| APPENDIX I | | (See Paragraph-6) | | FORM 1 | | | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| | 1. | |
| Name of the Project/s | Upper Indravati Pumped Storage Hydroelectric Project (4X150MW), District Kalahandi, Odisha | Brief summary of project | Annexure-Brief summary of project | | Proposal Number | IA/OR/RIV/60030/2016 | | Project Cost | cr | |
| | 2. | |
| S. No. in the schedule | 1(c) River Valley projects
| Project Sector | River Valley and Hydroelectric Projects | |
| | 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 600 MW ha. | | | 4. | | New/Expansion/Modernization | New | | | | 5. | Existing Capacity/Area etc. | ha. | | | 6. | Category of project i.e. 'A' or 'B' | A | | | 7. | | Does it attract the general condition? If yes, please specify | No | | | | 8. | | Does it attract the specific condition? If yes, please specify | No | | | | 9. | |
| Location of the project | Near Village Mukiguda, District Kalahandi | | Shape of the project land | Block (Polygon) | | Uploaded GPS file | Annexure-GPS file  | | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | | Plot/Survey/Khasra No. | Near Village Mukiguda, District Kalahandi | | Town / Village | Village Mukiguda | | State of the project | Orissa | |
| | Details of State of the project |
|---|
| S.no | State Name | District Name | Tehsil Name |
|---|
| (1.) | Orissa | Kalahandi | Jayapatna | | | 10. | |
| Nearest railway station along with distance in kms | Junagarah road, 50 km | Nearest airport along with distance in kms | Bhubaneswar, 600 km | |
| | 11. | Nearest Town/City/District Headquarters along with distance in kms | Bhawaniptna , 90 km | | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | | | | 13. | Name of the Applicant | Ashwini | | | 14. | Registered Address | Odisha State Police Housing and welfare corporation Building, Vanivihar Chouk, Janpath | | | 15. | |
| Address for correspondance: | | Name of the Company | ODISHA HYDROPOWER CORPORATION LIMITED | | Name of the Applicant | Ashwini | | Designation (Owner/ Partner/ CEO) | Director (Operation) | | Pin code | 751022 | | E-mail | do@ohpcltd.com | | Telephone No. | 0674-2542983 | | Fax No. | 0674-2542102 | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| | 16. | | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| | 17. | Whether part of Interlinked projects? | No | | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | | 19. | | If Yes, MoEF file number | N/A | | Date of submission | N/A | | | | | | 21. | | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | Yes | | Status | Application for Forest Clearance yet to be submitted | | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | | 22. | | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| | 23. | | Whether any Forest Land Involved? | | | Area of Forest land Involved (hectares) | N/A | |
| | 24. | | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | | (a) Name of the Court | N/A | | (b) Name of the Sub court | N/A | | (c) Case No. | N/A | | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| | 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | The upper reservoir is already operational and about 50 ha of land shall come under submergence in the Lower Reservoir, which shall be calculated. The total land to be acquired for the project is 85 ha.
The ownership status of the land to be acquired shall be finalized as a part of Detailed Project Report, which is under preparation.
About 50 ha of land would get converted into a reservoir due to construction of lower reservoir. The land at present is under following water, forest or agri | | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | The project site is not located close to any major habitations. As per the present level of investigations, about 85 ha of land is to be acquired. The ownership status shall be confirmed as a part of DPR preparation and shall be suitably incorporated in the CEIA study. The forest area shall to be cleared for the project. | | 1.3 | Creation of new land uses? | Yes | About 50 ha of land would get converted into a reservoir. Land use pattern of muck disposal areas, quarry sites too will change with respect to their pre-project status. | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Bore hole drilling, soil sampling, exploratory drifts etc. are proposed as a part of investigation activities. | | 1.5 | Construction works? | Yes | • Construction of 18.00 m high zoned earthen dam composed of central impervious core for creation of lower reservoir
• 8m D-shaped intake Approach Channel app. Length of 200 m
• 2700 m long and 7.5m dia Head Race Tunnel terminating in surge shaft
• 10 m dia Maintenance Gate Shaft
• 100 m high,15m dia Surge Shaft/Tank
• 2 Nos, 5m dia Penstock Tunnel & Pressure Shaft
• 4 Nos, 3.5m dia Penstocks, each for one unit
• 2 Nos, 10 m dia and 80 m deep D/s Surge Shafts, each accommodating 2 Nos. Dr | | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | Temporary sites for construction shall be developed near Power house and Dam site | | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Lower reservoir, Project office, store and project colony comprising are proposed to be constructed for the project. | | 1.9 | Underground works including mining or tunnelling? | Yes | - Underground power house having installation of 4 nos. of reversible Francis Turbine each of 150 MW.
