Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Soapstone mining at Village: Biladi, Tehsil: Bageshwar, District- Bageshwar by M/s Shiv Shakti Mines and Minerals
(b)Name of the Company / Organisation SHIV SHAKTI
(c)Registered Address Ms Shiv Shakti Mines and Minerals,Bageshwar,Uttarakhand-263642
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Shiv Shakti
(b)Designation (Owner/ Partner/ CEO) Ms
(c)Address
(d)Pin code 263642
(e)E-mail shaktishivmines.24@gmail.com
(f)Telephone No. 172-4616225
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UK/MIN/52982/2018
(e)Master Proposal Number(Single Window) SW/152288/2020
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. khasra details attached in Mining Plan
(b)Pincode 263642
(c)Bounded Latitudes (North)
From
Degree 29514056
Minutes
Second
From
Degree 29514056
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 79512684
Minutes
Second
From
Degree 79512684
Minutes
Second
(e)Survey of India Topo Sheet No. H44N13F
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1236
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 00
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttarakhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)UttarakhandBageshwarBageshwarBiladi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 68/SEAC
(b)Date of Apply of TOR 24 Dec 2018
(c)Date of Issue of TOR / Standard ToR 01 Jun 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :28 Dec 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Jan 2020
Distance of Public Hearing Venue from the Proposed Project :0.5
near village Biladi
State :Uttarakhand
District :Bageshwar
Tehsil :Bageshwar
Village :Biladi
110Transportation routeOthers
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Soapstone miningTotal production - 92304
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Soapstone mining20809Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 08 Apr 2020
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.35
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.047
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.007
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 00
(e) Funds Allocated for Environment Management Capital(%) 13.43
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 00
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)000Tons per AnnumnaRoad00 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube10.55.710.1080
(2.)NOxMicro Gram per Meter Cube22.215.12280
(3.)PM10Micro Gram per Meter Cube7950.1078.78100
(4.)PM2.5Micro Gram per Meter Cube4224.3039.8960
    14.2.     No. of Ground Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsFemg/l0.330.160.31
(2.)Total Hardnessmg/l187181200600
(3.)Fluoridemg/l0.70.411.5
(4.)pHNA7.937.068.50
(5.)TSSmg/l00000000
(6.)TDSmg/l2862585002000
(7.)Chloridesmg/l30192501000
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.837.64B
(2.)CODmg/l76B
(3.)BODmg/l2.62.0B
(4.)OthersFemg/l0.150.13B
(5.)DOmg/l6.26.0B
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))55.34575
(2.)Leq(Night)A-weighted decibels(dB(A))48.632.070
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent0.0520.038
(2.)K(Potassium)Milliequivalents per 100 Gram0.220.16
(3.)pH7.427.18
(4.)P(Phosphorus)Milligram per Kilogram18.313.9
(5.)Electric ConductivityMillisiemens per Centimetre226164
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 7
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersNatural spring70Copy of Permission LettermodeOthersWater tankOtherswater TankNA17 Jul 20197.0
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic1.62.0septic tankReuse within the Plant & Recycling1.6
16.1.
