S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of Integrated Cement Plant - Clinker (4.8 to 8.3 MTPA), Cement (4.85 to 8.35 MTPA) along with installation of WHRS (36 MW) at Village: Amli, Tehsil: Pindwara, District: Sirohi (Rajasthan) by M/s. UltraTech Nathdwara Cement Limited
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/RJ/IND/107599/2019
Project Cost 125000 lacs
2.
S. No. in the schedule3(b) Cement plants
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Proposed Capacities after expansion - Clinker (8.3 MTPA), Cement (8.35 MTPA), WHRS (36 MW) and Captive Power Plant (70 MW) and Total Plant Area: 230 ha; Proposed expansion will be done within the existing plant area. ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/RJ/IND/18968/2013
MoEFCC file number(Previous EC)J-11011/59/2010-IA-II (I)
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 230 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectVillage: Amli, Tehsil: Pindwara, District: Sirohi (Rajasthan)
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Khasra no. 59, 64, 70- 72, 76-77, 79-80, 660, 662. Khasra Map has been enclosed as Annexure - 2 with Pre-Feasibility Report.
Town / VillageNearest Town - Pindwara (~5.0 km in SW direction)
State of the projectRajasthan
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)RajasthanSirohiPindwara
10.
Nearest railway station along with distance in kms Sirohi Road Railway Station, ~5.5 km in WSW Direction km
Nearest airport along with distance in kms Maharana Pratap Airport, Udaipur, ~83 km in ESE direction km
11. Nearest Town/City/District Headquarters along with distance in kms Nearest Town - Pindwara , ~5.0 km in SW direction km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Village Panchayat: Amli, Zila Parishad: Sirohi, Municipal Corporation: Pindwara Postal Address: M/s. UltraTech Nathdwara Cement Limited At Village- Amli , District- Sirohi , State-Rajasthan, Pin - 307031, Phone No. 02971-235005 to 235012, Fax No. -
13. Name of the Applicant Govindaranjan
14. Registered Address B wing, Ahura Centre, 2nd floor, Mahakali caves road
15.
Address for correspondance:
Name of the Company ULTRATECH NATHDWARA CEMENT LTD.
Name of the Applicant Govindaranjan
Designation (Owner/ Partner/ CEO) unithead
Pin code 307031
E-mail utcl-ndcw.env@adityabirla.com
Telephone No. 02971-235005
Fax No. 02971-235020
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? Yes
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Total plant area is 230 ha. Land use of the existing land is already industrial; and since, the proposed expansion will be done within the existing plant premises; therefore, there will be no change in land use, only intensity will increase due to proposed expansion project. Topography of the land is almost flat; there will be no change in the topography.
1.2 Clearance of existing land, vegetation and buildings? No Since; the proposed expansion project will be done within the existing plant premises; therefore, no such clearance of the existing land, vegetation & building will be required.
1.3 Creation of new land uses? No Land use of the existing area is industrial; since, the proposed expansion will be done within the existing plant premises, hence, there will not be any creation of new land uses.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Pre-construction investigations have already been carried out. Thus, it is not required for proposed expansion project.
1.5 Construction works? Yes Construction will be done for installation of various units, storage facilities in new line.
1.6 Demolition works? No No demolition is required.
1.7 Temporary sites used for construction works or housing of construction workers? Yes Local people will be employed for the construction purpose; no housing facilities will be required for them. However, all required amenities / facilities will be provided for construction workers at site such as rest shelters, portable toilet, facilities for drinking water etc.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes There will be excavation, cut and fill during the process of construction / erection for new line
1.9 Underground works including mining or tunnelling? No No underground works including mining or tunneling is required.
1.10 Reclamation works? No No reclamation work is required.
1.11 Dredging? No No dredging is involved.
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? Yes Cement Plant - Cement manufacturing process is based on dry process involving: Transport of limestone from crusher, Raw Mix Preparation & Homogenization, Preheating, Calcination and Clinkerization, Storage and transport and Cement Grinding, Storage, Packing & Dispatch. WHRS - WHRB has been proposed to use waste heat from Pre-heater and Kiln.
