| APPENDIX I | | (See Paragraph-6) | | FORM 1 | | | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | No |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| | 1. | |
| Name of the Project/s | Development of Greenfield non-major Port at Machilipatnam in Krishna District of Andhra Pradesh State | Brief summary of project | Annexure-Brief summary of project | | Proposal Number | IA/AP/MIS/177730/2020 | | Project Cost | 10422 cr | |
| | 2. | |
| S. No. in the schedule | 7(e) Ports, Harbours
| Project Sector | INFRA-2 | |
| | 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Proposed Cargo Facility - 115.97 MTPA ha. | | | 4. | | New/Expansion/Modernization | New | | | | 5. | Existing Capacity/Area etc. | 0 ha. | | | 6. | Category of project i.e. 'A' or 'B' | A | | | 7. | | Does it attract the general condition? If yes, please specify | No | | | | 8. | | Does it attract the specific condition? If yes, please specify | No | | | | 9. | |
| Location of the project | Machilipatnam | | Shape of the project land | Block (Polygon) | | Uploaded GPS file | Annexure-GPS file  | | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | | Plot/Survey/Khasra No. | Government area | | Town / Village | Manginapudi, Tavisipudi, Gopuvanipalem, Chilakalapudi, Pothepalli, Karagraharam | | State of the project | Andhra Pradesh | |
| | Details of State of the project |
|---|
| S.no | State Name | District Name | Tehsil Name |
|---|
| NIL | | | 10. | |
| Nearest railway station along with distance in kms | Pedana Railway Station, 5.8 km | Nearest airport along with distance in kms | Vijayawada International Airport, 65 km | |
| | 11. | Nearest Town/City/District Headquarters along with distance in kms | Machilipatnam , 12 km | | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Manginapudi Village Panchayat, Tavisipudi Village Panchayat, Gopuvanipalem Village Panchayat, Chilakalapudi Village Panchayat, Pothepalli Village Panchayat, KaragraharamVillage Panchayat,
Machilipatnam Mandal,
Krishna District,AP | | | 13. | Name of the Applicant | RamakrishnaReddy | | | 14. | Registered Address | APMB, Port Administration Building, Beach Road, Kakinada, Andhra Pradesh | | | 15. | |
| Address for correspondance: | | Name of the Company | ANDHRA PRADESH MARITIME BOARD | | Name of the Applicant | RamakrishnaReddy | | Designation (Owner/ Partner/ CEO) | CEO | | Pin code | 533007 | | E-mail | machilipatnamapmbport@gmail.com | | Telephone No. | - | | Fax No. | - | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| | 16. | | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | Yes | | Uploaded details | Annexure-Uploaded details | |
| | 17. | Whether part of Interlinked projects? | No | | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | | 19. | | If Yes, MoEF file number | N/A | | Date of submission | N/A | | | | | | 21. | | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | Yes | | | | | 23. | | Whether any Forest Land Involved? | No | | Area of Forest land Involved (hectares) | N/A | |
| | 24. | | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | Yes | | (a) Name of the Court | High Courts | | (b) Name of the Sub court | Andhra Pradesh | | (c) Case No. | W.P.No.12980 | | (d) Orders/directions of the court, if any and relevance with the proposed project | Consequent to cancellation of concession agreement by AP Government vide G.O. Ms.No. 66, I,I,I&C Dept. 08.08.2019, M/s. MPL field W.P. No. 12980 of 2019 in the Honorable High Court of Andhra Pradesh to squash A.P. Government decision to cancel the concession agreement entered with M/s MPL, but Honorable High Court pleased to provide relief to GoAP passing an interim order on 01.10.2019 as “pending further orders, tender process if any undertaken, may go on but the same shall not be finalized. | |
| | 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | Present land will be changed into Port development area. | | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Clearances of land, bushes are involved. However, leveling of land as per requirement will be carried out. | | 1.3 | Creation of new land uses? | Yes | Development of Port Facilities | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Oceanographic data such as wave characteristics (significant wave height, period, direction), tidal data is generated through model studies. Bathymetry Chart is available. Geo technical investigations were carried out. | | 1.5 | Construction works? | Yes | Construction of breakwaters, berthing wharf and other port back up facilities, roads and railway line connecting to port. | | 1.6 | Demolition works? | No | Not Applicable | | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | Temporary sheds will be constructed for labourers during construction phase with all amenities such as water supply, fuel, sanitation etc., will be provided. | | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Admin building, ware houses, sub-stations, workshops and other required facilities for loading and unloading operation will be provided. | | 1.9 | Underground works including mining or tunnelling? | No | Not Applicable | | 1.10 | Reclamation works? | Yes | Back up area will be raised by reclamation. Dredge disposal yard within the port limits will be made. | | 1.11 | Dredging? | Yes | Dredging in the harbour, entrance and approach channels, dumping of dredged spoil for reclamation / shore nourishment and offshore dumping.
