| APPENDIX I | | (See Paragraph-6) | | FORM 1 | | | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| | 1. | |
| Name of the Project/s | Riverfront Development for Mula, Mutha & Mula - Mutha River, Pune. | Brief summary of project | Annexure-Brief summary of project | | Proposal Number | IA/MH/NCP/64072/2017 | | Project Cost | 300000 lacs | |
| | 2. | |
| S. No. in the schedule | 8(b) Townships and Area Development projects.
| Project Sector | INFRA-1 | |
| | 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Approximate total Area: 820 Ha.including river and river banks ha. | | | 4. | | New/Expansion/Modernization | New | | | | 5. | Existing Capacity/Area etc. | 0 ha. | | | 6. | Category of project i.e. 'A' or 'B' | A | | | 7. | | Does it attract the general condition? If yes, please specify | No | | | | 8. | | Does it attract the specific condition? If yes, please specify | No | | | | 9. | |
| Location of the project | Within PMC, PCMC and KCB Boundary Mula River: Mumbai-Pune Bypass to Sangam Bridge (22.2 Km), Mutha River: Mumbai-Pune Bypass to Mula Mutha Sangam (10.4 Km) Mula-Mutha River: Mula Mutha Sangam to Kharadi (11.8 Km) | | Shape of the project land | Block (Polygon) | | Uploaded GPS file | Annexure-GPS file  | | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | | Plot/Survey/Khasra No. | - | | Town / Village | 1. Parvati
2. Erandwane
3. Bhamburda
4. Bopodi
5. Aundh
6. Karvenagar - Hingane Budruk
7. Hingane Khurd
8. Shaniwar Peth
9. Sadashiv Peth
10. Narayan Peth
11. Suburban TPS
12. Sangam wadi T | | State of the project | Maharashtra | |
| | Details of State of the project |
|---|
| S.no | State Name | District Name | Tehsil Name |
|---|
| (1.) | Maharashtra | Pune | Pune City | | | 10. | |
| Nearest railway station along with distance in kms | Pune Railway Jn, 1.70 km | Nearest airport along with distance in kms | Pune International Airport, 4.25 km | |
| | 11. | Nearest Town/City/District Headquarters along with distance in kms | Pune city , 0.00 km | | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Pune Municipal Corporation
PMC Building, Near Mangla Theatre, Shivajinagar, Pune, Maharashtra 411005
Phone: (020) 2550 1000 | | | 13. | Name of the Applicant | Kunal | | | 14. | Registered Address | PMC building, near mangla theatre, shivajinagar, pune, Maharashtra-411005 | | | 15. | |
| Address for correspondance: | | Name of the Company | PUNE MUNICIPAL CORPORATION | | Name of the Applicant | Kunal | | Designation (Owner/ Partner/ CEO) | commissioner | | Pin code | 411005 | | E-mail | puneriverprojects@gmail.com | | Telephone No. | 020-25501103 | | Fax No. | 020-25501104 | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| | 16. | | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| | 17. | Whether part of Interlinked projects? | No | | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | | 19. | | If Yes, MoEF file number | N/A | | Date of submission | N/A | | | | | | 21. | | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | | 22. | | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| | 23. | | Whether any Forest Land Involved? | No | | Area of Forest land Involved (hectares) | N/A | |
| | 24. | | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | | (a) Name of the Court | N/A | | (b) Name of the Sub court | N/A | | (c) Case No. | N/A | | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| | 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | Site is an open land and will be developed into Riverfront development project. There will be permanent change in present land use. | | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Depending on the requirement, trees will be cut or transplanted.
Slum households within the Study area will be relocated as per R & R policy. | | 1.3 | Creation of new land uses? | Yes | As per requirement. | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Based on civil structures erected in surrounding area, the soil strata of the site is suitable for erecting civil structures. Detailed soil testing and hydraulic feasibility has been carried out. ANNEXURE - III | | 1.5 | Construction works? | Yes | Construction of Embankments, Promenades, Ghats, Accesses, proposed Parks & Gardens, Bridges, Barrages and the proposed Road Network etc. are involved as per requirement. | | 1.6 | Demolition works? | Yes | The project will be constructed in narrow area and may include demolition of obstructive structures like check dams, low level causeways, visarjan tanks, etc. which affects flood. Demolition work will allow safer passage of floods. | | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | Portable cabins for workers will be established at site. Drinking water, electricity, canteen, restroom, bathroom and toilet will be provided to the construction workers.
