| 1. | | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | Yes | | Details of Project: | | Type of Appraised | Select | | Details of Project: | | Type of Violation | Started the work onsite without prior EC under EIA notification,2006. | | Details of Violation | Violation to E(P) Act,1986 was identified as the mining was in operation without obtaining EC after the renewal fell due in 2007. | | Upload document of Damage Assessment Report | |
| Upload document of Remediation Plan and Natural & Community augmentation plan | | Upload TOR Letter(if issued earlier) | | Upload EC Letter(if issued earlier) | | Details of Project: | | (a)Name of the project(s) | Proposed 70,200 TPA of Limestone production including subgrade and OB from Putka Limestone Mine (MLA 97.031 Ha) of M/s Jyoti Pramanik located at Village-Putka,Tehsil- Jharbandh,Dist-Bargarh,Odisha. | | (b)Name of the Company / Organisation | PUTKA LIMESTONE MINES | | (c)Registered Address | Village- Putka,Tahasil-Jharbandh,Dist-Bargarh,Odisha,,Bargarh,Orissa-768604 | | (d)Legal Status of the Company | Private | | (e)Joint Venture | No | |
|
| 2. | | Address for the correspondence: | | (a)Name of the Applicant | Jyoti Pramanik | | (b)Designation (Owner/ Partner/ CEO) | Lessee | | (c)Address | At-Mission Road,Sambalpur,Odisha,768001,,Jharabandha,Bargarh,Orissa-768001 | | (d)Pin code | 768001 | | (e)E-mail | jyotipramanik2021@gmail.com | | (f)STD Code. | 674(f)Telephone No. | 2974059 | | (g)Fax No. | | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
| 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a.I)Project/Activity | 1(a) Mining of minerals
| | Minor Activity | | | (b)Category | A | | (c)Proposal Number | IA/OR/MIN/195617/2018 | | (d)Master Proposal Number(Single Window) | SW/195612/2021 | | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | | (f)Project Type | Fresh EC |
|
|
| 4. | | Location of the Project: | | (a)Plot/Survey/Khasra No. | Plot No. 24/P, 63/P, 64, 65/P, 66, 67, 68, 69, 70, | | (b)Pincode | 768042 | | (c)Bounded Latitudes (North) | | | From | | | Degree | 21.17 | | Minutes | | | Second | | | From | | | Degree | 21.18 | | Minutes | | | Second | | | (d)Bounded Longitudes (East) | | | From | | | Degree | 82.960 | | Minutes | | | Second | | | From | | | Degree | 82.966 | | Minutes | | | Second | | | (e)Survey of India Topo Sheet No. | 64K/16 | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | | (g)Maximum Elevation Above Means Sea Level(AMSL) | 126 | | (h)Uploaded (kml) File | Copy of Kml File  | | (i)Distance of Nearest HFL from the project boundary within the study area | 2 | | (j)Seismic Zone | 3 | |
|
| 5. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Orissa | |
|
|
| Details of State of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| NIL | |
|
| 6. | | Details of Terms of Reference (ToR): | | (a)MoEF&CC / SEIAA File Number | 23-151/2018-IA.III(V) | | (b)Date of Apply of TOR | 23 Nov 2018 | | (c)Date of Issue of TOR / Standard ToR | 24 Nov 2020 | | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
| 7. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | No | | (b)Whether details of Public Hearing available? | Yes | | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
| 7.1. Details of Public Hearing |
|---|
|
| S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
|---|
| (1.) | | | Copy of Public Hearing : | Copy of Public Hearing | | Date : | 04 Nov 2016 | | Distance of Public Hearing Venue from the Proposed Project : | 2 |
| At Putka Village Under Jharbandh block of Bargarh District | | State : | Orissa | | District : | Bargarh | | Tehsil : | Jharabandha | | Village : | Putka |
| 70 | Proposed Environmental measures to be taken before start of operation of mines
