Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Grain Based Distillery Capacity 100 KLD Fuel Ethanol along with 3.0 MW Co-Gen Power Plant at Village: Rayanwali, Tehsil: Suratgarh District: Ganganagar, State: Rajasthan
(b)Name of the Company / Organisation PROGRESSIVE BIOENERGY PRIVATE LIMITED
(c)Registered Address 302, EROS Apartment, 56, Nehru Place, ,,South,Delhi-110019
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mohit Aggarwal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 302, EROS Apartment, 56, Nehru Place, ,,,South,Delhi-110019
(d)Pin code 110019
(e)E-mail pcpb931@gmail.com
(f)STD Code. 0(f)Telephone No.
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5g(a)-Grain Based distilleries for Ethanol Blended Petrol
Minor Activity
(b)Category B2
   Reason for Applying at Ministry Select
Zero Liqued Discharged Yes
(c)Proposal Number IA/RJ/IND2/279353/2022
(d)Master Proposal Number(Single Window) SW/178638/2020
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 238/55 & 239/55
(b)Pincode 335804
(c)Bounded Latitudes (North)
From
Degree 29
Minutes 11
Second 29.38
From
Degree 29
Minutes 11
Second 46.02
(d)Bounded Longitudes (East)
From
Degree 73
Minutes 55
Second 13.7
From
Degree 73
Minutes 55
Second 26.07
(e)Survey of India Topo Sheet No. H43N16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 201
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanSri GanganagarSuratgarhRayanwali
6.
Details of Project Configuration/Product:
     6.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Grain Based Distillery100 KLPDFuel Ethanol
(2.)Co-Gen Power Plant3.0 MWCPP
     6.2.       Product
S. No.Product/Activity (Capacity)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Fuel Ethanol100Kilo Litre per DayRoad
(2.)Power3.0OthersMWOthersPower Line
(3.)CO278OthersTPDRoad
(4.)DDGS46OthersTPDRoad
7.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
7.1.
Details of CTE
(i)Whether CTE obtained ? NA
(ii)Copies of all CTE obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of CTE valid as on date NA
7.2.
Details of Consent to Operate
(iii)Date of Issue 01-01-1900 00:00:00
(iv)Valid Upto 01-01-1900 00:00:00
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
8.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 138.15
(b) Funds Allocated for Environment Management (Capital) (in Crores) 13.95
(c) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 30
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? -1
    9.        Raw Material / Fuel Profile
S. No.Type Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)
(1.)NewGrain (Damaged Food Grains such as broken rice, wheat, corn, sorghum, and millets) TPD93390Tons per Annumnearby AreaRoad500
(2.)Newanti foam agent48Tons per AnnumNearby areaRoad300
(3.)Newbio fuel as rice husk/bagasse79200Tons per AnnumNearby areaRoad500
(4.)NewEnzyme63Tons per Annumnearby AreaRoad300
     10.      Details of Water Requirement
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater4330.05Copy of Permission LetterPipelineTube Well21-4/1160/MP/IND/202104 May 2022475
11.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    11.1.       Waste Water Management
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Quantity of Treated water & Resives or Recycle (Kilolitre per Day)Mode of DisposalZLD Plan Letter
(1.)Industrial431500431ZLD Copy of ZLD Plan
    12.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.5Kilolitre100RoadAuthorized Recyclers
(2.)AshFly Ash11220Tons0.05OthersInhouse UseOthersin house
13.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3000
(b)Source Co-gen Power Plant
(c)Standby Arrangement (Details of DG Sets) Yes
(d)Stack Height (in m) 30
14.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 10.35
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 10.35
15.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 5980.24
(b)Waste/Barren Land (ha.) 20776.37
(c)Grazing/ Community Land (ha.) 2309.93
(d)Surface Water Bodies (ha.) 221.44
(e)Settlements (ha.) 2118.06
(f)Industrial (ha.) 10.35
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0
    Total (ha.) 31416.3900
16.
Details of Ecological & Environmental Sensitivity : -
    16.1.     Details of Ecological Sensitivity : Select
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
NIL
    16.2.     Details of Environmental Sensitivity : Select
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
NIL
17.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
18.
Forest Land:
Whether any Forest Land involved? No
19.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
20.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.35
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired completed
21.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
22.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
23.
Manpower Requirement:
(a)Permanent Employment 80
(b)Temporary /Contractual Employment 50
(c)Total Manpower 130
(d)No. of working days 330
24.
Green Belt in Ha:
(a)Total Area of Green Belt 3.44
(b)Percentage of Total Project Area 33.24
(c)No. of Plants to be Planted 8600
(d)Funds Allocated for Plantation 40
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    25.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project will generate direct and indirect employment
   27.   CRZ Specific Details : Not Applicable
   28.   Sector Specific Details : NOT APPLICABLE
   30.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
30.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
31.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
32.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/IA0061
(ii)Name of the EIA Consultant AmplEnviron Pvt. Ltd.
(iii)Address Hyderabad
(iv)Mobile No. 7983037443
(v)Landline No. 7983037443
(vi)Email Id amplenviron@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 22 Oct 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
33.
Documents to be Attached:
(a)Uploaded Copy of EMP Report Copy of EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
Uploaded Scanned copy of notarized affidavit (self declaration as mentioned in the Notification dated 16.06.2021). Copy of Uploaded Scanned copy of notarized affidavit
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
Uploaded Scanned copy of notarized affidavit (self declaration as mentioned in the Notification dated 16.06.2021). Copy of Uploaded Scanned copy of notarized affidavit
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease submit Copy of Land use conversion certificate for industrial use. 30 Jun 2022
2.NAThe correction have been made as per the instruction received 08 Jul 2022
3.NAPl. comply EDS dated 30th June, 2022. 19 Jul 2022
4.NAThe correction have been made as per the instruction received 30 Jul 2022
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS LetterRespected Sir, We are submitting herewith Additional Information asked by Hon'ble MOEFCC 17 Aug 2022
2.NA

The Committee noted that the EMP report of the said project has been prepared by accredited Consultant M/s. AmplEnviron Pvt. Ltd. (NABET Certificate No. NABET/EIA/2023/IA0061 and validity 22nd October, 2023). However, as per information received by QCI-NABET, “the approval of Sh. Vipin Kumar as FAE/EC, shall be suspended for a period of 6 months from the date of NABET communication”. EAC observed that Mr. Vipin Kumar joined the meeting for presenting the proposal as EIA co-ordinator which is not in line with the recent direction of the QCI-NABET. Thereafter, EAC suggested that the accredited environmental organization (ACO) shall authorize an accredited person for 5(ga) category or PP shall authorize another accredited consultant for presenting the proposal before EAC for further consideration.

 

Accordingly, proposal was deferred due to above reasons. Above information shall be submitted online to the PARIVESH portal for further consideration by EAC.

16 Aug 2022
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMohit Aggarwal
DesignationDirector
Name of Company (Applicant Name should not be given here)PROGRESSIVE BIOENERGY PRIVATE LIMITED
Address302, EROS Apartment, 56, Nehru Place,