APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | No |
| | Whether proposal involved violation of EIA notification | No | tr > | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Proposed Dhirauli Coal Block of production capacity of 6.5 MTPA (5 MTPA Open Cast & 1.5 MTPA Underground) located at Singrauli Coal Fields, Singrauli District, Madhya Pradesh | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/MP/CMIN/214743/2021 | Project Cost | 2800 cr | |
| 2. | |
S. No. in the schedule | 1(a) Mining of minerals
| Project Sector | Coal Mining | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Proposed Production Capacities: 5 MTPA (Opencast) , 1.5 MTPA (Underground) Mine Lease Area: 2672 ha (Forest land: 1436.19 ha & Non-Forest land – 1235.81 ha). ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 0 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Tehsil Sarai, District Singrauli, Madhya Pradesh | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | 337,353,354,356,357,360,361 | Town / Village | Dhirauli, Phatpani, Sirswah, Amdand, Jhalari, Amraikhoh, Bansibridha, and Belwar | State of the project | Madhya Pradesh | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Madhya Pradesh | Singrouli | Sarai | | 10. | |
Nearest railway station along with distance in kms | Sarai-Gram, 18 km | Nearest airport along with distance in kms | Varanasi, 250 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Waidhan , 50 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Dhirauli, Phatpani, Sirswah, Amdand, Jhalari, Amraikhoh, Bansibridha, and Belwar | | 13. | Name of the Applicant | Bacha | | 14. | Registered Address | Adani Corporate House, Shantigram, S.G. Highway, Ahmedabad- 382421 | | 15. | |
Address for correspondance: | Name of the Company | STRATATECH MINERAL RESOURCES PRIVATE LIMITED | Name of the Applicant | Bacha | Designation (Owner/ Partner/ CEO) | Head Singrauli Cluster | Pin code | 382421 | E-mail | dhirauli@adani.com | Telephone No. | 0- | Fax No. | 0- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | Yes | Status | Forest Clearance Under Process(Stage-I) | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | | 23. | Whether any Forest Land Involved? | Yes | Area of Forest land Involved (hectares) | 1436.19 ha. | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | Dhirauli Mine Lease area consists of forest and non-forest land. The remaining area is fallow land, cultivable land, and non-cultivable land. The existing terrestrial configuration will undergo progressive changes due to proposed opencast mine and underground mine development, coal extraction, creation of haul roads, dumps, reclamation, and rehabilitation during mining process. | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Opencast and underground working will result in loss of homesteads/buildings that may come into use in quarrying zone, safety zone and infrastructure areas including loss of vegetation. Dhirauli, Phatpani, Sirswah, Amdand, Jhalari, Amraikhoh, Bansibridha, and Belwar villages are lying within the block has been identified to be rehabilitated and resettled. The displaced families are proposed to be rehabilitated and resettled colony in a nearby area after discussion with villagers. | 1.3 | Creation of new land uses? | Yes | Present land use will undergo gradual changes during mine life due to mine development, coal extraction, storage, loading/ unloading, transportation and rehabilitation. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | CMPDI and other agencies have drilled a number of boreholes within the block during the course of geological exploration. All relevant geological information for these boreholes along with number of boreholes falling within a distance of 200 m from the block boundary have been considered for geological modelling of the Dhirauli block. | 1.5 | Construction works? | Yes | Mine office building, rest house, canteen, Service / Welfare, Workshops, Coal handling Plant, Store, Substation, Roads, Culverts, magazine and other associated ancillary facilities etc in the Mining lease area. | 1.6 | Demolition works? | Yes | Village houses, tube wells and open wells and other buildings falling in the quarry zone will be demolished and suitably rehabilitated in accordance with R&R plan. | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | Temporary sheds will be provided to meet enabling needs of construction, manpower & machinery deployed, which will be removed at later stage. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Surface infrastructures like mine office & stores, coal handling plant, canteen, dispensary, rest shelters, substation, ETP, STP .explosives magazine storage etc. | 1.9 | Underground works including mining or tunnelling? | Yes | The proposed project is open cast and under-ground coal mining. | 1.10 | Reclamation works? | Yes | Top soil will be excavated and dump separately. The entire topsoil will be reclaimed and spread over the external OB dump and over backfilled internal dump area for land reclamation in phases. | 1.11 | Dredging? | No | Not applicable. | 1.12 | Offshore structures? | No | Not applicable. | 1.13 | Production and manufacturing processes? | Yes | Mining will be carried out by opencast and underground mining of peak rated of 6.5 MTPA (OC-5 MTPA, UG-1.5 MTPA).