The mining activities have not upheld the economic status of nearby people | Others | Additional District Magistrate | |
| 8. | | Details of Project Configuration/Product: | |
|
| 8.1. Project Configuration |
|---|
| S. No. | Plant/Equipment/Facility | Configuration | Remarks |
|---|
| (1.) | Compressor | 300cfm | 1 nos | | (2.) | Excavator | 0.9m3 | 1 nos | | (3.) | Jack Hammer Drill | 32mm | 2 nos | | (4.) | Tippers | 10t | 2 nos | |
| 8.2. Product |
|---|
| S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
|---|
| (1.) | Limestone | 70200 | Tons per Annum | | Road,Rail | | |
|
| 9. | | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | | Details Not Applicable | |
|
| 9.1. | | Details of Consent to Operate | | (i)Whether Consent to operate obtained ? | NA | | (ii)Copies of all Consent to operate obtained since inception | NA | | (iii)Date of Issue | N/A | | (iv)Valid Upto | N/A | | (v)File No. | NA | | (vi)Application No. | NA | | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
| 10. | | Project Cost: | | (a)Total Cost of the Project at current price level (in Crores) | 10 | | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.5 | | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.285 | | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.1 | |
|
| 11. | | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
| 12. | | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
| 13. | | Raw Material / Fuel Requirement: | | (a)Proposed quantity of raw material/fuel | 0 | | (b)Existing quantity of raw material/fuel | N/A | | (c)Total quantity of raw material/fuel | 0 | |
|
|   13.1. Raw Material / Fuel Profile |
|---|
| S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
|---|
| (1.) | 0 | 0 | Others | NA | Nil | Others | nil | 0 | Others | Nil | Copy of Linkage | |
|
| 14. | | Baseline Data : | | (a)Period of Base Line Data Collection | FROM 01 Oct 2020 To 31 Dec 2020 | | (b)Season | Post-Monsoon | |
|
| 14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
|---|
| (1.) | PM10 | | Micro Gram per Meter Cube | 79.8 | 30.0 | 38.8 | 100 | | (2.) | PM2.5 | | Micro Gram per Meter Cube | 39.1 | 16.7 | 26 | 60 | | (3.) | SO2 | | Micro Gram per Meter Cube | 10.3 | 5.2 | 6.65 | 80 | | (4.) | NOx | | Micro Gram per Meter Cube | 28.3 | 9.4 | 10.45 | 80 | |
| 14.2. No. of Ground Water monitoring locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
|---|
| (1.) | Others | Hg | | mg/l | | 0.00 | 0.00 | 0.00 | 0.00 | | (2.) | Total Hardness | | | mg/l | | 192 | 120 | 200 | 600 | | (3.) | TDS | | | mg/l | | 480 | 220 | 500 | 2000 | | (4.) | Heavy Metals | | Pb | mg/l | | 0.00 | 0.00 | 0.00 | 0.00 | | (5.) | Fluoride | | | mg/l | | 0.55 | 0.25 | 1.0 | 1.5 | | (6.) | TSS | | | NA | | 0 | 0 | 0 | 0 | | (7.) | pH | | | NA | | 7.3 | 7.1 | 6.5 | 8.5 | | (8.) | Chlorides | | | mg/l | | 90 | 8 | 250 | 1000 | |
| 14.3. No. of Surface Water monitoring locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
|---|
| (1.) | COD | | mg/l | | 12 | 5.0 | C | | (2.) | Others | Total Hardness as CaCO3 | mg/l | | 120 | 76 | C | | (3.) | pH | | NA | | 7.9 | 7.4 | C | | (4.) | DO | | mg/l | | 6.9 | 5.9 | C | | (5.) | BOD | | mg/l | | 2.5 | 1.0 | C | |
| 14.4. No. of Ambient Noise monitoring locations : 8 |
|---|
| S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
|---|
| (1.) | Leq(Night) | A-weighted decibels(dB(A)) | 29.7 | 17.6 | 45 | | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 38.9 | 28.4 | 55 | |
| 14.5. No. of Soil Sample Monitored locations : 8 |
|---|
| S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
|---|
| (1.) | pH | | | 7.6 | 5.8 | | (2.) | N(Nitrogen) | Kilogram per hectare | | 263.6 | 113 | | (3.) | P(Phosphorus) | Kilogram per hectare | | 182.6 | 78.2 | | (4.) | K(Potassium) | Kilogram per hectare | | 268.8 | 94.1 | | (5.) | Electric Conductivity | Others | Micro Siemens per Centimetre | 315 | 90 | |
