S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Implementation of BGR INDMAX project associated with BGR crude processing capacity enhancement from 2.35 to 2.7 MMTPA, DHDT capacity enhancement from 1.2 to 1.8 MMTPA, CRU-MSQ revamp & implementation of SDS unit
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/AS/IND/30345/2015
Project Cost 342540 lacs
2.
S. No. in the schedule4(a) Petroleum refining industry
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Indmax-740 TMTPA, Crude capacity-2.7 MMTPA, DHDT capacity - 1.8 MMTPA ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. a ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectBongaigaon Refinery
Shape of the project landStrip
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Revenue survey no. 450
Town / VillageDhaligaon
State of the projectAssam
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)AssamBongaigaonSidli (PT-II)
10.
Nearest railway station along with distance in kms New Bongaigaon, 8 km
Nearest airport along with distance in kms LGB Airport, Guwahati, 180 km
11. Nearest Town/City/District Headquarters along with distance in kms Kajalgaon , 4 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given)
13. Name of the Applicant Anil
14. Registered Address Bongaigaon Refinery, P.O.- Dhaligaon
15.
Address for correspondance:
Name of the Company INDIAN OIL CORPORATION BONGAIGAON REFINERY
Name of the Applicant Anil
Designation (Owner/ Partner/ CEO) Chief Manager (HSE) I/c
Pin code 783385
E-mail ak_agarwal@indianoil.in
Telephone No. 03664-253522
Fax No. 03664-241254
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No No new land acquisition is required. Project shall be implemented within existing complex of Bongaigaon Refinery.
1.2 Clearance of existing land, vegetation and buildings? No
1.3 Creation of new land uses? No
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Soil testing done in September 2006 alongwith DHDT project
1.5 Construction works? Yes Erection of equipment
1.6 Demolition works? No
1.7 Temporary sites used for construction works or housing of construction workers? Yes As required in project layout for erection of equipment like columns, vessels pumps etc.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes As required in project layout for erection of equipment like columns, vessels pumps etc.
1.9 Underground works including mining or tunnelling? No
1.10 Reclamation works? No
1.11 Dredging? No
1.12 Offshore structures? No
1.13 Production and manufacturing processes? Yes Manufacturing details enclosed as Annexure-1
1.14 Facilities for storage of goods or materials? Yes For storage of goods/materials, full fledged Stores / Warehouse including storage tanks/spheres for liquid feed & products are available in the refinery. However, depending upon the detailed engineering, 1 or 2 feed/product storage tanks/spheres may be required to take care of M&I activities of the Units.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? No Effluent generated shall be treated in existing Waste Water Treatment Plant (WWTP). Solid waste will be disposed in accordance with the Hazardous Waste (Management & Handling Rules, 1989 amended till date)
1.16 Facilities for long term housing of operational workers? No No new housing facilities required as the units will be operated by the present workforce and housing facilities for the present workforce adequately available in the existing refinery township.
1.17 New road, rail or sea traffic during construction or operation? No The existing facilities will be adequate. Additional infrastructure facilities such as railway siding, pipeline for dispatch of products are not required.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No The existing facilities will be adequate. Additional infrastructure facilities such as railway siding, pipeline for dispatch of products are not required.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not required
1.20 New or diverted transmission lines or pipelines? No Not required
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not required
1.22 Stream crossings? No Not required
1.23 Abstraction or transfers of water from ground or surface waters? No Temporarily during construction phase, this shall be made available from existing service water system.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No -
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Existing road / rail facilities will be availed
1.26 Long-term dismantling or decommissioning or restoration works? No Not required
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not required
1.28 Influx of people to an area in either temporarily or permanently? No Mainly labor force will come temporarily during construction period.
1.29 Introduction of alien species? No No change is anticipated
1.30 Loss of native species or genetic diversity? No No change is anticipated
1.31 Any other actions? No -
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Existing refinery land within the boundary walls
2.2 Water (expected source & competing users) unit: KLD Yes After reuse of treated water from ETP, raw water consumption will be marginal which will be supplied from the existing facilities. Source of raw water is ground water.
2.3 Minerals (MT) No No fresh input of raw material. Feed will be made available from existing intermediate refinery streams.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Local contractors / supplies will supply the construction materials i.e. stone, aggregates etc. from standard sources (hilly river bed). Quantity can be known only after detailed engineering.
2.5 Forests and timber (source – MT) No -
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Will be met from existing CPP/GTG
2.7 Any other natural resources (use appropriate standard units) No -
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No -
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No -
3.3 Affect the welfare of people e.g. by changing living conditions? No Not anticipated since there is no change in land use pattern by this project.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No -
3.5 Any other causes No -
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No -
4.2 Municipal waste (domestic and or commercial wastes) No -
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Except spent catalysts, no other solid waste will be generated in the unit. Spent catalysts shall be disposed to CPCB registered recyclers.
