| Form-1 | | APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE | | | | 1. Basic Informations | | Project Name | Proposed Expansion of API, Fine Chemicals, Bulk Drugs& Intermediates Manufacturing Unit | Company/Organisation Name | M/S. VINEET LIFE SCIENCES PVT LTD | | Registered Address | Survey No: 1019, 1020/A, 1020/B, 1021, 1022, 1014, Jangamaheswarapadu Village Durgi Mandal, Guntur District,
Andhra Pradesh State Andhra Pradesh 522612 | Legal Status of the Company | Private |
| | 2. | | Address for the correspondence: | | (a)Name of the Applicant | Murali Mohan K | | (b)Designation (Owner/ Partner/ CEO) | Director | | (c)Address | H.No. 5-5-160, 3rd Floor, Malleswari Nilayam, Opp. Vishnu Theatre, Chintalkunta , L.B. Nagar,Hyderabad,Saroornagar,Rangareddi,Telangana-500074 | | (d)Pin code | 500074 | | (e)E-mail | vineetlife2020@gmail.com | | (f)Telephone No. | 40-24128833 | | (g)Fax No. | | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| | 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a)Major Project/Activity | 5(f)-API
| | (b)Minor Project/Activity | NIL | | (c)Category | B2 | | (d)Proposal Number | SIA/AP/IND2/152071/2020 | | (e)Master Proposal Number(Single Window) | SW/152070/2020 | | (f)EAC concerned (for category A Projects only) | Industrial Projects - 2 | | (g)Project Type(New/Expansion/Modernization) | Expansion |
|
| | 4. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Andhra Pradesh | |
| | Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Andhra Pradesh | Guntur | Durgi | Jangamaheswarapadu | | | 5. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | Yes | | (c)Reason | -1 | | (d)Supporting Document | NILL | |
| | Location of the project | M/s. Vineet Life Sciences Pvt Ltd Plot No.1019,1020/A,1020/B,1021,1022,1014 Jangamaheswarapadu Village Durgi Mandal Guntur District Andhra Pradesh State. | | | Town / Village (Name of more than one town may be entered by separating with) | Jangamaheswarapadu | Plot/Survey/Khasra No. (Name of more than one town may be entered by separating with) | 1019,1020/A,1020/B, 1021,1022,1014 | | State | Andhra Pradesh | District | Guntur | | Tehshil | Durgi | Pincode | 522612 | | Nearest railway station | Macherla railway station | Distance from the project site | 14.86 | | Nearest airport | Vijayawada International Airport | Distance from the project site | 134.25 | | Nearest Town/City/District Headquarters | Durgi | Distance from the project site | 5.38 | | Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) | Jangamaheswarapadu Village,
Durgi Mandal,
Guntur District,
Andhra Pradesh State | Upload GPS file | Copy of Kml File  Uploaded GPS file | | Shape of the project land | Block (Polygon) | Site alternative under consideration(If any) | Uploaded Site alternative under consideration | | Brief summary of project | Uploaded Brief summary of project | | | | Does your project location falls under out of any following areas | None of above Areas | | | | Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) | 2464 | Existing Built Up Area(In Meter /Sqr) | 4856.23 | | Does it attract any of the general conditions given below? | No | | | | Does it attract the specific condition given below? | No | | | | Interlinked Projects | No | | | | Whether separate application of interlinked projects has been submitted? | | Date of Submission | | | Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | | | Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | | | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No | | | | Whether there is any Government Order/Policy relevent/relating to the site? | No | | | | Forest land involved(hectares) | Nil | | | | Is there any litigation pending against the project? | No | | |
| 1. | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | Project is “Proposed Expansion of API, Fine Chemicals, Bulk Drugs & Intermediates Manufacturing Unit” The existing facility is going for expansion with the additional land requirement. Without any change in land use and land cover. | | 1.2 | Clearance of existing land, vegetation and buildings? | No | Proposed expansion is barren land. | | 1.3 | Creation of new land uses? | No | Not applicable | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | The existing facility is going for expansion with the additional land requirement. | | 1.5 | Construction works? | Yes | For proposed expansion, production block, boiler house, utilities & canteen will be constructed along other minor construction activities and operate along with existing plant and machineries. | | 1.6 | Demolition works? | No | Not required | | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Not applicable.