|
| 14.6. | | Details of Ground Water Table: | | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3 To 7 | | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12.6 To 6.9 | | (c)Whether Ground Water Intersection will be there ? | No | |
|
| 15. Details of Water Requirement (During Operation) |
|---|
| S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
|---|
| (1.) | GroundWater | | 25 | 2 | Copy of Permission Letter | Pipeline | | Others | Bore well | 5-22/SER/CGWA/2017-18-1036 | 21 Sep 2017 | 25 | |
|
| 15.1. | | (a)Whether Desalination is proposed | No | |
|
| 16. Waste Water Management(During Operation) |
|---|
| S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
|---|
| (1.) | Nil | 0 | 0 | Nil | Others | No waste water will be generated | 0 | 0 | |
|
| 16.1. | | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | | (b)Total Discharged Water (Kilolitre per Day) | 0 | | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
| 17. Solid Waste Generation/Management |
|---|
| S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
|---|
| (1.) | Mining Waste | Others | Mining Waste | 19988 | Tons | 2 | Road | | Others | Back filling in mining quarry | |
|
|
| 18.1. Air Quality Impact Prediction |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
|---|
| (1.) | PM10 | | Microgram per Meter Cube | 38.8 | 0.23 | 1.26 | 40.06 | 100 | | (2.) | PM2.5 | | Microgram per Meter Cube | 26 | 0.23 | 0 | 26 | 60 | | (3.) | SO2 | | Microgram per Meter Cube | 6.65 | 0.23 | 0 | 6.65 | 80 | | (4.) | NOx | | Microgram per Meter Cube | 10.45 | 0.23 | 0 | 10.45 | 80 | |
|
| 18.2. Stack Details |
|---|
| S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
|---|
| (1.) | Nil | 0 | 0 | 0 | Others | NA | 0 | |
|
| 19. | | Power Requirement: | | (a)Quantity (Kilo Volt Amps (kVA)) | 125 | | (b)Source | DG Set | | (c)Uploaded Copy of Agreement | Copy of Agreement | | (d)Standby Arrangement (Details of DG Sets) | 1 | | (e)Stack Height (in m) | 1.5 | |
|
| 20. | | Land Ownership Pattern: | | (a)Forest Land (ha.) | 0 | | (b)Private Land (ha.) | 0 | | (c)Government Land (ha.) | 97.0310 | | (d)Revenue Land (ha.) | 0 | | (e)Other Land (ha.) | 0 | | Total Land (ha.) | 97.031 | |
|
| 21. | | Present Land Use Breakup of the Study Area in Ha: | | (a)Agriculture Area (ha.) | 61.747 | | (b)Waste/Barren Land (ha.) | 34.034 | | (c)Grazing/ Community Land (ha.) | 0 | | (d)Surface Water Bodies (ha.) | 0 | | (e)Settlements (ha.) | 0 | | (f)Industrial (ha.) | 0 | | (g)Forest (ha.) | 0 | | (h)Mangroves (ha.) | 0 | | (i)Marine Area (ha.) | 0 | | (j)Others (ha.) : Road | 1.25 | | Total (ha.) | 97.0310 | |
|
| 22. Land requirement for various activities |
|---|
| S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
|---|
| (1.) | Quarry Area | | 8.349 | -- | | (2.) | Green belt | | 5 | -- | | (3.) | OB Dump Area | | 2.010 | -- | | (4.) | Area for Solid Waste Management | | 0.578 | -- | | (5.) | Others | Other land uses | 81.094 | -- | |
|
|
| 23. | | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
| 23.1. Details of Ecological Sensitivity : |
|---|
| S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Critically Polluted Area | nil | 0 | No Critically Polluted area within 10 Km | | (2.) | NPA | nil | 0 | No NPA within 10 Km | | (3.) | Corridors | nil | 0 | No Corridors within 10 Km | | (4.) | Wildlife Corridors | nil | 0 | No Wildlife Corridors within 10 Km | | (5.) | WLS | nil | 0 | No WLS within 10 Km | | (6.) | ESZs | nil | 0 | No ESZs within 10 Km | | (7.) | ESAs | nil | 0 | No ESAs within 10 Km | |
| 23.2. Details of Environmental Sensitivity : |
|---|