(a)Total Waste Water Generation 1.6
(b)Total Discharged Water 0
(c)Total Reused Water 1.6
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)InterburdenOthersPit I Mine waste2860.84Tons0RoadOthersBackfilling
(2.)Top soilOthersPit I Mine waste389.87Tons0RoadOthersBackfilling and in Green area
(3.)Top soilOthersPit II Mine waste324.89Tons0RoadOthersBackfilling and in Green area
(4.)InterburdenOthersPit II Mine waste1601.87Tons0RoadOthersBackfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube9.7300.0012080
(2.)PM10Microgram per Meter Cube86.5800.0010.580100
(3.)PM2.5Microgram per Meter Cube00000
(4.)NOxMicrogram per Meter Cube25.8700.0002080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00PM100.580
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source na
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) na
(e)Stack Height (in m) 00
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 4.996
    Total Land 4.996
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 4.996
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Total area 0
    Total 4.996
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Township0
(2.)Ash Pond0
(3.)OB Dump Area0
(4.)Safety Zone0
(5.)Tailing Pond0
(6.)LandFill0
(7.)Water Reservoir0
(8.)Desalination Plant0
(9.)Area for Solid Waste Management0
(10.)Built Up Area0
(11.)Green belt0.05
(12.)Quarry Area0.069pits and quarries
(13.)OthersFoot Track/PWD road0.039
(14.)Main Plant4.838Remaining area
Total 4.996
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)ESAsNA0NA
(3.)CorridorsNA0NA
(4.)Wildlife CorridorsNA0Not found in 10 km of project area
(5.)WLSNA0NA
(6.)NPANA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestReserved forest2nearest
(2.)Defence InstallationsNA0NA
(3.)Archaeological SitesNa0NA
(4.)OthersNaNa0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.996
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Mining
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Leopard and Asiatic black bear
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sarayu River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 52
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 275
(f)Total Manpower 52
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.05
(b)Percentage of Total Project Area 1.00
(c)No. of Plants to be Planted 300
(d)Funds Allocated for Plantation 20000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalLandscaping
(2.)FinancialRevenue generation
(3.)SocialEmployment will be generated in the local area which will improve the social and economic condition of the residents.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)SoapstoneMinor
2.
Mine Capacity in ROM (Run of Mine) 92304
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 1713/VII-1/2017/7-Soapstone/17
(b)Date of Approval 26 Dec 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Mines
(e)Approved Mining Lease Area 4.996
(f)Approved Capacity 92304
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.555024
(b)Mineable Reserves (Million Ton) 0.093435
(c)Extractable Reserves(Million Ton) 0.092304
(d)Percent(%) of Extraction 98
(e)Grade of Coal /Ore /Mineral 2.6
(f)Stripping Ratio 1 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 21
(i)Mining Method Opencast
(j)Life of Mine (Years) 5
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 4.996
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 26 Dec 2017
(iii)Validity of LOI 5
(iv)Reference No. of LOI 1713/VII-1/2017/7-Soapstone/17
(c)Whether Lease Deed Executed ? No
(i)Reason thereof NA
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof NA
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 0.085
(iii)Height (in meter) 3
(iv)Quantity (in Million Cubic meter) 56056
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 7281
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 7000
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 100
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0.069 (hectare) at a Depth of 3 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 1.59
13.
Details of Transportation:
(a)In Pit/Underground to Surface na
(b)Surface to Siding/Loading na
(c)Transportation / Conveyor Details na
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND4.99604.996
(2.)SETTLEMENTS000
(3.)OTHERS(Specify)NA000
(4.)WASTE LAND000
(5.)FOREST LAND000
(6.)GRAZING LAND000
(7.)SURFACE WATER BODIES000
TOTAL4.99604.996
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)ROADS000.0390.039
(2.)INTERNAL OB DUMPS0000
(3.)BUILT UP AREA (COLONY/OFFICE)0000
(4.)GREEN BELT0.05000.05
(5.)OtherNA0000
(6.)EXTERNAL OB DUMPS0000
(7.)TOP SOIL STORAGENA0000000
(8.)EXCAVATION/QUARRY0000
(9.)VIRGIN AREA0000
TOTAL0.0500.03900.089
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0.085
(c)Quarry(in hectare) 1.59
(d)Safety Zone(in hectare) 0
(e)Final Void of 0 (hectare) at a Depth of 0 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 300
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0.015
(h)Total afforestation plant (in hectare) 0.05
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)0000923040
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA095
(ii)Name of the EIA Consultant M/s. Eco Laboratories & Consultants Pvt. Ltd.
(iii)Address Eco Bhawan, E-207 Industrial Area, Phase VIII-B (Sector-74) Mohali (Punjab)-160071
(iv)Mobile No. 9814003103
(v)Landline No. 0172461622
(vi)Email Id ems@ecoparyavaran.org
(vii)Category of Accreditation B
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 13 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShiv Shakti
DesignationMs
Name of Company (Applicant Name should not be given here)SHIV SHAKTI
AddressMs Shiv Shakti Mines and Minerals
Print