Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Integrated Paint Plant at Plot No. G 35, Jejuri Additional Industrial Area, Jejuri Taluka Purandhar, District Pune, Maharashtra State
(b)Name of the Company / Organisation BERGER PAINTS INDIA LIMITED
(c)Registered Address BERGER HOUSE, 129 PARK STREET,,kolkata,Kolkata,West Bengal-700017
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant SOUMYA KANTI MITRA
(b)Designation (Owner/ Partner/ CEO) ASSTMANAGER
(c)Address BERGER HOUSE, 129 PARK STREET,,Kolkata,West Bengal-700017
(d)Pin code 700017
(e)E-mail rajeevthakur@bergerindia.com
(f)Telephone No. 33-22277288
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(h) Integrated paint industry
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MH/IND2/52893/2007
(e)Master Proposal Number(Single Window) SW/151659/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. G35
(b)Pincode 412303
(c)Bounded Latitudes (North)
From
Degree 18.274
Minutes
Second
From
Degree 18.275
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 71.171
Minutes
Second
From
Degree 74.176
Minutes
Second
(e)Survey of India Topo Sheet No. E4313, E4314, E4317, E4318
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 700
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 100
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraPunePurandharJEJURI
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/1151/2007-IA.II(I)
(b)Date of Apply of EC 27 Oct 2007
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason PROJECT IS LOCATED IN INDUSTRIAL AREA
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. 20022020
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)LIQUID PAINTS (SOLVENT BASED)90003960048600OthersKLPARoad
(2.)RESIN (INTERMEDIATE CAPTIVE CONSUMPTION)60002700033000OthersMTPARoad
(3.)SOLID COLOR (POWDER COATING)300039006900OthersMTPARoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)LIQUID PAINTS90003930048600KLPA
(2.)RESIN (INTERMEDIATE CAPTIVE CONSUMPTION)60002700033000MTPA
(3.)SOLID COLOR (POWDER COATIN)300039006900MTPA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 22 Oct 2019
(iv)Valid Upto 31 Jul 2020
(v)File No. 1910000987
(vi)Application No. 0000074231
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 200
(b) Funds Allocated for Environment Management (Capital) (in crores) 5.4
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 1.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.456
(e) Funds Allocated for Environment Management Capital(%) 2.70
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 30326966
(b)Existing quantity of raw material/fuel 8463339
(c)Total quantity of raw material/fuel 38790305
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Benzoic Acid70230OtherskgINDRoad214 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 16 Nov 2019 To 14 Feb 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube58205680
(2.)OthersVOCNA111NA
(3.)PM10Micro Gram per Meter Cube996094100
(4.)SO2Micro Gram per Meter Cube10.46.59.680
(5.)NOxNA2113.720.780
    14.2.     No. of Ground Water Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.797.368.57
(2.)TSSmg/l0000
(3.)TDSmg/l24243885002000
(4.)Total Hardnessmg/l1000320200600
(5.)Chloridesmg/l391882501000
(6.)Fluoridemg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.297.65A
(2.)DOmg/l7.34.1A
(3.)BODmg/l22D
(4.)CODmg/l00D
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.851.475
(2.)Leq(Night)A-weighted decibels(dB(A))59.242.270
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.226.32
(2.)Electric ConductivityOthersµmohs/cm997272
(3.)P(Phosphorus)00
(4.)N(Nitrogen)00
(5.)K(Potassium)OthersGM/KG0.230.04
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC2301Copy of Permission LetterPipelineOthersMIDC2423 Jul 2007230
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)DOMESTIC720STPGreen Belt Renewal Plant7
(2.)INDUSTRIAL4450ETPReuse within the Plant & Recycling44
16.1.
(a)Total Waste Water Generation 51
(b)Total Discharged Water 0
(c)Total Reused Water 51
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BAG FILTER AND DUST COLLECTOR RESIDUEIndustrial Waste51.46Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)DISCARDED CONTAINERIndustrial Waste2.94Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)DISCARDED CONTAINERIndustrial Waste2.94Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)CHEMICAL SLUDGE FROM WASTE WATER TREATMENTIndustrial Waste1.23Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)SPENT SOLVENTIndustrial Waste2.45Tons250RoadAuthorized Recyclers
(6.)PAINT WASTEIndustrial Waste411.68Tons250RoadCo-Processing
(7.)PROCESS WASTEIndustrial Waste123.50Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube742501.4475.44100
(2.)SO2Microgram per Meter Cube8.42500.2538.65360
(3.)NOxMicrogram per Meter Cube17.02501.3718.3780
(4.)PM2.5NA5825005880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SETHSD30400PM10,SO2,NOx
(2.)2 STEAM BOILERHSD30.5400PM10,SO2,NOx
(3.)2 TFHBOIFUEL AND HSD30.5700PM10,SO2,NOx
(4.)2 STEAM BOILER, 1 TFHHSD30.5500PM10,SO2,NOx
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2780
(b)Source STATE ELECTRICITY BOARD
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 7.31
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 7.31
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 174.47
(b)Waste/Barren Land 32.75
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 5.62
(e)Settlements 6.27
(f)Industrial 2.04
(g)Forest 17.44
(h)Mangroves 0
(i)Marine Area 0
(j)Others : SCRUB LAND 0.09
    Total 238.68
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt2.3
(2.)Main Plant5.01
Total 7.31
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA1000
(2.)Critically Polluted AreaNA100NOT PRESENT
(3.)ESAsNA100NOT PRESENT
(4.)NPANA100NOT PRESENT
(5.)ESZsNA100NOT PRESENT
(6.)Wildlife CorridorsNA100NOT PRESENT
(7.)CorridorsNA100NOT PRESENT
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestJEJURI RESERVE FOREST1.15JEJURI
(2.)Archaeological SitesKHANDOBA TEMPLE1.15WEST DIRECTION
(3.)Defence InstallationsNA100NOT PRESENT
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 7.31
(b)Land yet to be acquired(Ha) 0.00
(c)Status of Land acquisition if not acquired acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species COMMON PEAFOWL, BLACK BUCK
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 5,00,000
(iii)Period of Implementation 5 YEARS
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area VILLAGE WATER BODY
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 1.40
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 300
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 400
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt23868.645738.597229606
(2.)Percentage of Total Project Area337.9340
(3.)No. of Plants150012002700
(4.)Funds Allocated108000240000348000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGREENBELT DEVELOPMENT
(2.)Social• Help to needy children in the schools; • Providing drinking water to nearby villagers; • Helping Gram Panchayat in improving sanitation facilities
(3.)Financial• During construction phase ~300 people will be employed on contract basis for construction activities. • Enhanced direct employment for technical/ administrative works and indirect employment opport
(4.)Social• Help to needy children in the schools; • Providing drinking water to nearby villagers; • Helping Gram Panchayat in improving sanitation facilities
(5.)Social• Help to needy children in the schools; • Providing drinking water to nearby villagers; • Helping Gram Panchayat in improving sanitation facilities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA0138
(ii)Name of the EIA Consultant Kadam Environmental Consultants
(iii)Address 871/B/3, GIDC Makarpura, Vadodara, India – 390 010
(iv)Mobile No. 9824034709
(v)Landline No. 0265613100
(vi)Email Id kadam@kadamenviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSOUMYA KANTI MITRA
DesignationASSTMANAGER
Name of Company (Applicant Name should not be given here)BERGER PAINTS INDIA LIMITED
AddressBERGER HOUSE, 129 PARK STREET,
Print