- 1600 m (approx.) long Tail Race Tunnel connecting to Lower Reservoir to carry the power House releases back to reservoir | | 1.10 | Reclamation works? | Yes | The construction site shall be suitably leveled and depressions will be backfilled and suitably compacted.
The construction of the proposed project, including its various appurtenances e.g. dam, power house, approach roads, labour camps, project colony, etc. would marginally affect the topography and physiography. Although, no major alteration of the area is expected as the layout has been so conceived that no major impacts on this account are anticipated. It is proposed to landscape the area | | 1.12 | Offshore structures? | No | | | 1.13 | Production and manufacturing processes? | Yes | Hydropower generation | | 1.14 | Facilities for storage of goods or materials? | Yes | Temporary facilities for storage of cement/ steel / equipment shall be created. | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | During construction phase, labour colonies are proposed to be located at dam site and power house site.
About 500 labour and technical staff are likely to congregate in the area during construction phase. The increase in population is expected to be of the order of 2000.
The average per capita solid waste generated is of the order of 210 gm/day/person. The solid waste likely to be generated from labour camps shall be of the order of 0.42 tonne/day. Adequate facilities for collection, conv | | 1.16 | Facilities for long term housing of operational workers? | Yes | A colony with 50 quarters shall be constructed for housing the staff during in operation phase in the existing project township. | | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | Access roads will be constructed as a part of the project. The exact length and alignment will be finalized in DPR preparation stage and after survey. | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | No such diversion is foreseen at this stage. Adequate measure will be taken as per requirements. | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | | | 1.20 | New or diverted transmission lines or pipelines? | No | | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | Yes | Major fish species reported in the project area include Clarias Channa, Mystus, Chela, Labeo etc.
A detailed programme for amelioration of adverse impacts on riverine fisheries shall be suggested as a part of CEIA study. | | 1.22 | Stream crossings? | No | As per the present level of investigations, no stream crossings are likely to be affected. | | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | The water of river Indravati shall be passed via power house of the project for hydropower generation | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | The proposed project shall lead to change in the water body on account of conversion of reservoir formation due to construction of Lower dam | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | The construction material like cement, The construction material like cement, aggregate and steel proposed to be transported by rail/road. The nearest rail head is located at Kesinga. The main source of Cement is cement plants located at Rajgangpur, Sankarii, which are well connected with rail and road route. Aggregate and sand are proposed to be procured from riverbed, quarry area near the project site. A part of muck will also be utilized as construction material. The suitability of muck for | | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Most of the construction work for the project will be awarded to the contractors, who would bring their own labour. About 500 technical staff and construction labour will be employed during construction phase. Most of the technical staff and construction labour would migrate to the area during construction phase. These construction staff shall go back to their native places after commissioning of the project. | | 1.29 | Introduction of alien species? | No | | | 1.30 | Loss of native species or genetic diversity? | Yes | The project envisages acquisition of some forest land. The impacts on native species or genetic diversity shall be assessed as a part of CEIA Study. If required, appropriate Biodiversity Conservation and Management plan for the Native, Rare & Endangered floral and faunal species getting affected due to the project shall be covered as a part of EMP report. | | 1.31 | Any other actions? | No | | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | The break up of land requirement is given as below:
- Land for construction of lower reservoir- 50 ha
- Land for water conducting system, powerhouse, transformer hall etc.- 10 ha
- Township, stores and roads-15 ha
- Quarry area- 5 ha
- Muck disposal area- 5 ha
The lower reservoir area to be developed due to the project shall be a new land with respect to the pre-project status, which is mainly under vegetation. The quantum of land to be acquired and its ownership status of the land to | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | The water of river Indravati shall be passed via power house of the project for hydropower generation.
During construction and operation phases, small quantity of water would be required for meeting domestic requirements for construction staff/ technical staff.