1.14 Facilities for storage of goods or materials? Yes Adequate storage facilities have been / will be provided within the plant premises separately for raw materials and finished product.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes - Dust collected from various APCEs recycled in process. - STP Sludge utilized as manure for greenbelt development / plantation. - Water used for cooling at various stages of Cement plant is being/will be partially subjected to evaporation & partially recycled; hence, no waste water is being/ will be discharged from process. - Domestic waste water from plant & colony treated in existing STP & treated water utilized for greenbelt development & dust suppression.
1.16 Facilities for long term housing of operational workers? Yes In the cement plant, well established residential colony has been developed along with all the required social amenities for the Staff and Workers. Temporary workers will be sourced from nearby villages during the construction phase; therefore, no long term housing will be required.
1.17 New road, rail or sea traffic during construction or operation? Yes Transportation of raw materials and finished product during operation phase will be done by road & rail networks; therefore, traffic density during Operation phase will increase to some extent due to onset of heavy duty vehicles. During construction phase, local materials will be used as far as practicable.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No The transportation of raw materials and finished product during operation phase will be done via existing conveyer belt, road & rail networks.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No There will be no closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements due to proposed expansion project.
1.20 New or diverted transmission lines or pipelines? No No new or diverted transmission lines or pipelines will be there.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No There will be no impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers.
1.22 Stream crossings? No No stream crossing is there.
1.23 Abstraction or transfers of water from ground or surface waters? Yes UTNCL has obtained permission from CGWA for withdrawal of 4960 KLD of Ground Water. Additional water requirement for proposed expansion project will be 1050 KLD; which will be sourced from Ground Water.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No There will be no change in water bodies or the land surface affecting drainage or run- off.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Local people will be preferred in employment during Construction & Operation phase. In-house facilities are available for accommodating the technical persons coming from distant places for construction purpose and long-term housing facility is being / will be provided to both skilled and unskilled workers. Transportation of materials is being / will be done by covered conveyer belt, road & railway.
1.26 Long-term dismantling or decommissioning or restoration works? No No long-term dismantling or decommissioning or restoration works is required.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Existing manpower requirement for the plant is 1851 persons and additional manpower requirement for proposed expansion will be 200 persons. Thus, the total manpower requirement after proposed expansion will be 2051 persons. Local people will be preferred in employment as per their eligibility. Hence, the project may not contribute significantly in the population influx & only marginal population influx is envisaged.
1.29 Introduction of alien species? No Introduction of alien species is not envisaged. The native plant species have been / will be planted and selected in consultation with the Local Forest Department and local people.
1.30 Loss of native species or genetic diversity? No No such case is reported from the area so far.
1.31 Any other actions? No Not applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No No additional land will be required for the proposed expansion; as the same will be done within the existing plant premises.
2.2 Water (expected source & competing users) unit: KLD Yes UTNCL has obtained permission from CGWA for withdrawal of 4960 KLD of Ground Water. Additional water requirement for proposed expansion project will be 1050 KLD; which will be sourced from Ground Water.
2.3 Minerals (MT) Yes Limestone, Red Ochre/Iron ore and Gypsum will be utilized for the proposed expansion project.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction material as available locally such as sand, reinforcement steel, structural steel, cement, metal etc. will be used. The quantification of the materials will be done during detailed engineering stage.
2.5 Forests and timber (source – MT) No No forests and timber are required.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Additional power requirement for proposed expansion project will be 35 KLD; which will be sourced from CPP, RSEB Grid and WHRS. Fuel Quantity is estimated considering 100% utilization of individual fuels, however depending on the availability and viability a mix of fuel will be used. Additional fuel requirement for expansion project: o Indian / Imported Coal / Lignite - 0.438 MTPA o Petcoke (Indian / Imported) - 0.35 MTPA
2.7 Any other natural resources (use appropriate standard units) No Not applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No No such substances or materials will be used, which are hazardous to human health or the environment.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not envisaged.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes There will be positive impact of the project in the area as mentioned below: • Employment opportunities, both direct and indirect will generate, thus improving the economic status of the villagers. • Transport & Education facilities will be improved. • Community Health care programmes provide better health and medical facilities not only to the employees but also to the villagers. • Other activities for improvement of social welfare through CSR / CER are being and will be done.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No No effect envisaged.
