(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Talabira II and III OCP
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/OR/CMIN/75826/2018
Project Cost 240100 lacs
2.
S. No. in the schedule1(a) Mining of minerals
Project Sector Coal Mining
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Normative 20 MTPA, Peak 23 MTPA ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 1914 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectKhinda Talabira Patrapali Malda and Rampur villages in Sambalpur and Jharsuguda district
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.430,431,432,433,434,435,436,437,438,439,440,441,444,445,446,447,448,449,450,451,452,453,454,455,456,457,458,459,460,461,462,463,464,677,679,680,681,682,688,694,695,696,697,698,704,705,706,707, 711,712,713,714,715,719,720,722,723,724,725,726,727,732,733,734,738,739,740,741,742,743,744,745,746,747,443/753,460/789,702/792,463/794,434/796,433/797,443/798,435/799,722/827,702/829,678/984,678/985,433/995,434/996 11,12,13,14,15,16,17,18,19,20,21,22,24,28,39,41,45,46,47,52,53,55,58,59,60,65,66,68,69,70,72,73,74, 81,84,86,87,88,89,90,94,97,98,99,100,101,102,103,105,106,108,109,110,112,113,114,117,118,119,124,125,126,127,128,129,130,131,133,134,135,137,138,139,141,142,143,146,148,149,150,151,152,153,154,155,156,157,158,159,160,161,162,164,165,166,167,168,170,171,172,173,174,175,176,177,178,179,180,181,182,183184,185,186,187,188,189,190,191,192,193,194,195,196,197,198,199,200,201,202,203,204,205,206,207,208,209,210,211,212,214,215,216,217,218,219,220,222,223,224,225,227,229,230,231,232,235,236,23
Town / VillageKhinda,Talabira,Patrapali,Malda,Rampur
State of the projectOrissa
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)OrissaSambalpurRengali
(2.)OrissaJharsugudaJharsuguda
10.
Nearest railway station along with distance in kms lapanga, 14 km
Nearest airport along with distance in kms jharsuguda, 24 km
11. Nearest Town/City/District Headquarters along with distance in kms jharsuguda , 18 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Since Forest proposal is not getting uploaded so approval under the FC act mentioned as 'No' , may please be considered. Panchayat- Khinda, Patrapali, Malda
13. Name of the Applicant ANBU
14. Registered Address "NEYVELI HOUSE", 135,PERIYAR EVR HIGH ROAD, KILPAUK, CHENNAI
15.
Address for correspondance:
Name of the Company NEYVELI LIGNITE CORPORATION LIMITED
Name of the Applicant ANBU
Designation (Owner/ Partner/ CEO) GENERAL MANAGER/BARSINGSAR MIN
Pin code 607803
E-mail gm.mineplanning@nlcindia.in
Telephone No. 4142-228413
Fax No. 4142-4142228413
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?Yes
Area of Forest land Involved (hectares)1038.187 ha.
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Excavation in 972.530 Ha Infrastructure-271.960 Ha Embankment -35.190 ha External dump-171.63 Ha
1.2 Clearance of existing land, vegetation and buildings? Yes Mine excavation in 673.210 Ha
1.3 Creation of new land uses? Yes Mining purpose
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes carried out for EIA report.
1.5 Construction works? Yes Infrastructure-271.960 Ha
1.6 Demolition works? Yes Demolition of houses etc will be started after handing over Land.
1.7 Temporary sites used for construction works or housing of construction workers? No
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Excavation within 972.530 Ha
1.9 Underground works including mining or tunnelling? No
1.10 Reclamation works? Yes concurrent reclamation will be done as per Mine Closure Plan.
1.11 Dredging? No
1.12 Offshore structures? No
1.13 Production and manufacturing processes? No
1.14 Facilities for storage of goods or materials? Yes Facilities for Storage of Explosive , diesel ,lubricants and other store items shall be developed.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Facilities for treatment or disposal of solid waste or liquid effluents will be developed.
1.16 Facilities for long term housing of operational workers? Yes housing for long term operational workers will be developed.