| S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Forest | | Palsapali RF | 2 | Reserved Fortest | | (2.) | Others | Forest | Putka RF | 3 | Reserved Fortest | | (3.) | Defence Installations | | nil | 0 | nil | | (4.) | Archaeological Sites | | nil | 0 | nil | |
|
| 23.3. | | (a)Whether Noc / Permission from the competent authority is required? | No | | (b)Whether NBWL recommendation is required? | No | |
|
| 24. | | Forest Land: | | Whether any Forest Land involved? | No | |
|
| 25. | | Tree Cutting: | | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
| 26. | | Land Acquisition Status: | | (a)Acquired Land(Ha) | 97.03 | | (b)Land yet to be acquired(Ha) | 0 | | (c)Status of Land acquisition if not acquired | Already Acquired | |
|
| 27. | | Rehabilitation and Resettlement (R&R): | | (a)No. of Villages | | | (b)No. of Households | | | (c)No. of PDFs (Project Displaced Families) | | | (d)No. of PAFs (Project Affected Families) | | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | | (f)Status of R&R | NA | |
|
| 28. | | Details of Presence of Schedule-I Species: | | (a)Whether there is Presence of Schedule-I Species ? | No | | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
| 29. | | Details of Presence of Water Bodies in Core Area: | | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | | (i)Details of Water Bodies in Core Area | Murmuri nala flowing in SW boundary of lease area | | (b)Whether there is Diversion Required ? | No | | (c)Whether permission has been obtained from competent authority ? | No | |
|
| 30. | | Details of Presence of Water Bodies in Buffer Area: | | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | | (i)Details of Water Bodies in Buffer Area | Ong River | | (ii)Direction of Water Bodies in Buffer Area | South | | (iii)Distance of Water Bodies in Buffer Area | 5 | |
|
| 31. | | Manpower Requirement: | | (a)Permanent Employment-During Construction | 0 | | (b)Permanent Employment-During Operation | 60 | | (c)Temporary Employment- During Construction | 0 | | (d)Temporary Employment- During Operation | 0 | | (e)No. of working days | 300 | | (f)Total Manpower | 60 | |
|
| 32. | | Green Belt in Ha: | | (a)Total Area of Green Belt | 5 | | (b)Percentage of Total Project Area | 5.15 | | (c)No. of Plants to be Planted | 2500 | | (d)Funds Allocated for Plantation | 675000 | | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
| 33. Project Benefits |
|---|
| S. No. | Type of Project Benefits | Details of Project Benefits |
|---|
| (1.) | Environmental | Natural resource management,Damage assessment and greenbelt development | | (2.) | Social | Community augmentation and peripheral development | | (3.) | Financial | Employment generation | |
|
| 34. CRZ Specific Details : Not Applicable |
| 35. Sector Specific Details For Non-Coal Mining |
|
| 1. No. of Mineral(s) to be Mined : 1 |
|---|
| S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
|---|
| (1.) | Lime Stone | Major | |
|
| 2. | | Mine Capacity in ROM (Run of Mine) | 70200 | |
|
|
| 4. | | Mining Plan: | | (a)Approval Letter No. | MPN/OTFM/06-ORI/BHU/2016-17 | | (b)Date of Approval | 02 Sep 2016 | | (c)Approved Letter | Copy of Approved Letter | | (d)Approved By State Mining and Geology Department | IBM | | (e)Approved Mining Lease Area | 97.031 | | (f)Approved Capacity | 70200 | |
|
| 5. | | Technical Details: | | (a)Total Geological Reserves (Million Ton) | 1.495 | | (b)Mineable Reserves (Million Ton) | 1.44 | | (c)Extractable Reserves(Million Ton) | 1.44 | | (d)Percent(%) of Extraction | 95 | | (e)Grade of Coal /Ore /Mineral | 35% CaO | | (f)Stripping Ratio | 1 : 0.15 | | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | | (h)Average Gradient(Degree) | NA | | (i)Mining Method | Opencast | | (j)Life of Mine (Years) | 13 | |
|
| 6. | | Details of Beneficiations: | | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