Phase -1 = 45.062Mm3
Phase- 2 = 4.066Mm3
Phase -3 = 4.066Mm3
Phase -4 = 3.165Mm3 | | 1.12 | Offshore structures? | Yes | Layout of the port is attached for Development of Machilipatnam Port | | 1.13 | Production and manufacturing processes? | No | Not applicable | | 1.14 | Facilities for storage of goods or materials? | Yes | Storage yard will be provided. | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Solid waste generated shall be disposed in the pre-identified dumping ground by the municipal authorities. ETP of appropriate capacity shall be setup for treating liquid effluents generated from the port facilities. | | 1.16 | Facilities for long term housing of operational workers? | Yes | Separate area shall be allocated within the port vicinity. | | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | Reconnaissance survey for new road and railway line will be carried out. Additional road traffic on existing roads due to transport of men and materials during construction and operational stage.
Detailed in | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | Yes | New road and railway connection to the port will be laid. | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | Yes | New road and railway connection from the existing route to the port will be developed. | | 1.20 | New or diverted transmission lines or pipelines? | Yes | New power transmission lines exclusively for port will be made. | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | Yes | Breakwater and wharf will be constructed. | | 1.22 | Stream crossings? | No | Not applicable | | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Potable water will be sourced from Tarakaturupalem/ Pambula Cheruvu reservoir. | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Natural drainage provided in the backup area development. | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Construction material will be transported through trucks during construction phase.
During operation phase materials will be transported by trucksand ships. | | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | During construction stage, stay of construction labourers is expected on a temporary basis. During operati
on stage, port employees are expected to stay on a permanent basis. | | 1.29 | Introduction of alien species? | No | Not Applicable | | 1.30 | Loss of native species or genetic diversity? | No | Not Applicable | | 1.31 | Any other actions? | No | Not Applicable | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Land will be utilized for development of Port facilities. | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Water will be required during construction phase. Water requirement will be met through external agencies. The required quantity will be detailed in the EIA report | | 2.3 | Minerals (MT) | Yes | During operation phase coal, iron ore etc., will be handled. | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Materials like sand, gravel, cement will be procured from nearby licensed sources/ reputed manufacturers as per requirement and availability. | | 2.5 | Forests and timber (source – MT) | No | It is not expected the usage of timber in port construction | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | The power requirement will be detailed in the EIA report. | | 2.7 | Any other natural resources (use appropriate standard units) | Yes | Petroleum, Oil and lubricants shall be used for operation of construction machineries/equipments | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | No such substances shall be used | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Not Applicable | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | | 3.5 | Any other causes | No | Not Applicable | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | Yes | Dredge spoil will be used for reclamation. | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Generated waste will be treated / disposed as per Solid Waste Management Rule 2016. | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | Used/ waste oil and lubricants will be expected to generate during construction phase will be disposed off through authorized vendors. | | 4.4 | Other industrial process wastes | No | Not Applicable | | 4.5 | Surplus product | No | Not Applicable | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Negligible quantity of sludge is expected, which shall be used as manure for the horticulture/ plantations in the green belt area | | 4.7 | Construction or demolition wastes | Yes | C&D waste will be disposed as per C&D Rule 2016. | | 4.8 | Redundant machinery or equipment | No | Not Applicable | | 4.9 | Contaminated soils or other materials | No | Not Applicable | | 4.10 | Agricultural wastes | No | Not Applicable | | 4.11 | Other solid wastes | No | Not Applicable | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Emission from vehicles, machines during construction phase will be envisaged. Vehicles having valid PUC will be used. | | 5.2 | Emissions from production processes | No | Not Applicable | | 5.3 | Emissions from materials handling including storage or transport | Yes | Emission from ships, vehicles during transportation and operational phase will be envisaged. | | 5.4 | Emissions from construction activities including plant and equipment | Yes | Vehicular and Machinery emission is expected. | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust can be generated from handling and storage of open bulk cargo. Water sprinkling will be done and providing cover and wind fencing. Sewage will be collected in septic soak pit system or treated in portable STP. | | 5.6 | Emissions from incineration of waste | No | Not Applicable | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not Applicable | | 5.8 | Emissions from any other sources | No | Not Applicable | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Sophisticated equipment will be used. | | 6.2 | From industrial or similar processes | No | Not Applicable | | 6.3 | From construction or demolition | Yes | Sophisticated equipment will be used. Noise enclosure will be provided. | | 6.4 | From blasting or piling | No | No blasting.