3.5 Any other causes No Not applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No major spoil production is envisaged from the plant as there will be no demolition work. However, the spoil generated during construction will be reused for levelling.
4.2 Municipal waste (domestic and or commercial wastes) Yes Municipal solid waste generated from Plant & colony is being / will be collected, segregated and disposed off scientifically.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used or Spent oil (Cat 5.1), Contaminated cotton rags or other cleaning materials (Cat 33.2) and Empty barrels/containers/liners contaminated with hazardous chemicals /wastes is being / will be generated as per Schedule I of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016.
4.4 Other industrial process wastes Yes Dust collected from various air pollution control equipment is being / will be recycled into the process.
4.5 Surplus product Yes Part of Clinker will be dispatch to other Grinding Units of UltraTech.
4.6 Sewage sludge or other sludge from effluent treatment Yes Sludge generated from STP is being / will be utilized as manure for greenbelt development / plantation.
4.7 Construction or demolition wastes Yes Construction waste like soil, brick bits, etc. will be utilized in leveling of land and road making. No demolition waste will be generated.
4.8 Redundant machinery or equipment Yes Occasionally, scraps as and when generated segregated, stored & sold to vendors.
4.9 Contaminated soils or other materials No There will not be any contaminated soils or other materials.
4.10 Agricultural wastes No There will not be any agricultural wastes.
4.11 Other solid wastes Yes Used Lead acid batteries is being / will be generated which is being / will be stored in the designated storage area and is being / will be disposed off / sold to registered vendors as per prevalent rules.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Emission from combustion of fossil fuels from stationary or mobile sources is being / will be maintained within the prescribed environmental regulatory standards.
5.2 Emissions from production processes Yes Particulate and gaseous emissions from cement plant operations are envisaged. ESP, Bag House, Bag Filters has been / will be installed to control emissions from the plant within prescribed limits. Adequate stack height has been / will be provided as per CPCB norms for proper dispersion of particulate matter and gaseous emissions. CEMS have been/will be provided to monitor the emissions and corrective measures is /will be taken in case of any exigencies.
5.3 Emissions from materials handling including storage or transport Yes In the cement plant, due to the transportation activity and vehicular movements, fugitive emissions is being / will be generated. Bag Filters have been / will be installed at all material transfer points. Covered storage facilities have been / will be provided for raw material & finished products.
5.4 Emissions from construction activities including plant and equipment Yes Fugitive dust emissions are likely to be generated from construction activities and vehicular movements. These emissions will be temporary and will be controlled by water spraying and regular sweeping of internal roads.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes During construction, there will be minor generation of dust which will be controlled by water spraying. No odour from handling of materials including construction materials, sewage and waste will be generated.
5.6 Emissions from incineration of waste No There will be no incineration of waste.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No There will be no burning of waste in open air.
5.8 Emissions from any other sources No There will be no emissions from any other sources.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes In the cement plant, noise will emanate from operation of equipment; which is / will be kept below the prescribed limit by CPCB. Noise abatement measures are being / will be taken and persons working just close to machines and machine operators are being / will be provided with Personal Protective Equipment viz. Ear plugs/Ear defenders etc. for further protection.
6.2 From industrial or similar processes Yes Noise is / will be generated due to running of machinery. Proper mitigation measures are being / will be taken for the reduction of noise levels viz. acoustic enclosures etc. The workers are being / will be provided with personal protective equipments.
6.3 From construction or demolition Yes Noise generated from construction activities is / will be maintained within the prescribed noise standards. No demolition activity will be done.