Local labors will be utilized for the construction purpose. | | 1.8 | Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations | No | Not required | | 1.9 | Underground works including mining or tunneling? | No | Not applicable | | 1.10 | Reclamation works? | No | Not required | | 1.11 | Dredging? | No | Not applicable | | 1.12 | Offshore structures? | No | Not required | | 1.13 | Production and manufacturing processes? | Yes | The manufacturing process flow sheet for existing and proposed products along with material balance is attached as an Annexure 7. | | 1.14 | Facilities for storage of goods or materials? | Yes | Operation Phase:
S. No Description Capacity (MT)
Existing Additional Total
1 Raw materials 200 300 500
2 Hazardous raw materials 68 132 200
3 Solvents 170 330 500
4 Products Storage 20 30 50 | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | 1. Municipal Solid waste management:
S. No Waste Existing (Kg/day) Proposed
(Kg/day) Expansion
(Kg/day) Method of disposal
1 Organic 54 27 81 Send to Cement Industries
2 Inorganic 36 54 90 Send to TSDF
(As per CPHEEO norms: 0.45 kg/day/per capita)
2. Hazardous waste management:
Waste Category Hazardous waste Generated Quantity Method of Disposal
Existing Proposed After Expansion
-- Organic Solid Waste (Kg/day) 1130 226 1356 Send to Cement Industries
34.3 Inorganic solid waste (Kg | | 1.16 | Facilities for long term housing of operational workers? | No | Not Applicable, Local labor force will be utilized | | 1.17 | New road, rail or sea traffic during construction or operation? | No | The present road facilities will be utilized for the proposed construction and operation work. | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | The present road facilities will be utilized for the proposed construction and operation work. | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not Applicable | | 1.20 | New or diverted transmission lines or pipelines? | No | Not Applicable | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not Applicable | | 1.22 | Stream crossings? | No | Not Applicable | | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Abstraction of water is from ground. water supply is from Inhouse bore wells. Ground water approval is enclosed in Annexure 10. | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not Applicable | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | No | Not Applicable | | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | | 1.28 | Influx of people to an area in either temporarily or permanently? | No | Existing (Nos) 200
Proposed (Nos) 100
Total after expansion (Nos) 300 | | 1.29 | Introduction of alien species? | No | Not Applicable | | 1.30 | Loss of native species or genetic diversity? | No | Not Applicable | | 1.31 | Any other actions? | No | Not Applicable | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | No | The existing facility is going for expansion with the additional land requirement. It’s a barren land | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | S. No Description Existing Proposed Total
1 Total Water requirement (KLD) 84.81 67.19 152
2 Fresh Water requirement (KLD) 48.81 27.19 76
3 Source (Fresh water) Ground water In house Bore wells
Water Requirement:
Source Consumption Quantity (KLD) Total Water Breakup (KLD)
Existing Proposed Total After Expansion Fresh Treated
Domestic 2 13.5 15.5 15.5 -
Process 33 27.5 60.5 60.5 -
Washings 2 3 5 - 5
Cooling tower & Boiler make up 38.81 14.19 53 - 53
DM plant regeneration & scrubber 4 | | 2.3 | Minerals (MT) | No | Not Applicable | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Soil, Sand, gravel and stone aggregates will be procured from nearby sources.