| 7. | | Details of Seams: | | (a)Whether details of seam applicable | No | |
|
| 8. | | Details of Mining Lease: | | (a)Mining Lease Area (in Hectare) | 97.031 | | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | | (i)Copy of Letter of Intent | Copy of Letter of Intent | | (ii)Date of issue of LOI | 25 Sep 1974 | | (iii)Validity of LOI | 50 | | (iv)Reference No. of LOI | NIL | | (c)Whether Lease Deed Executed ? | Yes | | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | | (ii)Provide area in Hectare as per executed lease deed (initial) document | 97.031 | | (iii)Validity of the lease deed | From : 25 Sep 1994 To : 24 Sep 2024 | | (iv)Date of Execution of Mining Lese | 13 Sep 1994 | | (v)Reference Number | 105/2016 | | (d)Whether Lease Deed Renewed ? | Yes | |
|
| 8.1. Earlier Renewals: |
|---|
| S. No. | Lease Details | Date of Renewal | Period | Copy of Earlier Lease | Letter No. | Area | Remarks |
|---|
| (1.) | Renewal | 25 Sep 1994 | From : 25 Sep 1974 To : 24 Sep 2024 | Copy of Earlier Lease | NIL | 97.031 | nil | |
|
| 9. | | OB (Over Burden) Management: | | (a) Details of External Dumps: | | (i)No. of OB Dumps | 6 | | (ii)Total Area (in Hectare) | 2.010 | | (iii)Height (in meter) | 4 | | (iv)Quantity (in Million Cubic meter) | 0.0944 | | (v)No. of year back fill up | 5 | | (b) Details of Internal Dumps: | | (i)No. of Internal Dumps | 0 | | (ii)Total Area (in Hectare) | 0 | | (iii)Height (in meter) | 0 | | (iv)Quantity (in Million Cubic meter) | 0 | |
|
| 10. | | Details of Topsoil Management: | | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0.19 | | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0.19 | | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
| 11. | | Details of Final Mine Void: | | (a)Area (in Hectare) | 8.349 | | (b)Depth (in meter) | 16 | | (c)Volume (in Million Cubic meter) | 1.335 | |
|
| 12. | | Details of Quarry: | | (a)Final Void of 8.349 (hectare) at a Depth of 6 meter which is Proposed to be Converted into a Water Body. | | (b)Total Quarry Area (ha) | 97.031 | |
|
| 13. | | Details of Transportation: | | (a)In Pit/Underground to Surface | 1Km | | (b)Surface to Siding/Loading | 5 Km | | (c)Transportation / Conveyor Details | 16 Trucks | |
|
|
| 14. Details of Land Usage (Pre-Mining) |
|---|
| S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
|---|
| (1.) | AGRICULTURE LAND | | 61.747 | 0 | 61.747 | | (2.) | OTHERS(Specify) | Road | 0.935 | 0 | 0.935 | | (3.) | WASTE LAND | | 34.034 | 0 | 34.034 | | (4.) | GRAZING LAND | | 0 | 0 | 0 | | (5.) | FOREST LAND | | 0 | 0 | 0 | | (6.) | SURFACE WATER BODIES | | 0 | 0 | 0 | | (7.) | SETTLEMENTS | | 0.315 | 0 | 0.315 | |
TOTAL | 97.031 | 0 | 97.031 | |
|
| 15. Details of Land Usage (Post-Mining) |
|---|
| S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
|---|
| (1.) | EXCAVATION/QUARRY | | 8.349 | 0 | 0 | | 8.349 | | (2.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0.05 | | 0.05 | | (3.) | GREEN BELT | | 5 | 0 | 0 | | 5 | | (4.) | VIRGIN AREA | | 0 | 0 | 76.214 | | 76.214 | | (5.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | | (6.) | TOP SOIL STORAGE | | 0.578 | 0 | 0 | | 0.578 | | (7.) | ROADS | | 0 | 0 | 0.82 | | 0.82 | | (8.) | INTERNAL OB DUMPS | | 2.01 | 0 | 0 | | 2.01 | | (9.) | Other | Mineral Storage,Mineral beneficiation | 4.01 | 0 | 0 | | 4.01 | |
TOTAL | 19.947 | 0 | 77.084 | 0 | 97.031 | |
| 16. | | Details of Reclamation: | | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | | (a)External OB Dump(in hectare) | 2.01 | | (b)Internal Dump(in hectare) | 0 | | (c)Quarry(in hectare) | 8.349 | | (d)Safety Zone(in hectare) | 5 | | (e)Final Void of 8.349 (hectare) at a Depth of 6 meter which is Proposed to be Converted into a Water Body. | | (f)Density of Tree Plantation per ha (in no.) | 2500 | | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | | (h)Total afforestation plant (in hectare) | 19.947 | |