1.17 New road, rail or sea traffic during construction or operation? Yes During construction rail infrastructure and road infrastructure are proposed.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? Yes Rail connectivity from IB station has been proposed. DPR is being prepared by M/s RITES Ltd ( Govt. of India Enterprise)
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No
1.20 New or diverted transmission lines or pipelines? No
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No
1.22 Stream crossings? No
1.23 Abstraction or transfers of water from ground or surface waters? Yes During Mining operation de-watering is inevitable.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Required for Mining and allied activities.
1.26 Long-term dismantling or decommissioning or restoration works? Yes Reclamation after Excavation.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No
1.28 Influx of people to an area in either temporarily or permanently? Yes People will be deployed for Mining operation and allied activities.
1.29 Introduction of alien species? No
1.30 Loss of native species or genetic diversity? No
1.31 Any other actions? Yes CHP will be constructed for transportation of Coal
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Part agricultural land and part undeveloped Land.
2.2 Water (expected source & competing users) unit: KLD Yes 4460 KLD. Source-Bore well and Mine water.
2.3 Minerals (MT) Yes Normative- 20 MTPA, Peak-23 MTPA
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Aggregates and Sand will be decided during DPR of Civil Construction. Source- Near by Market.
2.5 Forests and timber (source – MT) No
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Connected Load- 26145 KW Max Demand- 12301 KW
2.7 Any other natural resources (use appropriate standard units) No
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The project will bring employment opportunities and prosperity in the area. Through CSR, NLCIL will spend for welfare activities.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No
3.5 Any other causes No
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes Yes Overburden -603.77 Mcum
4.2 Municipal waste (domestic and or commercial wastes) No
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No
4.4 Other industrial process wastes No
4.5 Surplus product No
4.6 Sewage sludge or other sludge from effluent treatment Yes will be treated and disposed.
4.7 Construction or demolition wastes No
4.8 Redundant machinery or equipment No
4.9 Contaminated soils or other materials No
4.10 Agricultural wastes No
4.11 Other solid wastes No
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Diesel operated HEMM shall be used for Mining of Coal.
5.2 Emissions from production processes Yes Noxious gases and dust will be released during Blasting operation.
5.3 Emissions from materials handling including storage or transport No
5.4 Emissions from construction activities including plant and equipment No
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes will be dealt appropriately .
5.6 Emissions from incineration of waste No
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No
5.8 Emissions from any other sources No
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Operation of HEMM and CHP will generate vibration and heat.
6.2 From industrial or similar processes No
6.3 From construction or demolition No
6.4 From blasting or piling Yes Noise and Vibration during Blasting.
6.5 From construction or operational traffic No
6.6 From lighting or cooling systems Yes From industrial Lighting.
6.7 From any other sources No
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Water shall be discharged after due treatment.
7.3 By deposition of pollutants emitted to air into the land or into water No
7.4 From any other sources No
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes to mitigate the risk only trained and authorized persons shall be assigned to handle explosives.
8.2 From any other causes Yes To mitigate the risk , safety Management plan will be prepared and will be implemented after due approval from DGMS.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes R&R colony with Modern amenities for 2880 PAF's has been proposed . Approach Road will be developed . Township, School and hospital will be developed.
9.2 Lead to after-use of the site, which could have an impact on the environment Yes Afforestation & Reclamation of mine out area shall be done as per approved Mine Closure Plan. It will have positive impact on the environment after closure of the Mine.
9.3 Set a precedent for later developments No
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No
4 Inland, coastal, marine or underground waters No
5 State, National boundaries No
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No
7 Defence installations No
8 Densely populated or built-up area No
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes School-13 Nos Temple-18 Nos Anganwadi- 10 No GP-3 Nos.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
5Uploaded Approval of mining PlanN/A
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantANBU
DesignationGENERAL MANAGER/BARSINGSAR MIN
Name of Company (Applicant Name should not be given here)NEYVELI LIGNITE CORPORATION LIMITED
Address"NEYVELI HOUSE", 135,PERIYAR EVR HIGH ROAD, KILPAUK, CHENNAI