDS Sought Date | EDS Sought | Letter |
|---|
| NO Record | | | Additional Details Sought |
|---|
| S. No. | ADS Sought Date | ADS Sought | Letter |
|---|
| NO Record | | | | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | | | | Name of Applicant | G Chandra Sekhar | | Designation | DGM-Corporate EHS | | Name of Company (Applicant Name should not be given here) | SRI KRISHNA PHARMACEUTICALS LIMITED, | | Address | Sri Krishna Pharmaceuticals Limited, C-4 IDA, Uppal, Hyderabad |
|
|