APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Talabira II and III OCP | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/OR/CMIN/75826/2018 | Project Cost | 240100 lacs | |
| 2. | |
S. No. in the schedule | 1(a) Mining of minerals
| Project Sector | Coal Mining | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Normative 20 MTPA, Peak 23 MTPA ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 1914 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Khinda Talabira Patrapali Malda and Rampur villages in Sambalpur and Jharsuguda district | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file  | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | 430,431,432,433,434,435,436,437,438,439,440,441,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458,459,460,461,462,463,464,677,679,680,681,682,688,694,695,696,697,698,704,705,706,707, 711,712,713,714,715,719,720,722,723,724,725,726,727,732,733,734,738,739,740,741,742,743,744,745,746,747,443/753,460/789,702/792,463/794,434/796,433/797,443/798,435/799,722/827,702/829,678/984,678/985,433/995,434/996
11,12,13,14,15,16,17,18,19,20,21,22,24,28,39,41,45,46,47,52,53,55,58,59,60,65,66,68,69,70,72,73,74, 81,84,86,87,88,89,90,94,97,98,99,100,101,102,103,105,106,108,109,110,112,113,114,117,118,119,124,125,126,127,128,129,130,131,133,134,135,137,138,139,141,142,143,146,148,149,150,151,152,153,154,155,156,157,158,159,160,161,162,164,165,166,167,168,170,171,172,173,174,175,176,177,178,179,180,181,182,183184,185,186,187,188,189,190,191,192,193,194,195,196,197,198,199,200,201,202,203,204,205,206,207,208,209,210,211,212,214,215,216,217,218,219,220,222,223,224,225,227,229,230,231,232,235,236,23 | Town / Village | Khinda,Talabira,Patrapali,Malda,Rampur | State of the project | Orissa | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Orissa | Sambalpur | Rengali | (2.) | Orissa | Jharsuguda | Jharsuguda | | 10. | |
Nearest railway station along with distance in kms | lapanga, 14 km | Nearest airport along with distance in kms | jharsuguda, 24 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | jharsuguda , 18 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Since Forest proposal is not getting uploaded so approval under the FC act mentioned as 'No' , may please be considered.
Panchayat- Khinda, Patrapali, Malda | | 13. | Name of the Applicant | ANBU | | 14. | Registered Address | "NEYVELI HOUSE",
135,PERIYAR EVR HIGH ROAD,
KILPAUK,
CHENNAI | | 15. | |
Address for correspondance: | Name of the Company | NEYVELI LIGNITE CORPORATION LIMITED | Name of the Applicant | ANBU | Designation (Owner/ Partner/ CEO) | GENERAL MANAGER/BARSINGSAR MIN | Pin code | 607803 | E-mail | gm.mineplanning@nlcindia.in | Telephone No. | 4142-228413 | Fax No. | 4142-4142228413 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | Yes | Area of Forest land Involved (hectares) | 1038.187 ha. | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | Excavation in 972.530 Ha
Infrastructure-271.960 Ha
Embankment -35.190 ha
External dump-171.63 Ha | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Mine excavation in 673.210 Ha | 1.3 | Creation of new land uses? | Yes | Mining purpose | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | carried out for EIA report. | 1.5 | Construction works? | Yes | Infrastructure-271.960 Ha | 1.6 | Demolition works? | Yes | Demolition of houses etc will be started after handing over Land. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Excavation within 972.530 Ha | 1.9 | Underground works including mining or tunnelling? | No | | 1.10 | Reclamation works? | Yes | concurrent reclamation will be done as per Mine Closure Plan. | 1.12 | Offshore structures? | No | | 1.13 | Production and manufacturing processes? | No | | 1.14 | Facilities for storage of goods or materials? | Yes | Facilities for Storage of Explosive , diesel ,lubricants and other store items shall be developed. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Facilities for treatment or disposal of solid waste or liquid effluents will be developed. | 1.16 | Facilities for long term housing of operational workers? | Yes | housing for long term operational workers will be developed. | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | During construction rail infrastructure and road infrastructure are proposed. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | Yes | Rail connectivity from IB station has been proposed.