|
| 17. | | Status of progressive Mining Closure Plan: | | Details Not Applicable | |
|
| 18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
|---|
| S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
|---|
| (1.) | 1989 | 0 | 0 | 0 | 46.5 | 0 | | (2.) | 1994 | 0 | 0 | 0 | 50 | 0 | | (3.) | 1995 | 0 | 0 | 0 | 410 | 0 | | (4.) | 1996 | 0 | 0 | 0 | 68 | 0 | | (5.) | 1998 | 0 | 0 | 0 | 0 | 0 | | (6.) | 1993 | 0 | 0 | 0 | 150 | 0 | | (7.) | 1986 | 0 | 0 | 0 | 4401 | 0 | | (8.) | 2006 | 0 | 0 | 64935 | 3316 | 3316 | | (9.) | 1987 | 0 | 0 | 00 | 7575 | 0 | | (10.) | 2001 | 0 | 0 | 0 | 0 | 0 | | (11.) | 2003 | 0 | 0 | 0 | 0 | 0 | | (12.) | 2008 | 0 | 0 | 69217 | 0 | 0 | | (13.) | 1988 | 0 | 0 | 0 | 1200 | 0 | | (14.) | 1990 | 0 | 0 | 0 | 479.6 | 0 | | (15.) | 1991 | 0 | 0 | 0 | 16.0 | 0 | | (16.) | 1992 | 0 | 0 | 0 | 150 | 0 | | (17.) | 1997 | 0 | 0 | 0 | 0 | 0 | | (18.) | 1999 | 0 | 0 | 0 | 5.5 | 0 | | (19.) | 2000 | 0 | 0 | 0 | 0 | 0 | | (20.) | 2002 | 0 | 0 | 0 | 0 | 0 | | (21.) | 2004 | 0 | 0 | 0 | 0 | 0 | | (22.) | 2005 | 0 | 0 | 60372 | 0 | 0 | | (23.) | 2007 | 0 | 0 | 67041 | 503 | 503 | | (24.) | 2009 | 0 | 0 | 70200 | 0 | 0 | |
|
| 36. | | Details of Court Cases: | | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | | (b)Name of the Court | High Courts | | (c)Name of the Sub Court | Orissa | | (d)Case No. | II(c)CC02/2015 | | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | Summon issued | | (f)Case Details | Under violation to E(P) Act,1986 | | (g)Uploaded Court Order | Copy of Court Order | |
|
| 37. | | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
| 38. | | Details of EIA Consultant: | | (a)Have you hired Consultant for preparing document? | Yes | | (i)Accreditation No. | NABET/EIA/1922/RA0154 | | (ii)Name of the EIA Consultant | Kalyani Laboratories Private Limited | | (iii)Address | Plot No: 78/944, Millenium City, Pahala, BBSR, 752101 | | (iv)Mobile No. | 9437306091 | | (v)Landline No. | 0674297405 | | (vi)Email Id | kalyanilab@yahoo.co.in | | (vii)Category of Accreditation | A | | (viii)Sector of Accreditation | Non-Coal Mining | | (ix)Validity of Accreditation | 24 Apr 2022 | | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
| Essential Detail Sought : NIL |
| Additional Detail Sought: |
|---|
| Sno. | ADS Letter | Remarks | Date of ADS |
|---|
| 1. | ADS Reply Letter | Compliance to ADS submitted | 11 Jan 2023 | | 2. | ADS Raise Letter | NA | 16 Sep 2021 | | 3. | ADS Reply Letter | Compliance to ADS | 14 Aug 2021 | | 4. | ADS Raise Letter | NA | 07 Jul 2021 | | 5. | ADS Reply Letter | Compliance to ADS submitted | 12 Mar 2021 | | 6. | NA | As per minutes of 43rd meeting of EAC, deferred the project for want of following information:
1) Revised damage assessment cost as suggested during the meeting shall be assessed. Remediation, Natural and Community resource Augmentation plan is related to the EMP activities and confined to project site, therefore activities under all the three plan shall be revised for outside he project area.
2) Remediation, Natural and Community resource augmentation plan shall be prepared for three with monitorible capital investments
3) Rework on the table for monitoring stations w.r.t to predominant wind direction and accordingly incremental load shall be assessed using modelling tools.
4) Safety measures for water bodies in the vicinity of the mine lease area with details of safety zone for near habitation, agriculture and water bodies.
5) Rework on the dumpling plan with details of garland drain and toe wall etc.
6) Details of peripheral plantation shall be submitted.
