| APPENDIX I | | (See Paragraph-6) | | FORM 1 | | | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| | 1. | |
| Name of the Project/s | M/s Sri Venkatesh Iron & Alloys (India) Ltd | Brief summary of project | Annexure-Brief summary of project | | Proposal Number | IA/JH/IND/67350/2017 | | Project Cost | 12849 lacs | |
| | 2. | |
| S. No. in the schedule | 3(a) Metallurgical industries (ferrous & non ferrous)
| Project Sector | Industrial Projects - 1 | |
| | 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Proposed: 2 induction furnaces 2×12T (73,500 TPA), Billet Caster 72,000 TPA along with Captive Power Plant of capacity 16MW/Area: 5.82ha ha. | | | 4. | | New/Expansion/Modernization | New | | | | 5. | Existing Capacity/Area etc. | 5.82 ha. | | | 6. | Category of project i.e. 'A' or 'B' | A | | | 7. | | Does it attract the general condition? If yes, please specify | No | | | | 8. | | Does it attract the specific condition? If yes, please specify | No | | | | 9. | |
| Location of the project | Vill – Lapanga, P.O. – Bhadaninagar, District – Ramgarh Jharkhand | | Shape of the project land | Block (Polygon) | | Uploaded GPS file | Annexure-GPS file  | | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | | Plot/Survey/Khasra No. | 895,888, Land Documents will be attached as Additional Documents | | Town / Village | Vill – Lapanga, P.O. – Bhadaninagar, District – Ramgarh Jharkhand. | | State of the project | Jharkhand | |
| | Details of State of the project |
|---|
| S.no | State Name | District Name | Tehsil Name |
|---|
| (1.) | Jharkhand | Ramgarh | Patratu | | | 10. | |
| Nearest railway station along with distance in kms | Bhurkunda Railway Station, 2.50 km | Nearest airport along with distance in kms | Birsa Munda Airport, Ranchi, 37 km | |
| | 11. | Nearest Town/City/District Headquarters along with distance in kms | Bhadani Nagar , 2.5 km | | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Village-Lapanga, PO- Bhadani Nagar, District- Ramgarh, State-Jharkhand | | | 13. | Name of the Applicant | Ankit | | | 14. | Registered Address | Village :Lapanga, P.O - Bhadaninagar,District-Rangarh,Jharkhand | | | 15. | |
| Address for correspondance: | | Name of the Company | SRI VENKATESH IRON AND ALLOYS (INDIA)LIMITED | | Name of the Applicant | Ankit | | Designation (Owner/ Partner/ CEO) | Director | | Pin code | 700053 | | E-mail | venkateshiron2017@gmail.com | | Telephone No. | 0124-4291036 | | Fax No. | 0124- | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| | 16. | | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| | 17. | Whether part of Interlinked projects? | No | | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | | 19. | | If Yes, MoEF file number | N/A | | Date of submission | N/A | | | | | | 21. | | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | | 22. | | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| | 23. | | Whether any Forest Land Involved? | No | | Area of Forest land Involved (hectares) | N/A | |
| | 24. | | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | | (a) Name of the Court | N/A | | (b) Name of the Sub court | N/A | | (c) Case No. | N/A | | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| | 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | The expansion is planned within the existing plant boundary hence change in land use, land cover or topography is not expected | | 1.2 | Clearance of existing land, vegetation and buildings? | No | There would not be any clearance of land, vegetation, and buildings | | 1.3 | Creation of new land uses? | No | No new land use creation | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Geophysical investigation, including Insitu testing for the characterization of surface and subsurface soil properties | | 1.5 | Construction works? | Yes | Construction/erection work shall be required for installation of 2x12 T Induction Furnace, Billet Caster and Captive Power plant. | | 1.6 | Demolition works? | No | No demolition work is required. | | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | No housing for construction workers proposed | | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Construction of housing/shed for machinery, equipments | | 1.9 | Underground works including mining or tunnelling? | Yes | No mining / tunnelling is involved. However, some underground work limited to foundation / ducting/underground cable tunnel etc. | | 1.10 | Reclamation works? | No | Not required | | 1.11 | Dredging? | No | Not required | | 1.12 | Offshore structures? | No | Not required | | 1.13 | Production and manufacturing processes? | Yes | Production of Liquid Steel through Induction Furnace & production of Billets through Billet Caster. Generation of Power through Waste Heat Recovery Boilers and Atmospheric Fluidised Bed Combustion Boiler | | 1.14 | Facilities for storage of goods or materials? | Yes | Storage facilities for raw material and finished product will be provided within the plant premise | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Facilities for treatment of Liquid Effluent Neutralization Pit for DM Plant waste water has been proposed Facilities for Disposal of Solid wastes Solid Waste, either be reused in the process or sold. | | 1.16 | Facilities for long term housing of operational workers? | No | Not envisaged | | 1.17 | New road, rail or sea traffic during construction or operation? | No | No new road & rail network construction envisaged as the Existing Unit has all the required