Surface miner has been planned for improving the coal quality by selective band removal from Seams, deployment of surface miner for coal has been envisaged along with 30 T dump trucks. Also underground mining will be carried out through a continuous miner. | 1.14 | Facilities for storage of goods or materials? | Yes | A store will be set up for starting the opencast / underground mining operations and during the construction stage of the mining. Diesel pump facility will be installed for the fuel requirement of HEMM. Magazine for explosives with adequate safety equipment as per norms. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | The total volume of OB has been estimated as 1963.55 Mcum. The OB removed during initial years will be placed beyond the incrop of the seam VII as external dump. The total volume of external dump has been estimated as 259.01 Mm3. Rest of the OB will be placed as internal
dumps. The total volume of internal OB, i.e. the volume which will be accommodated internally by backfilling has been estimated as 1704.54 Mm3. | 1.16 | Facilities for long term housing of operational workers? | Yes | Community buildings, offices, workshop & stores, sub-stations, magazine & other statutory buildings will be constructed. | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | Existing road network is adequate for transportation. If required Haul roads will be constructed within the ML area as well as approach roads to project will be developed. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | Yes | Existing road network is adequate for transportation. If required Haul roads will be constructed within the ML area as well as approach roads to project will be developed. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | Yes | Village roads within the ML area will be suitably diverted after detailed survey in consulting with approved mine planners. No displacement of people due to diversion of fair-weather road is envisaged. | 1.20 | New or diverted transmission lines or pipelines? | Yes | Total 5 transmission line (132kv- one line to 765 kv – 4 lines) is passing from the block which is proposed to divert from outside of Dhirauli coal block. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Hurdul nala and its tributaries flowing from almost East to West in the Central Part. A few small nalas are also flowing in the northern and southern side of block. | 1.22 | Stream crossings? | Yes | As some of the quarry falls in the HFL of Hurdul Nala, it is proposed to construct the flood protection embankments. | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Mine water is generated from two sources (a) Ground water: as the quarry goes deeper, more and more aquifers are intercepted and volume of water increases, (b) Rain water Harvesting: direct precipitation over the excavated area and surface run-off flowing into the mine during rains. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | Yes | All precautions to be taken for inundation from surface water flow. As some of the quarry falls in the HFL of Hurdul Nala, it is proposed to construct the flood protection embankments.
Garland drains around the proposed quarry boundaries will be provided and periodically maintained for adequate safety measure. Proper drainage system will be provided in the haul roads. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Existing road network is adequate for transportation. If required Haul roads will be constructed within the ML area as well as approach roads to project will be developed. | 1.26 | Long-term dismantling or decommissioning or restoration works? | Yes | Mine will be systematically closed and restored as per approved mine closure plan. | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not envisaged. | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | During the construction phase skilled/semi-skilled personnel will be sourced as per requirement from outside if not available locally. | 1.29 | Introduction of alien species? | No | Not envisaged. | 1.30 | Loss of native species or genetic diversity? | Yes | In-situ conservatory for rare strains of plants and endangered flora, medicinal plants existing in the study area will be established. However, efforts will be made to cover more area for the activities depending upon availability of land in the forest area. Native plant species will be selected in consultation with the State Forest Department. | 1.31 | Any other actions? | No | Not envisaged. | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | For the proposed Dhirauli Coal Block Project, the total requirement of land is estimated as 2,672 Ha, which includes 1436.19 ha of forest land and 1235.81 ha of non-forest land . | 2.2 | Water (expected source & competing users) unit: KLD | Yes | The total water required for the project is estimated as 1540 KLD of potable water and 85.56 m3/hr of industrial water.