4.4 Other industrial process wastes No -
4.5 Surplus product No -
4.6 Sewage sludge or other sludge from effluent treatment No -
4.7 Construction or demolition wastes Yes Inert construction wastes will be used for land filling. Other construction wastes will be disposed of as per applicable rules.
4.8 Redundant machinery or equipment No -
4.9 Contaminated soils or other materials No -
4.10 Agricultural wastes No -
4.11 Other solid wastes No No other solid waste is anticipated
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes SO2 and NOx emission will be well within the CPCB guidelines – the exact quantity will be known only after Process Package is prepared.
5.2 Emissions from production processes Yes Fugitive emission is a possibility. Necessary measures will be taken in the EMP.
5.3 Emissions from materials handling including storage or transport Yes Preliminary estimate of emissions from Storage & Loading facilities are: CH4 : 0.07 Kg/hr VOC : 1.43 Kg/hr However, emissions will be re-estimated during EIA studies and measures will be taken to mitigate the fugitive loss during design stage itself.
5.4 Emissions from construction activities including plant and equipment Yes Insignificant
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Marginal dust emission, not quantifiable
5.6 Emissions from incineration of waste No -
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No -
5.8 Emissions from any other sources No -
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise from rotary equipment, shall be within permissible limit. Acoustic measures will be taken to control the noise in order to keep noise level within permissible limit.
6.2 From industrial or similar processes Yes Within the permissible limit
6.3 From construction or demolition Yes Within the permissible limit during construction period.
6.4 From blasting or piling Yes Noise will be during piling. Exposure shall be reduced by use of PPE at site.
6.5 From construction or operational traffic Yes Within the permissible limit
6.6 From lighting or cooling systems Yes Insignificant
6.7 From any other sources No -
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Not anticipated. However necessary precautions/ measures shall be taken as per MSDS. In case of spillage controlled mitigation measures shall be adopted.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Refinery is having full fledged effluent treatment plant for treatment of industrial and domestic (from township) effluent. More than 90% of the treated effluent is reused in process make-up. A small amount of treated effluent well below the permissible maximum limit of impurities is discharged to the Tunia river.
7.3 By deposition of pollutants emitted to air into the land or into water No -
7.4 From any other sources No -
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No -
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Handling of petroleum product is hazardous. However, Risk Analysis will be carried out for the proposed project.
8.2 From any other causes No -
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes The proposed facilities are coming up within the refinery premises. BRPL is in operation for more than last 25 years and no such natural disaster was faced so far. However, all structures shall be erected considering Seismic-V region. For other disasters situations “On-site & Off-site Disaster Management Plan” is in place and is periodically reviewed.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No -
9.2 Lead to after-use of the site, which could have an impact on the environment No -
9.3 Set a precedent for later developments No -
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No -
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Nakatti R.F. - 7.5 km, Kokaijana R.F. - 9.5 km, Bhumeswar R.F. - 7.8 km
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Rivers: Aie (6.0 km), Tunia (4.0 km) & Kujia (7.0 km) Lakes: Bhosamari (9.2 km), Paropota (9.5 km), Naodora (9.2 km), Kasorani (9.2 km) & Nayachara (7.0 km)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Kokaijana R.F. - 9.5 km Nayachara Lake (Beel) - 7.0 km
4 Inland, coastal, marine or underground waters Yes Proposed projects will be installed within the boundary wall of the existing refinery. However, EIA will be carried out for the same.
5 State, National boundaries Yes Assam
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes NH 31C - 0.7 km Railway line - 5 km
7 Defence installations No
8 Densely populated or built-up area Yes Chirang : Sidli Sirang CD block & IOCL BGR Township Bongaigaon : Bongaigaon CD block, Bongaigaon Municipal Area & Bongaigaon Railway Colony
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Health facilities: Hospitals – 15 Nos Dispensary – 21 Nos Family welfare centre – 6 Nos CHC – 4 Nos PHC – Block- 6 & Mini -16 Sub-Centre FW – 117 Blood Bank – 1 No Schools: Primary school – 970 Nos Middle English Vernicular school – 261 Nos High School – 114 Nos Higher Sec. school – 17 Nos College – 10 Nos ITI - 1 No Girl Polytechnic – 1 No B. Ed. College – 1 No DIET - 1 No
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes 1. Bhumeswar reserved forest 2. Nakatti reserved forest 3. Kokaijana reserved forest
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No -
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes Area falls under seismic Zone-5 of earthquake hazard classification and accordingly measures will be taken during design of buildings & structures. For other natural hazards “On-site & Off-site Disaster Management Plan” is in place and is periodically reviewed.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAkindly apply to industry 2 sector for further consideration of proposal 29 Oct 2015
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantAnil
DesignationChief Manager (HSE) I/c
Name of Company (Applicant Name should not be given here)INDIAN OIL CORPORATION BONGAIGAON REFINERY
AddressBongaigaon Refinery, P.O.- Dhaligaon