Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed to manufacture Bulk Drugs & Drug Intermediates by Vidgas Science & Technologies Pvt. Ltd.
(b)Name of the Company / Organisation VIDGAS SCIENCE & TECHNOLOGIES PVT. LTD.
(c)Registered Address Plot No. 290, Kadechur Industria Area, Kadechur Village,,Yadgir,Karnataka-585221
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant SudarsanaReddy G
(b)Designation (Owner/ Partner/ CEO) ManagingDirector
(c)Address Plot No. 290, Kadechur Industrial Area, Kadechur Village,,Yadgir,Yadgir,Karnataka-585221
(d)Pin code 585221
(e)E-mail vidgassciencetechnologiespl@gmail.com
(f)STD Code. 0(f)Telephone No.
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category B1
   Reason for Applying at Ministry general
(c)Proposal Number IA/KA/IND3/217809/2021
(d)Master Proposal Number(Single Window) SW/217805/2021
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 290
(b)Pincode 585221
(c)Bounded Latitudes (North)
From
Degree 16
Minutes 31
Second 12.99
From
Degree 16
Minutes 31
Second 17.58
(d)Bounded Longitudes (East)
From
Degree 77
Minutes 18
Second 12.04
From
Degree 77
Minutes 18
Second 21.34
(e)Survey of India Topo Sheet No. 56 H/2, 3, 6 & 7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 369
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7.82
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/198/2021-IA-II (I)
(b)Date of Apply of TOR 11 May 2021
(c)Date of Issue of TOR / Standard ToR 19 May 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The proposed project located in a KIADB Industrial area notified by the Govt. of Karnataka
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Thermic Fluid Heater1 x 2.0 Lakh K.Cal/HrProposed
(2.)Coal/ Biomass Briquette fired boiler1 x 2.0 TPH & 1 X 3.0 TPHProposed
(3.)D. G. Sets1 x 250 kVA & 1 x 380 kVAProposed
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)5-Amino-2-Methyl-Benzene sulfonamide1.0OthersTons/ MonthRoad
(2.)6-Bromo-2-Chloro-8-Cyclopentyl-5-Methyl-8h-Pyrido[2,3-D] Pyrimidin-7-One0.5OthersTons/ MonthRoad
(3.)Allopurinol2.0OthersTons/ MonthRoad
(4.)Ethyl 4-(2-Hydroxypropan-2-Yl)-2-Propyl-1h-Imidazole-5-Carboxylate1.0OthersTons/ MonthRoad
(5.)Teneligliptin2.0OthersTons/ MonthRoad
(6.)Fedratinib1.0OthersTons/ MonthRoad
(7.)3-Methyl-6-Nitro-1h-Indazole1.0OthersTons/ MonthRoad
(8.)Latanoprost0.25OthersTons/ MonthRoad
(9.)Tert-Butyl 4-[6-(6-Bromo-8-Cyclopentyl-5-Methyl-7-Oxo-7,8-Dihydro-Pyrido[2,3-D] Pyrimidin-2-Ylamino)-Pyridin-3-Yl]-Piperazine-1-Carboxylic Acid Ester1.0OthersTons/ MonthRoad
(10.)Bortezomib0.03OthersTons/ MonthRoad
(11.)Sodium Bromide (After neutralization of HBr with Caustic Lye solution) [By-Product]103.00OthersKg/ DayRoad
(12.)(5-Bromo-2-Chloro-Pyrimidin-4-Yl)-Cyclopentyl-Amine)0.60OthersTons/ MonthRoad
(13.)2,4-Dichloro-Pyrimidine1.0OthersTons/ MonthRoad
(14.)2-Chloro-8-Cyclopentyl-5-Methyl-8h-Pyrido[2,3-D]Pyrimidin-7-One0.5OthersTons/ MonthRoad
(15.)Apixaban1.0OthersTons/ MonthRoad
(16.)Bimatoprost0.25OthersTons/ MonthRoad
(17.)Brivaracetam1.0OthersTons/ MonthRoad
(18.)(Ibrutinib Intermediate) 3-(4-Phenoxy-Phenyl)-1h-Pyrazolo [3,4-D] Pyrimidin-4-Ylamine1.0OthersTons/ MonthRoad
(19.)Tofacitinib Citrate0.1OthersTons/ MonthRoad
(20.)Acalabrutinib1.0OthersTons/ MonthRoad
(21.)Rivaroxaban1.0OthersTons/ MonthRoad
(22.)2,3-Dimethyl-2h-Indazol -6-Amine Hydrochloride1.0OthersTons/ MonthRoad
(23.)Carboprost0.25OthersTons/ MonthRoad
(24.)Guggulosterone1.0OthersTons/ MonthRoad
(25.)Ivacaftor1.0OthersTons/ MonthRoad
(26.)N-(2-Chloropyrimidin-4-Yl)-2,3-Dimethyl-2h-Indazol-6-Amine1.0OthersTons/ MonthRoad
(27.)Tert Butyl 4-(6-Aminopyridin-3-Yl) Piperazine-1-Carboxylate1.0OthersTons/ MonthRoad
(28.)Trityl Olmesartan Medoxomil1.0OthersTons/ MonthRoad
(29.)Vildagliptin2.0OthersTons/ MonthRoad
(30.)Osimertinib1.0OthersTons/ MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 18.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.30
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.36
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.2
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2.0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 2
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Methanol2.0Tons per AnnumWithin the countryRoad10 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2021 To 31 May 2021
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube70.247.670.0100
(2.)PM2.5Micro Gram per Meter Cube28.918.628.860
(3.)SO2Micro Gram per Meter Cube17.68.217.580
(4.)NOxMicro Gram per Meter Cube22.99.622.880
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l112011800
(2.)Chloridesmg/l831.6688.0600