The water would be analyzed and would be disinfected, if required. The quantity of water required during construction and operation phases for meeting domestic requirements would be 0.27 mld and 0.03 mld respectively | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Source of material may be rock bed material (coarse aggregate & sand). The exact details shall be found out after investigations. Exact quantity shall be known after investigations at DPR stage. | | 2.5 | Forests and timber (source – MT) | No | | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Total requirement of construction power for various project activities by utilizing the grid power from the nearby sub-stations of OHPCL. | | 2.7 | Any other natural resources (use appropriate standard units) | No | | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Explosives will be required during construction phase. All the safety measures as per the Explosive Act and relevant IS codes shall be followed during project construction site. | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | Yes | SSewage and solid waste generated at the construction staff colony/ project colony shall be adequately treated/ disposed to avoid unhealthy conditions.
Adequate treatment/ disposal units will be commissioned during project construction and operation phases.
Appropriate management measures shall be suggested as a part of the Comprehensive EIA study. | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The living condition of locals will be uplifted due to commission of the proposed project and implementation of various measures as part of Local Area Development Plan(LADP). The details of various welfare schemes for local population shall be outlined as a part of the Comprehensive EIA Report. The schemes shall be finalized in consultation with local administration and OHPC Ltd. | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | Yes | The muck generated during construction phase shall be disposed at designated disposal sites. Various activities proposed as a part of the management plan are given as below:
• Land acquisition for muck dumping sites
• Civil works (construction of retaining walls, boulder crate walls etc.)
• Dumping of muck
• Levelling of the area, terracing and implementation of various engineering control measures e.g., boulder, crate wall, masonry wall, catchwater drain.
• Spreading of soil
• Applicati | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | About 500 labour and technical staff are likely to congregate in the area during construction phase. The increase in population is expected to be of the order of 2000. The average per capita solid waste generated is of the order of 210 gm/day/person. The solid waste likely to be generated from labour camps shall be of the order of 0.42 tonne/day. Adequate facilities for collection, conveyance and disposal of solid waste shall be developed.
For solid waste collection, number of masonry storag | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | | | 4.4 | Other industrial process wastes | No | | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | During construction phase, sludge from the sewage treatment plant shall be dried in sludge drying beds. The dried sludge shall be used as manure in the greenbelt developed in the project area or distributed free of cost to locals. | | 4.7 | Construction or demolition wastes | Yes | Construction waste shall be suitably collected and disposed. The details of the same shall be covered in the CEIA report. | | 4.8 | Redundant machinery or equipment | No | Redundant machinery/equipment shall be taken back out of the project to new sites. | | 4.9 | Contaminated soils or other materials | No | | | 4.10 | Agricultural wastes | No | | | 4.11 | Other solid wastes | No | | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | The operation of various construction equipments requires combustion of fuel. Normally diesel is used in such equipments. The major pollutant which gets emitted as a result is SO2 and expected to be quite low. Thus, no adverse impacts on ambient air quality are anticipated. | | 5.2 | Emissions from production processes | No | Air pollution is not anticipated in hydropower generation. | | 5.3 | Emissions from materials handling including storage or transport | Yes | During construction phase there will be increase in vehicular movement. Construction material will be brought and stored at various sites. The emissions are anticipated on account of the following:
• Loading and unloading of construction material and wastes
• Vehicular movement over unpaved roads
• Vehicles carrying material without proper covering, e.g., tarpaulin, etc.
Due to blowing of wind especially when environment is dry, some of the stored material can get entrained in the atmosphe | | 5.4 | Emissions from construction activities including plant and equipment | Yes | The operation of various construction equipment require combustion of fuel. Normally diesel is used in such equipments. The major pollutant which get emitted as a result is SO2. The SPM emission is minimum due to low ash content in diesel. The short term increase in SO2, even assuming all the equipment are operating at a common point is expected to be quite low. Thus, no adverse impacts on ambient air quality is anticipated | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust is expected to be generated during construction on account of:
• Fugitive emissions from stockpiles of construction materials
• Fugitive emissions from stockpiles of waste materials
• Loading and unloading of construction material and wastes
• Vehicular movement over unpaved roads
• Vehicles carrying material without proper covering, e.g., tarpaulin, etc.