facilities. | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Existing facilities shall be utilised. | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not applicable | | 1.20 | New or diverted transmission lines or pipelines? | No | Not applicable | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not applicable | | 1.22 | Stream crossings? | No | Not applicable | | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Water requirement for Expansion: 1410 KLD Source: Water will be sourced from Damodar River after getting permission from the concerned authority. | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not applicable | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | The raw materials will be sourced from local market. These will be transported to the site by road through trucks. Manpower will be sourced locally hence no transportation of personnel for construction, operation or decommissioning is required | | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | No decommissioning or restoration works are involved. | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not applicable | | 1.28 | Influx of people to an area in either temporarily or permanently? | No | Manpower will be sourced locally for construction and as well as for operation of the plant, hence no influx of the people in the area is expected. Direct manpower for operation of the expansion plant shall be 150 only. | | 1.29 | Introduction of alien species? | No | Not applicable | | 1.30 | Loss of native species or genetic diversity? | No | Not applicable | | 1.31 | Any other actions? | No | Not applicable | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Not Applicable | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Existing Water Requirement: 245 KLD Additional water requirement for Expansion: 1410 KLD Total Water Required after Expansion: 1655 KLD Source: Competing users are other industries in the area. | | 2.3 | Minerals (MT) | Yes | For the Existing Plant (4x100 TPD) Sponge Iron Plant Iron Ore – 1,92,000 TPA Non-Coking Coal – 1,56,000 TPA Dolomite / Limestone – 3600 TPA For Proposed Plant (2x12 T IF & 16 MW CPP) Non-coking coal – 45,000 TPA | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction material like stone chips, cements, required for foundation work, shall be sourced from local Contractors. | | 2.5 | Forests and timber (source – MT) | No | Not applicable | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Existing: 0.85 MW,Proposed: 14.95 MW,Total: 15.8 MW
Source: CPP of capacity 16 MW is proposed. 1x500 KVA DG Set and 1x250 KVA DG Set have been proposed for meeting emergency power requirement in addition to the existing 1x500 KVA DG Set. Power from JSEB shall be drawn in case of breakdown in Power plant. Present permission from JSEB is 0.85 MW | | 2.7 | Any other natural resources (use appropriate standard units) | No | Not applicable | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | No hazardous substances as per MSIHC Rules will be used in the proposed project except LDO/HSD for use in Light & Heavy Vehicles and in AFBC Boiler during start. | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Project activities are not likely to cause changes in occurrence of disease or affect disease vectors | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Additional employment opportunities will be created by the proposed expansion of the plant. People will be benefited by direct and indirect employment which would improve their living conditions of the people and also through CSR activities taken up by the proponent. | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not applicable. | | 3.5 | Any other causes | No | Not applicable. | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | No | No mine waste, overburden or Spoil. | | 4.2 | Municipal waste (domestic and or commercial wastes) | No | Not applicable | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used Oil approx. 240 Litres /Annum. Will be sold through registered recycler. | | 4.4 | Other industrial process wastes | Yes | Dolo-Char from DRI: 30000 TPA will be used as fuel in AFBC Power Plant IF Slag: 15000 TPA shall be used for road making and other developmental work after metal recovery. Fly Ash from WHRB ESP unit: 21000 TPA shall be sold to fly-ash Brick/ Block Manufacturer or Cement Plants. Fly Ash from CPP: 20400 TPA shall be sold to fly-ash Brick/ Block Manufacturer or Cement Plants. Bottom Ash from CPP: 5100 TPA shall be used for Road making | | 4.5 | Surplus product | No | Nil | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | No housing for workers proposed. Workers shall be hired from local area hence no sewage sludge generation. Sludge from Neutralization Pit shall be disposed-off in Secured landfill. | | 4.7 | Construction or demolition wastes | Yes | No demolition waste. Construction waste like brick bats etc. will be utilized in levelling of land and construction of roads | | 4.8 | Redundant machinery or equipment | No | There will not be any redundant machinery or equipment. | | 4.9 | Contaminated soils or other materials | No | There will be no contamination of soil or any other material | | 4.10 | Agricultural wastes | No | No agricultural wastes will be generated. | | 4.11 | Other solid wastes | No | Not Applicable | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Fossil fuel shall be used in Dumper and Trucks used for transportation of materials and in CPP during start-up. Emission contain PM, SO2, NOx and HC | | 5.2 | Emissions from production processes | Yes | Emission from Induction Furnace Stack & Power Plant (additional load due to the project) PM – 6.74 kg/hr SO2 – 62 kg/hr | | 5.3 | Emissions from materials handling including storage or transport | Yes | Included in 5.1 above. | | 5.4 | Emissions from construction activities including plant and equipment | Yes | Construction equipment aided with fossil fuel (diesel) are Cranes, Compressor, Mortar mixing drums etc. PM – 1.06 kg/hr | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | Dust generation as mentioned above. No odour problems. Included in 5.4 above | | 5.6 | Emissions from incineration of waste | No | Not applicable | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable | | 5.8 | Emissions from any other sources | No | Not applicable | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Overall noise level shall be limited to 85 dB(A) | | 6.2 | From industrial or similar processes | Yes | The noise generation from Induction Furnace, Billet Caster, Compressor etc. Overall noise levels shall be limited to 85 dB (A). | | 6.3 | From construction or demolition | No | Noise due to operation of Cranes, Trucks, Dumpers, Construction machineries etc. Overall noise levels shall be limited to 85 dB (A). | | 6.4 | From blasting or piling | No | Not applicable | | 6.5 | From construction or operational traffic | Yes | Overall noise levels shall be limited to 85 dB | | 6.6 | From lighting or cooling systems | No | Not applicable | | 6.7 | From any other sources | No | Not applicable | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Hazardous wastes (Used Oil) shall be suitably disposed-off through registered recyclers, as per Hazardous and Other Wastes (Management & Transboundary Movement) Rules, 2016 and subsequent amendments | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | For sewage discharge septic tanks with soak pits have been provided. If any effluent discharged to surface water or land shall meet the statutory norms and shall be used for gardening etc. | | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Adequate stack height and good engineering practices shall be ensured to keep emission of particulate matter to minimal. Hence there shall not be any risk of contamination of land or water from release of pollutants. | | 7.4 | From any other sources | No | Not applicable | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not applicable | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Not applicable | | 8.2 | From any other causes | No | Not applicable | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | No such event is known to have occurred in the area. Area falls under Seismic Zone II-III. | | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Supporting facilities are available as it is an operating plant.
The proposed project will have a positive effect and enhance the growth of the region. | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not applicable | | 9.3 | Set a precedent for later developments | Yes | The technology shall enable energy efficiency and process optimisation and will set precedent for later development | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | There are similar industries in the nearby area, which may have cumulative effects. However, no increase in pollution load is expected from the present proposal | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | No such area within 10 km around the site. | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | Not applicable | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not applicable | | 4 | Inland, coastal, marine or underground waters | Yes | Damodar river is at a distance of 1.15 km (approx) in North. Nalkari Nadi is at a distance of 6 Km (approx) in North West. | | 5 | State, National boundaries | No | No State/National boundaries within 10 km from the site. | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | No routes or facilities within 10 km. area which is used by public for access to recreation, tourist or pilgrim area. | | 7 | Defence installations | No | No within 10km around the site | | 8 | Densely populated or built-up area | Yes | Bhadani Nagr is at a distance of 2.5 km (approx) in West. | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Catholic Ashram School is at a distance of 3 km (approx) in West. Railway Hospital is present at a distance of 10 km in North-West. Chaingada Temple is 2 km (approx) in South- East direction. | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Not applicable | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not applicable | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Not applicable | | | (IV) | Proposed Terms of Reference for EIA studies | | | Essential Detail Sought: |
|---|
| Sno. | EDS Letter | Remarks | Date of EDS |
|---|
| 1. | NA | The proposal is for expansion of 4 x 100 TPD Sponge Iron Plant by installing 16 MW Power Plant using WHRB and AFBC boiler 2 x 12 T SMS with 6/11 radius 2 strand Concast. Therefore, you are requested to make application under expansion category instead of new category as mentioned in the Form-I | 16 Aug 2017 | | | Additional Detail Sought : NIL | | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | | V.(i) | | Name of Applicant | Ankit | | Designation | Director | | Name of Company (Applicant Name should not be given here) | SRI VENKATESH IRON AND ALLOYS (INDIA)LIMITED | | Address | Village :Lapanga, P.O - Bhadaninagar,District-Rangarh,Jharkhand |
|
|