Topsoil excavated during construction activities will be stored and used for construction work/Greenbelt development within the project site. | | 2.5 | Forests and timber (source – MT) | No | Not Applicable | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | S.No Description Capacity Source
Existing Proposed After Expansion
1 Power requirement (kVA) 800 100 900 State Power Distribution Corporation
2 DG Sets (kVA) 1 x 380 2x750 1500
--
1 x 250
3 Coal fired boiler (TPH) 1 x 2.0 2 x 6.0 12
(One operational & one standby) --
1 x 3.0
4 HSD (Lit/day) 75.6 180 255.6 DG Set
5 Coal (TPD) 12.5 36 48.5 Government Allocation or From Local Authorized Sources
6 Briquettes & fire wood (TPD) - 60 60 Local Area | | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | |
| 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | This is Active pharmaceuticals ingredients manufacturing process and solvents will be used in the process. A separate storage facility is provided for the storage of solvents and raw materials. Chemicals are handled as per MSDS. List of raw materials are attached as an Annexure-8. | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not applicable. | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Systems are already in place. Additional employment offers will be created by expansion. | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | No such activities involved in the existing as well as projected activity. No hospital and schools are available within 3 kilometer radius | | 3.5 | Any other causes | No | Not applicable | |
| 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | No | Not applicable | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Municipal Solid waste management:
S. No Waste Existing (Kg/day) Proposed
(Kg/day) Expansion
(Kg/day) Method of disposal
1 Organic 54 27 81 Send to Cement Industries
2 Inorganic 36 54 90 Send to TSDF
(As per CPHEEO norms: 0.45 kg/day/per capita) | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Hazardous waste management:
Waste Category Hazardous waste Generated Quantity Method of Disposal
Existing Proposed After Expansion
-- Organic Solid Waste (Kg/day) 1130 226 1356 Send to Cement Industries
34.3 Inorganic solid waste (Kg/day) 390 531.6 921.6 Send to TSDF
35.3 MEE Salts (Kg/day) 1730 1400 3130 Send to TSDF
28.3 Spent Carbon (Kg/day) 110 128 238 Send to Cement Industries
35.3 ETP Sludge (Kg/day) 50 22 72 Send to TSDF
-- Coal Ash from Boiler (Kg/day) 5880 1190 7070 Send | | 4.4 | Other industrial process wastes | No | Not Applicable | | 4.5 | Surplus product | No | Not Applicable | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | S. No Description Existing (KLD) Proposed
(KLD) After Expansion
(KLD) Treatment Units Final Disposal Points
1 Domestic
1.8 11.2 13 STP (Daiki) Treated sewage will be used for Greenbelt
Industrial Effluent Generation
2 HTDS (process & washing) 32 27 59 Stripper, unit with flash condenser, MEE of 70 KL capacity with 3 calendrias. The residue to send to Agitated Thin Film Drier (ATFD). The ATFD salts to TSDF.
Condensate from MEE and ATFD to ETP.
3 LTDS (cooling & boiler blow down, DM pla | | 4.7 | Construction or demolition wastes | Yes | Construction waste e.g., excavated soil used for land fill up/road facility. Minimum quantity will be disposed within the site. | | 4.8 | Redundant machinery or equipment | Yes | Construction machinery will be taken back by the contractor.
Any redundant items during operation will be periodically sold as per the norms to the approved vendors. | | 4.9 | Contaminated soils or other materials | Yes | Construction waste and cement contaminated soil will be used for road works. | | 4.10 | Agricultural wastes | No | Not Applicable | | 4.11 | Other solid wastes | No | Not Applicable | |
| 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Details Capacity Source Control Measures
Existing Proposed After Expansion
Back up (DG)
(kVA) 1 x380 2 x750 1500 DG set Stack of height 3 ARL m is provided
1 x 250
Boilers
(TPH) 1 x 2.0 2 x 6.0 12
(One operational & one standby) Coal/Briquettes & fire wood Stack of height 30 m AGL is provided. Apart from this Cyclone Separators followed by bag filter is also provided.