DPR is being prepared by M/s RITES Ltd ( Govt. of India Enterprise) | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | | 1.20 | New or diverted transmission lines or pipelines? | No | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | | 1.22 | Stream crossings? | No | | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | During Mining operation de-watering is inevitable. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Required for Mining and allied activities. | 1.26 | Long-term dismantling or decommissioning or restoration works? | Yes | Reclamation after Excavation. | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | People will be deployed for Mining operation and allied activities. | 1.29 | Introduction of alien species? | No | | 1.30 | Loss of native species or genetic diversity? | No | | 1.31 | Any other actions? | Yes | CHP will be constructed for transportation of Coal | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Part agricultural land and part undeveloped Land. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | 4460 KLD.
Source-Bore well and Mine water. | 2.3 | Minerals (MT) | Yes | Normative- 20 MTPA,
Peak-23 MTPA | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Aggregates and Sand will be decided during DPR of Civil Construction.
Source- Near by Market. | 2.5 | Forests and timber (source – MT) | No | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Connected Load- 26145 KW
Max Demand- 12301 KW | 2.7 | Any other natural resources (use appropriate standard units) | No | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The project will bring employment opportunities and prosperity in the area.
Through CSR, NLCIL will spend for welfare activities. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | Yes | Overburden -603.77 Mcum | 4.2 | Municipal waste (domestic and or commercial wastes) | No | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | | 4.4 | Other industrial process wastes | No | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | will be treated and disposed. | 4.7 | Construction or demolition wastes | No | | 4.8 | Redundant machinery or equipment | No | | 4.9 | Contaminated soils or other materials | No | | 4.10 | Agricultural wastes | No | | 4.11 | Other solid wastes | No | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Diesel operated HEMM shall be used for Mining of Coal. | 5.2 | Emissions from production processes | Yes | Noxious gases and dust will be released during Blasting operation. | 5.3 | Emissions from materials handling including storage or transport | No | | 5.4 | Emissions from construction activities including plant and equipment | No | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | will be dealt appropriately . | 5.6 | Emissions from incineration of waste | No | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | | 5.8 | Emissions from any other sources | No | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Operation of HEMM and CHP will generate vibration and heat. | 6.2 | From industrial or similar processes | No | | 6.3 | From construction or demolition | No | | 6.4 | From blasting or piling | Yes | Noise and Vibration during Blasting. | 6.5 | From construction or operational traffic | No | | 6.6 | From lighting or cooling systems | Yes | From industrial Lighting. | 6.7 | From any other sources | No | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | Water shall be discharged after due treatment. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | | 7.4 | From any other sources | No | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | to mitigate the risk only trained and authorized persons shall be assigned to handle explosives. | 8.2 | From any other causes | Yes | To mitigate the risk , safety Management plan will be prepared and will be implemented after due approval from DGMS. | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | R&R colony with Modern amenities for 2880 PAF's has been proposed .
Approach Road will be developed .
Township, School and hospital will be developed. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | Yes | Afforestation & Reclamation of mine out area shall be done as per approved Mine Closure Plan.
It will have positive impact on the environment after closure of the Mine. | 9.3 | Set a precedent for later developments | No | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | | 4 | Inland, coastal, marine or underground waters | No | | 5 | State, National boundaries | No | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | | 7 | Defence installations | No | | 8 | Densely populated or built-up area | No | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | School-13 Nos
Temple-18 Nos
Anganwadi- 10 No
GP-3 Nos. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | ANBU | Designation | GENERAL MANAGER/BARSINGSAR MIN | Name of Company (Applicant Name should not be given here) | NEYVELI LIGNITE CORPORATION LIMITED | Address | "NEYVELI HOUSE",