| APPENDIX I | | (See Paragraph-6) | | FORM 1 | | | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| | 1. | |
| Name of the Project/s | Proposed Installation of Single Point Mooring & Associated Infrastructure by Coviva Energy Terminals Limited. (a subsidiary of Nayara Energy Ltd. Company) | Brief summary of project | Annexure-Brief summary of project | | Proposal Number | IA/GJ/MIS/113096/2019 | | Project Cost | 50000 lacs | |
| | 2. | |
| S. No. in the schedule | 7(e) Ports, Harbours
| Project Sector | INFRA-2 | |
| | 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | SPM capable of handling up to 350,000 DWT Ships. ha. | | | 4. | | New/Expansion/Modernization | New | | | | 5. | Existing Capacity/Area etc. | 0 ha. | | | 6. | Category of project i.e. 'A' or 'B' | A | | | 7. | | Does it attract the general condition? If yes, please specify | No | | | | 8. | | Does it attract the specific condition? If yes, please specify | No | | | | 9. | |
| Location of the project | Vadinar | | Shape of the project land | Block (Polygon) | | Uploaded GPS file | Annexure-GPS file  | | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | | Plot/Survey/Khasra No. | Not Applicable | | Town / Village | Vadinar | | State of the project | Gujarat | |
| | Details of State of the project |
|---|
| S.no | State Name | District Name | Tehsil Name |
|---|
| (1.) | Gujarat | Devbhumi Dwarka | Khambhalia | | | 10. | |
| Nearest railway station along with distance in kms | khambhalia, 34 km | Nearest airport along with distance in kms | Jamnagar, 50 km | |
| | 11. | Nearest Town/City/District Headquarters along with distance in kms | khambhaliya , 34 km | | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Vadinar gram Panchayat, Ta-Khambhalia, District-Devbhumi Dwarka | | | 13. | Name of the Applicant | Sachin | | | 14. | Registered Address | Khambhalia, Post Box No.24, District Devbhumi Dwarka | | | 15. | |
| Address for correspondance: | | Name of the Company | COVIVA ENERGY TERMINALS LIMITED | | Name of the Applicant | Sachin | | Designation (Owner/ Partner/ CEO) | LeadHSEF | | Pin code | 361305 | | E-mail | sachin.shah@nayaraenergy.com | | Telephone No. | 02833-661385 | | Fax No. | 02833- | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| | 16. | | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | Yes | | Uploaded details | Annexure-Uploaded details | |
| | 17. | Whether part of Interlinked projects? | Yes | | | 18. | Whether separate application of Interlinked project has been submitted? | Yes | | | 19. | | If Yes, MoEF file number | F. No. 10-121/2008-IA- III. for Environment Clearance for Berth C&D- EC granted | | Date of submission | 22/08/2008 | | | | | | 21. | | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | Yes | | | | 22. | | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| | 23. | | Whether any Forest Land Involved? | No | | Area of Forest land Involved (hectares) | N/A | |
| | 24. | | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | | (a) Name of the Court | N/A | | (b) Name of the Sub court | N/A | | (c) Case No. | N/A | | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| | 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | Proposed SPM-2 will be installed in offshore area at sea. Associated sub sea pipeline will be laid in sea area connecting existing SPM-1 with SPM-2 and SPM-2 to Berth-D. | | 1.2 | Clearance of existing land, vegetation and buildings? | No | Not applicable | | 1.3 | Creation of new land uses? | No | Not applicable | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Geotechnical Investigation data for existing offshore area is available for reference. | | 1.5 | Construction works? | Yes | Proposed SPM-2 will be installed in offshore area at sea. Associated subsea pipeline will be laid in sea area connecting existing SPM-1 with SPM-2 and SPM-2 to Berth-D. | | 1.6 | Demolition works? | No | No demolition is envisaged | | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Not applicable | | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | No | Not applicable | | 1.9 | Underground works including mining or tunnelling? | No | Not Applicable | | 1.10 | Reclamation works? | No | Not Applicable | | 1.11 | Dredging? | No | No, The Crude pipeline will be laid on the Sea bed, However trench may have to be made for laying the pipeline depending upon the seabed profile. | | 1.12 | Offshore structures? | Yes | The SPM will be a floating body anchored through 6 chains fixed with piles on Sea bed | | 1.13 | Production and manufacturing processes? | No | No production and manufacturing process, However SPM and Pipelines will be used to handle Crude. | | 1.14 | Facilities for storage of goods or materials? | No | Only Transfer of crude is envisaged through the SPM and pipeline. | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | No | Not applicable. | | 1.16 | Facilities for long term housing of operational workers? | No | Not Required. | | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | Sea traffic will increase during operation. | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not Applicable | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not Applicable | | 1.20 | New or diverted transmission lines or pipelines? | No | Not Applicable | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not Applicable | | 1.22 | Stream crossings? | No | Not Applicable | | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | No abstraction of ground or surface water. | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | There will be increase in transport of personnel and material during construction stage but will be marginal & reversible. | | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | SPM Installation & laying of Pipelines activities may lead to temporary nominal influx of people | | 1.29 | Introduction of alien species? | No | Not Applicable | | 1.30 | Loss of native species or genetic diversity? | No | Not Applicable | | 1.31 | Any other actions? | No | Not Applicable | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Not Applicable | | 2.2 | Water (expected source & competing users) unit: KLD | No | Not Applicable | | 2.3 | Minerals (MT) | No | Not Applicable | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | All construction material will be brought from local sources. | | 2.5 | Forests and timber (source – MT) | No | Not Applicable | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | No | Not Applicable | | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Project involves crude oil handling facility and crude transfer pipelines. | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The impact would be positive impact, as the project will create/increase employment both during construction and operation phase of the project. Various ongoing welfare activities will be extended by the industry in consultation with the local administration. | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | | 3.5 | Any other causes | No | Not Applicable | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Domestic waste (garbage) will be generated during construction and operation phase and this will be handled within the existing solid waste treatment facility. Commercial waste will be disposed as scrap. | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | Not Applicable | | 4.4 | Other industrial process wastes | No | Not Applicable | | 4.5 | Surplus product | No | Not Applicable | | 4.6 | Sewage sludge or other sludge from effluent treatment | No | Not Applicable | | 4.7 | Construction or demolition wastes | No | Not Applicable | | 4.8 | Redundant machinery or equipment | No | Not Applicable | | 4.9 | Contaminated soils or other materials | No | Not Applicable | | 4.10 | Agricultural wastes | No | Not Applicable | | 4.11 | Other solid wastes | No | Not Applicable | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | No | Not Applicable. | | 5.2 | Emissions from production processes | No | Not Applicable. | | 5.3 | Emissions from materials handling including storage or transport | Yes | Marginal emission due to vehicular/marine movement for transportation. | | 5.4 | Emissions from construction activities including plant and equipment | No | Not Applicable. | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | Not Applicable. | | 5.6 | Emissions from incineration of waste | No | Not Applicable. | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not Applicable. | | 5.8 | Emissions from any other sources | No | Not Applicable. | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | No | Not Applicable | | 6.2 | From industrial or similar processes | No | Not Applicable | | 6.3 | From construction or demolition | No | Not Applicable | | 6.4 | From blasting or piling | Yes | Limited piling activities shall be carried out during proposed project as per requirement. | | 6.5 | From construction or operational traffic | Yes | During construction phase, there will be marginal increase in noise due to traffic movement in the project area due to transportation of man and machinery. | | 6.6 | From lighting or cooling systems | No | Not Applicable | | 6.7 | From any other sources | No | Not Applicable | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | No | All material will be handled as per best safety practices and in accordance with the applicable rules. All necessary precautions shall be in place to prevent any spill/ contamination. The same shall be addressed during design & engineering stage.
All material transfer will be done using closed system pipelines. | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Not applicable. | | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Not applicable. | | 7.4 | From any other sources | No | Not applicable. | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not applicable. | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Risk Assessment shall be carried out accordingly risk Management Plan and Emergency Preparedness Plan already in place at Refinery will be updated.
All appropriate measures will be taken for safe handling of materials. | | 8.2 | From any other causes | No | Not Applicable | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | Sufficient provisions are provided in the design to take care of natural disasters that are commonly known/recorded in the area. | | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | This project will increase direct and indirect employment opportunities in the area.
Ancillary units for maintenance and supply of materials have a potential for development due to the project. | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | | | 9.3 | Set a precedent for later developments | No | | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | IOCL, BORL & Reliance SPMs including existing SPM-1 of the company are available in the vicinity of the project | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Not Applicable | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | CRZ area, Marine National Park & Marine Sanctuary in 10 Km radius. | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not Applicable | | 4 | Inland, coastal, marine or underground waters | Yes | Work inside Deendayal Port Trust (DPT) waters. Area falls in Gulf of Kutch. | | 5 | State, National boundaries | No | Not Applicable | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | Not Applicable | | 7 | Defence installations | No | Not Applicable | | 8 | Densely populated or built-up area | No | | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | The region is rated IV in seismic rating and has experienced earthquake with epicenter at Bhuj in 2001. Cyclone was experienced in 1998.
The project will be designed to resist the natural calamities. | | | (IV) | Proposed Terms of Reference for EIA studies | | | Essential Detail Sought: |
|---|
| Sno. | EDS Letter | Remarks | Date of EDS |
|---|
| 1. | NA | The correction have been made as per the instruction received | 20 Sep 2019 | | 2. | NA | As per the information submitted in the Form-1, the project is for expansion, however, the category mentioned in Form-1 is ‘NEW’. Kindly clarify the same and submit revised Form-1. | 09 Sep 2019 | | | Additional Detail Sought : NIL | | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | | V.(i) | | Name of Applicant | Sachin | | Designation | LeadHSEF | | Name of Company (Applicant Name should not be given here) | COVIVA ENERGY TERMINALS LIMITED | | Address | Khambhalia, Post Box No.24, District Devbhumi Dwarka |
|
|