1 x 3.0 | | 5.2 | Emissions from production processes | Yes | S. No Source of Emission Capacity Existing Proposed After Expansion Method & Control Measures
Nos
1. SS Reactors 0.63 KL to 8.0 KL 34 45 79 Multi stage scrubbers
2. GL Reactors 0.63 KL to 6.3 KL 10 15 25
3. Centrifuge 48” 4 6 10 --
4. Tray dryers 96 trays 4 6 10 --
5. Vacuum tray dryers 96 trays 4 6 10 -- | | 5.3 | Emissions from materials handling including storage or transport | No | Transportation of most of the raw materials will be through trucks and tankers. | | 5.4 | Emissions from construction activities including plant and equipment | Yes | During construction, the dust will be minimized by sprinkling of water and also by proper storage. | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | The dust is minimized by water sprinkling. The sewage is treated in STP used for greenbelt purpose. | | 5.6 | Emissions from incineration of waste | No | No incineration activity is involved | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | No burning activity is involved | | 5.8 | Emissions from any other sources | No | Not Applicable | |
| 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | The DG sets will be in operation only during power failure. Moreover, the DG rooms will be acoustically enclosed.
Noise of existing project is monitored on regular basis and is less than 75 dB (A). | | 6.2 | From industrial or similar processes | Yes | Noise generation at source will be complied by keeping the noise within the prescribed limits. Employees are provided with PPE’s. | | 6.3 | From construction or demolition | Yes | Excavation, drilling and welding will be carried out during construction phase which will be temporary in nature. Measures will be taken to ensure that noise from construction activity is limited to site. | | 6.4 | From blasting or piling | No | Not Applicable | | 6.5 | From construction or operational traffic | Yes | During the construction activities, utmost care will be taken to control the noise levels within the standards. While operation traffic will contribute some noise level and mitigation measures will be followed. | | 6.6 | From lighting or cooling systems | No | Negligible.
LED Lights have been provided/ proposed | | 6.7 | From any other sources | No | None | |
| 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | No | All operators & maintenance personnel concerned with the plant will be given data sheets for hazardous chemicals and to be trained to combat any leakage spillage, etc.
Proper storage facilities will be provided to prevent the risk of contamination. | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | The total water requirement is 152 KLD, Fresh water requirement is 76 KLD will be met from ground water in house bore wells. The total recycled water is 76 KLD
Existing:
HTDS effluent generation is 32 KLD from Process and washing and will be stripped Stripper effluents for forced evaporation in MEE followed by ATFD. Condensate from MEE shall be routed to LTDS effluents for filtration in RO. RO permeate recycled for utilities and RO rejects to MEE followed by Nutch filter/ Centrifuge salts | | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Air control measures installed at site like cyclone separator followed by bag filter, chimney stack as per recommendation of CPCB and for effluent ZLD system will be maintained. | | 7.4 | From any other sources | No | Not applicable. | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not applicable. | |
| 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Hazardous substances like solvents will be used in operational phase.
Proper handling process will be followed as recommended in the MSDS for the solvents and any hazardous materials. | | 8.2 | From any other causes | No | None | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | Earthquake:
The project site falls under seismic zone-II (Low damage risk active) according to the Indian Standard Seismic Zoning Map. Therefore, suitable earthquake design was followed in structural and basis civil design.