The site is developing within PMC area. The site offices & the construction labor camps will be developed with the collection & conveyance network. The sewage from these areas will be disposed to the nearby municipal network. These networks are further then discharged to the treatment facility within PMC limit. | | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Construction will be carried out as per Architectural and structural drawings. | | 1.9 | Underground works including mining or tunnelling? | No | Not Applicable. | | 1.10 | Reclamation works? | Yes | In Riverfront Development of Mula, Mutha & Mula –Mutha River Project, reclamation of approximate 100 ha of land has been envisaged at this design stage. | | 1.11 | Dredging? | No | Not Applicable. | | 1.12 | Offshore structures? | No | Not Applicable. | | 1.13 | Production and manufacturing processes? | No | Not Applicable. | | 1.14 | Facilities for storage of goods or materials? | Yes | As per requirement, temporary storage would be provided for the construction material on the site. | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Operation Phase - The solid wastes generated will be segregated into biodegradable and non-biodegradable at source, and then it will be transferred to solid waste yard for further segregation. The biodegradable waste will be treated within the premises in Organic waste convertor at decentralized location. The waste converted shall be used as manure within the project area for the landscape. The non-biodegradable waste will be
handed over to the authorized vendor. | | 1.16 | Facilities for long term housing of operational workers? | No | Only local labors would be employed and thus no permanent housing facility for operational workers is provided. | | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | The development will not have any major impact on traffic pattern as the existing streets in areas surrounding the riverfront will be used. | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | Yes | Development of new proposed roads & bridges to improve connectivity along the river front and across the river. | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | Yes | Augmentation and Up gradation of existing roads may be done as per requirement | | 1.20 | New or diverted transmission lines or pipelines? | Yes | New water line, electricity line, gas line, OFC cables, telephone line laid by respective department for supply of the same. | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | Yes | Barrages & Check dams will be proposed on the river to retain water diversion.
Check dams are proposed to reduce the velocity and avoid soil erosion. The other purpose of constructing the check dams is to have water storage throughout the year and avoiding the river dry situation.
The velocity will get reduced during dry weather flow and avoid the scouring,
silting of the river bed. | | 1.22 | Stream crossings? | Yes | As required | | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Not Applicable | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | Yes | Check dams will be designed to improve the drainage & runoff water of the river. | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Construction materials like steel, aggregates, sand and cement will be sourced from local markets and transported by roads. | | 1.26 | Long-term dismantling or decommissioning or restoration works? | Yes | As and when required | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | The number of existing visitors at present is nil. However, after completion of this project the expected population coming to be around 12,000 per day floating population. Hence, the total sewage generation after development is 144 M3/day.The common essential amenities like Lavatory Blocks are proposed. The sewage collected from this facility will be connected to the sewage treatment facility within the project area. The decentralized sewage treatment facility is
proposed within the project. | | 1.29 | Introduction of alien species? | No | The greenbelt will be developed as per the requirements of MoEF/MPCB. Only native species will be planted. | | 1.30 | Loss of native species or genetic diversity? | No | Not Applicable | | 1.31 | Any other actions? | No | Not Applicable | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Undeveloped and agricultural land can be seen along Mula River and some parts of Mula-Mutha River (on the outskirts of the city) | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | CONSTRUCTlON PHASE:
Source: Pune Municipal Corporation, Pune Information (assumed 700 labor during construction phase & 1800-2000 M2 every day and construction phase is considered as 5 years)
Total Demand = 174 m3/day
Domestic = 49 m3/day (@70 LPCD & supply at 1 common point)
Construction = 125 m3/day
The domestic sewage generated from the premises (during construction phase) will be connected to the municipal sewerage network which is available in the vicinity. | | 2.3 | Minerals (MT) | No | Not Applicable | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction materials like stone, aggregates, steel and cement, etc will be sourced from local retailers. | | 2.5 | Forests and timber (source – MT) | No | Not Applicable | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Source of Electricity: MSEDCL
Operation Phase demand: 5 mVA (this includes the recreational facility and embankment development)
Construction Phase:
Source: MSEDCL Power Supply
Construction Phase demand: 0.50 mVA | | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | No such material will be utilized. | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Socio- economic standard of people will improve due to more employment opportunities provided by this project and rehabilitation/ relocation proposals. | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Impact of this type is not envisaged. | | 3.5 | Any other causes | No | Not Applicable | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Domestic garbage @ 0.4 kg/person/day will be generated during construction phase and during Operation phase 0.07 kg/person/day will be generated. | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | Not Applicable. No Hazardous waste will be generated by the proposed project. | | 4.4 | Other industrial process wastes | No | Not Applicable | | 4.5 | Surplus product | No | Not Applicable | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | The sludge generated from the Sewage treatment plant will be transferred to the Solid waste treatment yards and further