(3.)Fluoridemg/l1.060.8500
(4.)Heavy MetalsZinc as Znmg/l0.50.500
(5.)TSSmg/l0000
(6.)TDSmg/l257966600
(7.)pHNA8.117.0600
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l2010E
(2.)pHNA8.267.32E
(3.)DOmg/l5.75.3E
(4.)BODmg/l5.05.0E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.541.770
(2.)Leq(Day)A-weighted decibels(dB(A))54.251.775
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare156.15107.23
(2.)P(Phosphorus)Kilogram per hectare44.3626.20
(3.)K(Potassium)Kilogram per hectare261.94127.51
(4.)Electric ConductivityMillisiemens per Centimetre0.530.07
(5.)pH8.427.27
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 150 To 50
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 25
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersKIADB138.6010 Not Appliacble PipelineOthersPipeline14815 Jun 2021138.60
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial & Domestic30.300OthersCETP- Mother Earth, Kadechur030.3
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 30.3
(b)Total Discharged Water (Kilolitre per Day) 30.3
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Organic Solid WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)183.3Tons10RoadOthersWill be sent to Cement Industries
(2.)Solvent Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)51.3Tons10RoadOthersWill be sent to Cement Industries
(3.)Inorganic Solid WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)8.1Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)7.2Tons10RoadOthersWill be sent to Cement Industries
(5.)Used OilsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.13Kilolitre10RoadAuthorized Recyclers
(6.)Ash from boilersFly Ash1312.5Tons10RoadOthersWill be sent to Brick Manufacturers
(7.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12.0Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube62.60.60.2262.82100
(2.)SO2Microgram per Meter Cube12.60.60.8213.4280
(3.)PM2.5Microgram per Meter Cube24.10.60.0824.1860
(4.)NOxMicrogram per Meter Cube19.10.60.9520.0580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)2.0 TPH BoilerCoal/ Biomass Briquettes300.3OthersPM0.081
(2.)2.0 TPH BoilerCoal/ Biomass Briquettes300.3SO20.37
(3.)2 Lakh K.Cal/ Hr Thermic Fluid HeaterDiesel110.2OthersPM0.000056
(4.)3.0 TPH BoilerCoal/ Biomass Briquettes300.3OthersPM0.121
(5.)3.0 TPH BoilerCoal/ Biomass Briquettes300.3NOx1.141
(6.)2 Lakh K.Cal/ Hr Thermic Fluid HeaterDiesel110.2SO20.028
(7.)2 Lakh K.Cal/ Hr Thermic Fluid HeaterDiesel110.2NOx0.091
(8.)3.0 TPH BoilerCoal/ Biomass Briquettes300.3SO20.555
(9.)2.0 TPH BoilerCoal/ Biomass Briquettes300.3NOx0.761
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source Karnataka Power Corporation Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 x 250 kVA & 1x 380 kVA
(e)Stack Height (in m) 8.0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 4.047
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 4.047
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23110.4
(b)Waste/Barren Land (ha.) 2983.00
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2888.8
(e)Settlements (ha.) 1444.4
(f)Industrial (ha.) 973.4
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 31400.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant4.0470
Total (ha.) 4.047
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAs000
(2.)Critically Polluted Area000
(3.)WLS000
(4.)Corridors000
(5.)NPA000
(6.)ESZs000
(7.)Wildlife Corridors000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest000
(2.)Archaeological Sites000
(3.)Defence Installations000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.05
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bhima River
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 7.82
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.37
(b)Percentage of Total Project Area 33.85
(c)No. of Plants to be Planted 3420
(d)Funds Allocated for Plantation 1100000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be provided to the local people
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/SA 0128
(ii)Name of the EIA Consultant Rightsource Industrial Solutions Pvt. Ltd.
(iii)Address Plot No: 203, H. No:5-36/203, Prashanthi Nagar, IDA, Kukatpally, Hyderabad – 500072
(iv)Mobile No. 9885560011
(v)Landline No. 0402307060
(vi)Email Id info@rightsource.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 29 Oct 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSudarsanaReddy G
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)VIDGAS SCIENCE & TECHNOLOGIES PVT. LTD.
AddressPlot No. 290, Kadechur Industria Area, Kadechur Village
Print