An integrated water supply system (IWSS) has been proposed from which water shall be stored in bulk reservoir at a point in the project.
Source: ground water | 2.3 | Minerals (MT) | Yes | The peak production of coal mine is aimed at 6.5 MTPA (OC-5.0 MTPA, UG-1.5 MTPA). | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction material such as cement, sand, steel, aggregates etc will be used. These materials will be sourced from the nearest local suppliers in the area. | 2.5 | Forests and timber (source – MT) | No | Not envisaged. | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | The existing capacity of the nearby 132 / 33 KV sub-station at Dongri village is proposed to be augmented to meet the power requirement of Dhirauli Coal (Opencast and Underground project). The estimated connected load and maximum demand of the project for the targeted production of 6.5 MTPA comes to the tune of approx. 5346 KVA. | 2.7 | Any other natural resources (use appropriate standard units) | No | Not envisaged. | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Explosive for the proposed coal mine and production activities will be stored in magazine. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not reported in the study area. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The project will generate direct and indirect employment to the people and will improve the living standards. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Nil | 3.5 | Any other causes | No | Nil | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | Yes | The total internal dump quantity within the pit at final stage of mining operation has been estimated as per approved mine plan. The external dump quantity remains the same as for as the entire OB mined under 'Future Extension Pit' shall be dumped internally. The total volume of OB has been estimated as 1963.55 Mcum. | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | The organic waste/municipal waste to be generated from the office buildings, canteen & sludge from the sanitary wastewater treatment will be used as organic manure in the green areas. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used engine oil, oil filters, batteries and grease will be sold to authorized recyclers. The hazardous waste generated shall be disposed as per Hazardous Waste Management Rules. | 4.4 | Other industrial process wastes | No | No other industrial wastes are envisaged to be produced. | 4.5 | Surplus product | No | Not envisaged. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sludge produced in sewage treatment plant will be used as manure in agriculture/ greenbelt. | 4.7 | Construction or demolition wastes | Yes | Construction waste material will be used for filling low lying areas in the surrounding. | 4.8 | Redundant machinery or equipment | Yes | Only at mine closure stage. | 4.9 | Contaminated soils or other materials | No | Not envisaged. | 4.10 | Agricultural wastes | No | Not envisaged. | 4.11 | Other solid wastes | No | Not envisaged. | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Besides dust generation, fugitive and emissions due to operation of diesel driven HEMM, standby DG Sets etc. | 5.2 | Emissions from production processes | Yes | Mining process involves drilling, blasting, excavation, crushing materials handling, transportation and storage, due to which fugitive emission, particulates and gaseous emissions will be generated. Adequate control measures will be adopted for their control. | 5.3 | Emissions from materials handling including storage or transport | Yes | Dust & gaseous emissions are envisaged during loading and unloading, storage and transportation of coal and waste materials handling. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Dust & gaseous emissions are expected during the construction phase and mine development phase. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust will be generated during handling of material & waste. Adequate mitigation measures will be taken to keep within permissible limits. | 5.6 | Emissions from incineration of waste | No | No incineration is envisaged. | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable. | 5.8 | Emissions from any other sources | No | Not applicable. | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise will be generated from shovels, dumpers, drills, dozers and blasting activities. The noise level inside operator cabins will be maintained below 75 dB (A) to 85 dB (A). Adequate noise control equipment’s like mufflers, acoustic enclosures to equipment’s etc. will be installed.
