1
|
Proposal No
|
:
|
IA/KA/MIN/412694/2022
|
File No
|
:
|
IA-J-11015/45/2021-IA-II(M)
|
Proposal Name
|
:
|
Increase of Iron Ore production from 1.60 to 4.50 MTPA retaining the Manganese Ore production at 0.55 MTPA with total excavation of 26.42 MTPA (Iron Ore ROM -7.85 MTPA, Manganese Ore ROM-1.34 MTPA, Top Soil-0.19 MTPA & Waste – 17.04 MTPA) along with proposed 7.0 MTPA Ore Beneficiation Plant, 1.2 km Down Hill Conveyor System, & 0.15 MTPA Crushing & Screening Plant of Iron Ore and Manganese Ore Mine (ML No: 2678) by The Sandur Manganese & Iron Ores Limited.
|
|
State
|
:
|
|
District
|
:
|
|
Tehsil
|
:
|
|
|
Date of Submission for TOR | : | NA | Date of TOR Granted | : | NA | Date of Submission for EC | : | 30 Dec 2022 | Proposal Accepted by MS | : | 06 Jan 2023 | Date of EC Granted | : | 25 Apr 2023 |
|
Non-Coal Mining
|
THE SANDUR MANGANESE AND IRON ORES LIMITED
|
Expansion
|
|
N/A
|
N/A
|
|
|