Flood:
It is not flood prone area
Landslide
May not occur since it is a plain terrain. | |
| 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | Not applicable, since the unit is an Expansion of API, Fine chemicals, Bulk Drugs & Intermediate Manufacturing Unit, no housing development is proposed. | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not Applicable | | 9.3 | Set a precedent for later developments | No | Not Applicable | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not Applicable | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | S.No Places Distance ~(km) Direction
1 Ancient buddhist remains with brahmi inscriptions on the mound 13.39 NNE | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Water Bodies
S. No Water bodies Distance ~ (km) Direction
1 Vedulapaya Vagu 0.39 W
2 Gundala Vagu 1.71 ESE
3 Chandravanka R 5.95 NW
4 Buggavagu Reservoir 6.75 NNE
5 Chandravanka R 6.84 W
6 Edibogula Vagu 9.77 W
7 Nagarjuna Sagar Right Bank Canal/ Jawahar Canal 10.65 NE
8 Nagarjuna Sagar Right Bank Canal/ Jawahar Canal 11.79 NNW
9 Kuruva Vagu 11.96 SSW
10 Bugga Vagu 12.3 N
11 Erra Vagu 12.3 SSE
12 Chelime Vagu 13.20 SSW
Reserved Forests
S. No Reserved Forests Distance ~ (km | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Nil
Nil within 15 km radius | | 4 | Inland, coastal, marine or underground waters | Yes | S. No Water bodies Distance ~ (km) Direction
1 Vedulapaya Vagu 0.39 W
2 Gundala Vagu 1.71 ESE
3 Chandravanka R 5.95 NW
4 Buggavagu Reservoir 6.75 NNE
5 Chandravanka R 6.84 W
6 Edibogula Vagu 9.77 W
7 Nagarjuna Sagar Right Bank Canal/ Jawahar Canal 10.65 NE
8 Nagarjuna Sagar Right Bank Canal/ Jawahar Canal 11.79 NNW
9 Kuruva Vagu 11.96 SSW
10 Bugga Vagu 12.3 N
11 Erra Vagu 12.3 SSE
12 Chelime Vagu 13.20 SSW | | 5 | State, National boundaries | No | Nil | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | • NH-5, ~73.83 km, ESE
• SH-89 (Macherla – Durgi- Vinukonda), ~ 5.76 km, N | | 7 | Defence installations | No | nil | | 8 | Densely populated or built-up area | Yes | Kolagutla is densely populated with population of 3556 at a distance of ~4.04 km, NW | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | S. No Schools & Colleges Distance ~(km) Direction
1 MPP School Minchalapadu 4.29 SSW
2 Sacred Heart Public School 5.56 NNE
3 ZPHS Durgi 5.61 N
4 Kasturiba Girijana School 5.86 N
5 Saiteja English Medium School 6.36 NNW
6 AP Model School 6.63 NNW
7 Jubilee High School 12.01 NNW
8 Sri Vikas B.Ed College 12.59 NNW
9 Sri Harsha High School 13.10 NNW
10 Kids Patasala High School 14.59 NW
S. No Hospitals Distance ~(km) Direction
11 Primary Health Centre Durgi 6.04 N
S. No Religious Places | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | S. No Water bodies Distance ~ (km) Direction
1 Vedulapaya Vagu 0.39 W
2 Gundala Vagu 1.71 ESE
3 Chandravanka R 5.95 NW
4 Buggavagu Reservoir 6.75 NNE
5 Chandravanka R 6.84 W
6 Edibogula Vagu 9.77 W
7 Nagarjuna Sagar Right Bank Canal/ Jawahar Canal 10.65 NE
8 Nagarjuna Sagar Right Bank Canal/ Jawahar Canal 11.79 NNW
9 Kuruva Vagu 11.96 SSW
10 Bugga Vagu 12.3 N
11 Erra Vagu 12.3 SSE
12 Chelime Vagu 13.20 SSW
Reserved Forests
S. No Reserved Forests Distance ~ (km) Direction
1 | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not Applicable | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | This area is generally plain not prone to any natural disasters. The area under study falls in Zone-II, according to the Indian Standard Seismic Zoning Map. | | | Essential Details Sought |
|---|
| S. No. | EDS Sought Date | EDS Sought | Letter |
|---|
| (1.) | 30/04/2020 | Please remit the processing charges as per GO RT No 03 | | | (2.) | 02/05/2020 | The correction have been made as per the instruction received | | | | Additional Details Sought |
|---|
| S. No. | ADS Sought Date | ADS Sought | Letter |
|---|
| (1.) | 10/09/2021 | The applicant requested the committee for withdrwal of application. They informed that the
products list will be changed and a fresh application for EC will be applied.
The committee recommended for withdrawl of application. | | | | | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | | | | Name of Applicant | Murali Mohan K | | Designation | Director | | Name of Company (Applicant Name should not be given here) | M/S. VINEET LIFE SCIENCES PVT LTD | | Address | Survey No: 1019, 1020/A, 1020/B, 1021, 1022, 1014, Jangamaheswarapadu Village |
|
|