Regular maintenance of the mining machinery will help in reducing these noise levels. | 6.2 | From industrial or similar processes | Yes | The noise levels during blasting operations are likely to be in the range of 120-130 dB(A) at 50-200 m distance from the blast site. The noise levels tend to decrease with distance towards mine boundary. As the blasting is last for short duration depending on the charge, the noise levels over this time would be instantaneous and short induration. | 6.3 | From construction or demolition | Yes | During construction and decommissioning phases, there will be temporary noise generation. | 6.4 | From blasting or piling | Yes | Noise will be generated during blasting operations, which will be restricted and controlled by scientific methods. Precautions will be taken to minimize the noise and vibration during blasting. | 6.5 | From construction or operational traffic | Yes | During operation, noise will be generated due to movement of dumpers, HEMM and other vehicles used during mine operation. HEMM & dumpers would be maintained properly to keep noise levels within limits. Use of horns near human habitat and other sensitive receptors shall be restricted. Movement of mining equipment’s near the habitation will be restricted to the day time. | 6.6 | From lighting or cooling systems | No | Not envisaged. | 6.7 | From any other sources | No | Not envisaged. | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Isolated storage and handling facilities for diesel will be provided. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | Treated domestic wastewater will be used for greenbelt development; Treated mine discharge will be recycled / reused for mining operations and water sprinkling. No contamination of ground water, surface water and land is envisaged. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Fugitive dust will be generated, for which regular water sprinkling & wet drilling system will be adopted as preventive measures to control dust. | 7.4 | From any other sources | No | Not envisaged. | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not envisaged. | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Explosive magazine will be constructed as per explosive rules 1983 and the same will be utilized as per Explosive Act 1884. Blasting will be carried out by experienced foremen and blasters under the supervision of mines manager. Fire hazard may be due to storage of diesel and due to spontaneous coal fires. | 8.2 | From any other causes | No | Not envisaged. | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | There is no record of occurrence of flood, landslides, cloudbursts etc. The proposed site falls under Seismic Zone-III as per IS 1893 (part-I): 2002. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | The project aids the overall socio and economic development of the region. Direct and indirect employment avenues will be created due to project, which would improve the living conditions of the surrounding people and also through various socio-economic measures taken. All these will have positive impact over the area. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Mine will be systematically and scientifically planned foreclosure as per Mine Closure plan.
Massive afforestation planned will improve the green cover. No major impacts are envisaged. | 9.3 | Set a precedent for later developments | Yes | At the end of the mine life, the infrastructure like housing colony, building, roads etc. developed for the project will be made available for the benefit of local community. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | Not envisaged. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Sanjay Tiger Reserve (10.21 KM , W) | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | RF/PF - Mohan ban RF (within the MLarea), Langhadol PF (10.5 km, SW), Hatta PF (10.7 km, W), Sarai PF (10.8 km, NW), Runda Bhadora RF (11.2 km, W), Pidarwah PF (11.5 km, NNE), Kasaiya PF (12.5 km, NNW), Daser PF (13.9 km, S), Shivgarh PF (14.5 km, NW)
Water bodies -Hurdul Nala within ML area, Jhana nala within ML area, Gopad River (10.2 km, W), Sulkhia Nala (5.3 km, W), Chuniya Nala (13.0 km, WNW), Sukar Nala (6.7 km, NNW),Mahan Nala (1.7 km, N), Hariya Nala (9.9 km, NNW) etc. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Nil within 15 km radius. | 4 | Inland, coastal, marine or underground waters | No | Nil within 15 km | 5 | State, National boundaries | No | Nil within 15 km. | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | NH-39 (22.0 km, NE) | 7 | Defence installations | No | Nil within 15 km. | 8 | Densely populated or built-up area | Yes | Waidhan (50.0 km, SW) | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Primary, middle and High schools exists in surrounding villages. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Nil within 15 km. | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not applicable. | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | The area not known for these natural hazards. Seismically, this area is categorized under Zone-III as per IS 1893 (part-I): 2002. | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Bacha | Designation | Head Singrauli Cluster | Name of Company (Applicant Name should not be given here) | STRATATECH MINERAL RESOURCES PRIVATE LIMITED | Address | Adani Corporate House, Shantigram, S.G. Highway, Ahmedabad- 382421 |
| |
|