The details of control measures shall be outlined in the CEIA report. | | 5.6 | Emissions from incineration of waste | No | | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | | | 5.8 | Emissions from any other sources | No | | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise will be generated during construction phase as a result of operation of construction equipment. As a part of the Comprehensive EIA study, detailed noise modeling study shall be conducted to predict the increase in ambient noise level due to operation of various construction activities including operation of construction equipment, increased vehicular movement, blasting etc. | | 6.2 | From industrial or similar processes | No | | | 6.3 | From construction or demolition | No | | | 6.4 | From blasting or piling | Yes | 80 to 90 dB(A) | | 6.5 | From construction or operational traffic | Yes | During construction phase, there will be increase in vehicular movement for transportation of construction material which is expected to be upto a maximum of 10-15 trucks/hour.
Based on past experience, impacts on ambient noise levels due to operation of construction equipment and increased vehicular movement is not expected to be significant. However, this aspect shall be covered in detail through detailed modeling study as a part of the CEIA study.
For mitigation of impacts due to blas | | 6.6 | From lighting or cooling systems | No | | | 6.7 | From any other sources | No | | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | No | | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | Sewage generated from labour camp shall be treated through aerated lagoons and secondary settling tank and disposed on land or water at sites identified in consultation with the respective district administration. | | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | The solid waste generated from the labour camps shall be suitably collected and disposed by landfilling as mentioned in response to earlier question. The details of the solid waste disposal facilities shall be covered as a part of the Comprehensive EIA study. | | 7.4 | From any other sources | No | | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Explosives shall be used very carefully by the experienced and certified persons. Blasting shall be done in accordance with the rule applicable of such work confirming all codes in respect of safety of human being and other objects. . | | 8.2 | From any other causes | No | | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | The proposed project is located in an area categorized as Zone-I as per seismic zoning Map of India (IS 1893:2002). The structural design will adequately take care of this aspect.
Areas prone to landslides shall be identified during further project related investigation. Appropriate treatment measures, if required, shall be suggested. | | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | About 2000 persons are likely to be deployed during construction phase. The availability of infrastructure could be a problem during the initial construction phase. As a part of Environmental Management Plan, following facilities shall be developed for the construction staff/ technical staff likely to be deployed during project construction phase:
- Potable water supply
- Community toilets and sewage
Treatment plant.
- Free fuel like LPG/ Kerosene
- Solid waste management
- | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | | | 9.3 | Set a precedent for later developments | Yes | Job opportunities will improve significantly in the project area and its surrounding. At present most of the population sustain on agriculture and allied activities. The project will open up scope to the local people for various kinds of jobs both during construction and operation phases. | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Forest land is observed in the proposed project area. Benakhamar Reserve Forest is near to the project site. | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | There is no National Park, Wild life sanctuary, Tiger/Elephant reserve, biosphere reserve etc. in and around the project catchment. However, forest land is acquired as a part of the proposed project area. HRT is being passing through the side of Benakhamar Reserve Forest | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | As per the present level of investigations, areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration are not located within 15 km from the project site. However, this issue will be finalized based on the findings of the CEIA study. | | 4 | Inland, coastal, marine or underground waters | No | | | 5 | State, National boundaries | Yes | | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | | | 7 | Defence installations | No | | | 8 | Densely populated or built-up area | No | | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | As per the present level of information, sensitive man-made land uses, e.g., hospitals, schools, places of worship, community facilities, are not envisaged to be submerged. This would be confirmed during CEIA studies.
Within 15 km from the proposed project, hospitals, schools, places of worship, community facilities, are observed, but such facilities are not likely to be affected. | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | The impacts on flora and fauna on account of submergence of forest area will be assessed and appropriate management measures will be covered as a part of the CEIA study. | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | Yes | The project is located in Zone-I as per seismic zoning Map of India (IS 1893: 2002). The structural design will adequately cover this aspect.
Areas prone to land slides shall be identified, during further investigations. Appropriate treatment measures, if required, shall be suggested. | | | (IV) | Proposed Terms of Reference for EIA studies | | Essential Detail Sought : NIL | | Additional Detail Sought : NIL | | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | | V.(i) | | Name of Applicant | Ashwini | | Designation | Director (Operation) | | Name of Company (Applicant Name should not be given here) | ODISHA HYDROPOWER CORPORATION LIMITED | | Address | Odisha State Police Housing and welfare corporation Building, Vanivihar Chouk, Janpath |
| |
|