6.4 From blasting or piling Yes There will be no blasting. Slight noise during piling activities is / will be addressed by providing PPEs.
6.5 From construction or operational traffic Yes Noise will emanate due to movement of HEMM / vehicle but the same is being / will be maintained within the prescribed limit. Noise during construction activities will be temporary & will be resolved.
6.6 From lighting or cooling systems No No noise will be generated from lighting or cooling systems
6.7 From any other sources No Not applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Used oil for lubrication is being / will be handled in closed containers and stored at designated areas. Used oil and contaminated rags is being / will be sold to CPCB authorized recycler.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No No effluent is being / will be generated during the process. Only domestic wastewater will be generated from colony & plant which is being/ will be treated in existing STP. Treated water from STP will be utilized in greenbelt development and dust suppression.
7.3 By deposition of pollutants emitted to air into the land or into water Yes There is likelihood of increase of air emissions. Proper mitigating measures are being / will be adopted to reduce the effect. However, periodical monitoring and continuous online Emission monitoring is being / will be done and results are being / will be analyzed. In case of any exigencies, corrective measures are / will be taken.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No There will be no long-term buildup of pollutants in the environment, however periodic monitoring will be done for the air, water, noise and soil, so that timely mitigation measures can be undertaken.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Possibility of accidents on account of explosions, spillages, fires etc. and from storage, handling, use or production of hazardous substances etc. is very less. Proper maintenance, operation and leakage proof condition of machineries is / will eliminate the possibilities of fire. Fire extinguishers have been / will be installed near all machineries & Fuels (Coal & Petcoke) storage yards along with other preventive measures.
8.2 From any other causes No Not applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No No such case has been reported in the area and chances are minimal. However, company is having Emergency and Contingency plans in place.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Proposed expansion project will result in considerable growth of the surrounding areas. Some of the direct & indirect benefits are as follows: o Generation of direct & indirect employment avenues and improved standard of living. o Establishment of small and medium scale engineering ancillaries, industries with cascading direct/ indirect employment opportunities. o Increased revenue to the State & Central exchequer. o Development/strengthening of basic infrastructure.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not applicable
9.3 Set a precedent for later developments Yes A better after use scenario which is likely to increase aesthetic beauty of area and greenery would set precedence for subsequent entrepreneurs who venture such projects.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No No environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes 8 patches of Reserve Forest and 5 patches of Protected Forest Hagri Nadi (~2.5 km in WNW direction) Gokli Nadi(~5.5 km in West direction) Bilar Nadi (~1.5 km in WNW direction) Darvot Nadi (~4.0 km in SSW direction) Jawai River (~6.0 km in NE direction) Shivnagari ka Nala (~5.5 km in North direction)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No None
4 Inland, coastal, marine or underground waters No None
5 State, National boundaries No Not applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes SH-62 (adjacent to plant site) NH-14 (~ 5.5 km in SW direction) NH-62 (~4.5 km in WSW direction) NH-27 (~ 4.0 km in SW direction)
7 Defence installations No Not applicable
8 Densely populated or built-up area Yes Pindwara (~5.0 km in SW direction)
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes There are primary schools, dispensaries, small hospitals, places of worship within 15 km radius of the plant site.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Limestone is present in the captive mine area.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No There is no area already subjected to pollution or environmental damage within 15 km radius of the plant site.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The project site falls in Seismic Zone - III as per IS: 1893 (Part-I): 2002.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 17 Jul 2019
2.NAInformation in respect of following points may be submitted: i. Possibility of transport of limestone by conveyor belt from the mine shall be explored. ii. Possibility of use of surface water/mine pit water shall be explored instead of ground water drawl. 18 Jun 2019
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantGovindaranjan
Designationunithead
Name of Company (Applicant Name should not be given here)ULTRATECH NATHDWARA CEMENT LTD.
AddressB wing, Ahura Centre, 2nd floor, Mahakali caves road
Print