Piling of jetties and wharfs will be carried out undercontrolled manner. Efficient and latest piling technique will be used for keeping the noise level within Noise Standards. | | 6.5 | From construction or operational traffic | Yes | Truck movement will be involved during construction.
Care will be taken to control the noise levels within the standards and necessary mitigation measures will be followed. | | 6.6 | From lighting or cooling systems | No | Not Applicable | | 6.7 | From any other sources | No | Not Applicable | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Not Applicable | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Not Applicable | | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Not Applicable | | 7.4 | From any other sources | No | Not Applicable | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not Applicable | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Oil spill contingency plan will be evaluated to handle accidental Oil spill. Oil spill contingency team headed by a trained expert in coordination with National Oil Spill Committee headed by Indian Navy will be established at the port. Same will be incorporate in EIA report | | 8.2 | From any other causes | Yes | To avoid accidental spillage of material into the sea, the entire operation is carried out in a controlled manner with proper equipment. Proper mechanized loading and unloading operation will be installed. | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | Site falls under the seismic intensity Zone III, which is classified as Moderate Damage Risk Zone. Thus, suitable seismic coefficients shall be adopted while designing the structures to make it earthquake resistant. Adequate safety measures will be adopted as per standards. | | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | After implementation of this project the connectivity in the project area will be improved, this will result in better infrastructure facilities in the project region. This in turn will pave way for economic development of the region. | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not Applicable | | 9.3 | Set a precedent for later developments | No | Not Applicable | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not Applicable | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | None within the study area | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | The proposed project is within Coastal Zone area | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | None within the study area | | 4 | Inland, coastal, marine or underground waters | Yes | The proposed project is within Coastal Zone area | | 5 | State, National boundaries | No | None within the study area | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | None within the study area | | 7 | Defence installations | No | None within the study area | | 8 | Densely populated or built-up area | Yes | Machilipatnam | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Machilipatnam | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Agriculture and fishery are major activities in the nearby villages | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | None within the project area | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | Yes | Project location falls under Seismic Zone III as per IS 1983 (Part I): 2016.
The project location is a cyclone prone area. | | | (IV) | Proposed Terms of Reference for EIA studies | | | | Additional Attachments, if any |
|---|
| Attached File |
|---|
| ADS Letter |
| | | Essential Detail Sought : NIL | | | Additional Detail Sought: |
|---|
| Sno. | ADS Letter | Remarks | Date of ADS |
|---|
| 1. | ADS Reply Letter | As there is provision for only uploading PDF file, the KML files were circulated to the members through mail.
Rest all the information is provided in the uploaded PDF file.
Kindly request you to consider the proposal for next EAC Meeting | 05 Jan 2021 | | 2. | NA | The EAC, taking into account the submission made by the project proponent for the aforementioned proposal had a detailed deliberation during its 247th meeting on 23rd –24th November, 2020 and deferred the proposal for the requirement of the following information for further consideration:i.KML file for all major ports along the statescoast line
30ii.KML file for the proposed port vis-à-visKML file for bhavanapadu port.iii.KML file for the 3 alternate sites and Commercial viability of the port. iv.Details on Ministry of Port’s approval for the pro | 05 Dec 2020 | | | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | | V.(i) | | Name of Applicant | RamakrishnaReddy | | Designation | CEO | | Name of Company (Applicant Name should not be given here) | ANDHRA PRADESH MARITIME BOARD | | Address | APMB, Port Administration Building, Beach Road, Kakinada, Andhra Pradesh |
|
|