then used as manure for gardening. | | 4.7 | Construction or demolition wastes | Yes | Construction waste will be used for filling, levelling and sub grade preparation on the river bank as well as road surface within the project area. | | 4.8 | Redundant machinery or equipment | No | Not Applicable | | 4.9 | Contaminated soils or other materials | No | Not Applicable | | 4.10 | Agricultural wastes | No | Not Applicable | | 4.11 | Other solid wastes | No | Not Applicable | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | There will be a slight increase in
emission of SO2, NOx & PM due to
movement of trucks carrying raw
material and due to construction
machinery during construction phase
and due to emission from vehicular
movement during operation phase. | | 5.2 | Emissions from production processes | No | Not Applicable | | 5.3 | Emissions from materials handling including storage or transport | Yes | Dusting may occur during loading and unloading of cement bags, sand & excavations. | | 5.4 | Emissions from construction activities including plant and equipment | Yes | Fugitive dust emissions and engine exhaust of construction machines | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust, which will be generated during construction, water will be sprinkled. | | 5.6 | Emissions from incineration of waste | No | Not Applicable | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not Applicable | | 5.8 | Emissions from any other sources | No | Not Applicable | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Construction equipments such as mixer machines, bulldozers, cranes, compactors and excavators will be located strategically so that no adverse impact is caused. | | 6.2 | From industrial or similar processes | No | Not Applicable | | 6.3 | From construction or demolition | Yes | The activities will be done during daytime and night time. Personnel protective equipment will be provided and their proper usage will be ensured for eardrum protection of the workers. We will take necessary precaution and ensure that the noise pollution level will be within
permissible limit. | | 6.4 | From blasting or piling | Yes | Piling work during the foundation. | | 6.5 | From construction or operational traffic | Yes | Because of movement of trucks carrying construction materials.
Impacts will be Temporary and
negligible in nature. | | 6.6 | From lighting or cooling systems | No | Not Applicable | | 6.7 | From any other sources | No | Not Applicable | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Not Applicable | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | The project includes the revamping of the existing infrastructure within the river bank. As the trunk sewers are located in low laying area within the submergence, over flooding of sewers, runoff entering the sewers resulting into the bad functioning of the sewage treatment facility which is also a normally observed serious issue. As the network will be planned and realigned above the HFL, the damages to Sewer will get resolved. | | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | There will not be any major source of pollution during operation phase. | | 7.4 | From any other sources | No | Not Applicable | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not Applicable | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Not Applicable | | 8.2 | From any other causes | Yes | Fire hazard may occur due to electrical short circuiting or other such related problems. The measures to prevent any hazard will be provided as per the norms. Provision of insure for contractor. | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | The area is classified as seismic Zone III (least to moderate) & IV (High Risk Zone). The flooding during monsoon season is the serious issue in almost all the areas especially in old Pune every year affecting the economy,
environment & physical impacts. | | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | The project will involve
construction of river embankment,
proposed parks, and gardens.
Diversion at sewer line to STP. It is
observed at many places the
sewage is been discharged into
the river, The free flow discharge of sewer shall be connected to the sewage network and then transferred to the nearest treatment facility.
Open defecation along the bank of the river will be avoided to clean the river. | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not Applicable | | 9.3 | Set a precedent for later developments | No | Not Applicable | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | As the environmental impact from the project is marginal, no cumulative effects are envisaged. | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Aga Khan Palace, Shaniwarwada,
Vishrambaug Wada, Pataleshwar Caves, All building under Heritage List
(Annexure – II) | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | Not Applicable | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not Applicable | | 4 | Inland, coastal, marine or underground waters | No | - | | 5 | State, National boundaries | Yes | - | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | Railway Station: Pune Junction: 1.7 km
Airport:
Pune Airport: 4.25 km. | | 7 | Defence installations | Yes | Kirkee Cantonment Board, College of Military engineering, AFK, BEG, Pune
Cantonment Board,etc | | 8 | Densely populated or built-up area | Yes | There are some densely populated and built up areas along Mutha River. | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Places of worship, Hospitals, Crematorium, etc. | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Not Applicable | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | Yes | River is polluted by sewerage and solid waste dumping in some of the cases. The damage to the environment will be reduced or nil due to proposed
project. | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | Yes | There are many areas along the river are affected by flood frequently, these are mainly Vitthalwadi, Khilarewadi (Erandwane),
Deccan, Shaniwar Peth, Sangamwadi etc. | | | (IV) | Proposed Terms of Reference for EIA studies | | | | Additional Attachments, if any |
|---|
| Attached File |
|---|
| Form-I |
| | | Essential Detail Sought : NIL | | Additional Detail Sought : NIL | | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | | V.(i) | | Name of Applicant | Kunal | | Designation | commissioner | | Name of Company (Applicant Name should not be given here) | PUNE MUNICIPAL CORPORATION | | Address | PMC building, near mangla theatre, shivajinagar, pune, Maharashtra-411005 |
| |
|