7) Monitorible Physical targets w.r.t the issues raised during Public Hearing shall be identified and incorporated under EMP.
8) Issues raised during the Public Hearing shall be tabulated alogwith the compliance submitted in response.
9) Details for reclamation of external dumps.
10) Details of transportation of mineral. | 10 Mar 2021 | | 7. | NA | EAC deliberated on the information submitted by the Project Proponent (Form 2, EIA EMP report, PH issues, Annexures etc) in the 43rd meeting held on 8-9 February, 2021, deferred the project for want of following information
1) Revised damage assessment cost as suggested during the meeting shall be assessed. Remediation, Natural and Community resource Augmentation plan is related to the EMP activities and confined to project site, therefore activities under all the three plan shall be revised for outside he project area.
2) Remediation, Natural and Community resource augmentation plan shall be prepared for three with monitorible capital investments
3) Rework on the table for monitoring stations w.r.t to predominant wind direction and accordingly incremental load shall be assessed using modelling tools.
4) Safety measures for water bodies in the vicinity of the mine lease area with details of safety zone for near habitation, agriculture and water bodies.
5) Rework on the dumpling plan with details of garland drain and toe wall etc.
6) Details of peripheral plantation shall be submitted.
7) Monitorible Physical targets w.r.t the issues raised during Public Hearing shall be identified and incorporated under EMP.
8) Issues raised during the Public Hearing shall be tabulated alogwith the compliance submitted in response.
9) Details for reclamation of external dumps.
10) Details of transportation of mineral. | 10 Mar 2021 | | 8. | NA | EAC deliberated on the information submitted by the Project Proponent (Form 2, EIA EMP report, PH issues, Annexures etc) in the 43rd meeting held on 8-9 February, 2021, deferred the project for want of following information:
1) Revised damage assessment cost as suggested during the meeting shall be assessed. Remediation, Natural and Community resource Augmentation plan is related to the EMP activities and confined to project site, therefore activities under all the three plan shall be revised for outside he project area.
2) Remediation, Natural and Community resource augmentation plan shall be prepared for three with monitorible capital investments
3) Rework on the table for monitoring stations w.r.t to predominant wind direction and accordingly incremental load shall be assessed using modelling tools.
4) Safety measures for water bodies in the vicinity of the mine lease area with details of safety zone for near habitation, agriculture and water bodies.
5) Rework on the dumpling plan with details of garland drain and toe wall etc.
6) Details of peripheral plantation shall be submitted.
7) Monitorible Physical targets w.r.t the issues raised during Public Hearing shall be identified and incorporated under EMP.
8) Issues raised during the Public Hearing shall be tabulated alogwith the compliance submitted in response.
9) Details for reclamation of external dumps.
10) Details of transportation of mineral. | 10 Mar 2021 | | 9. | NA | EAC deliberated on the information submitted by the Project Proponent (Form 2, EIA/EMP report, PH issues, Annexures etc) in the 43rd meeting held on 8-9 February, 2021, deferred the project for want of following information:
1) Revised damage assessment cost as suggested during the meeting shall be assessed. Remediation, Natural and Community resource Augmentation plan is related to the EMP activities and confined to project site, therefore activities under all the three plan shall be revised for outside he project area.
2) Remediation, Natural and Community resource augmentation plan shall be prepared for three with monitorible capital investments
3) Rework on the table for monitoring stations w.r.t to predominant wind direction and accordingly incremental load shall be assessed using modelling tools.
4) Safety measures for water bodies in the vicinity of the mine lease area with details of safety zone for near habitation, agriculture and water bodies.
5) Rework on the dumpling plan with details of garland drain and toe wall etc.
6) Details of peripheral plantation shall be submitted.
7) Monitorible Physical targets w.r.t the issues raised during Public Hearing shall be identified and incorporated under EMP.
8) Issues raised during the Public Hearing shall be tabulated alogwith the compliance submitted in response.
9) Details for reclamation of external dumps.
10) Details of transportation of mineral. | 10 Mar 2021 | | 10. | NA | EAC deliberated on the information submitted by the Project Proponent (Form 2, EIA/EMP report, PH issues, Annexures etc) in the 43rd meeting held on 8-9 February, 2021, deferred the project for want of following information:
1) Revised damage assessment cost as suggested during the meeting shall be assessed. Remediation, Natural and Community resource Augmentation plan is related to the EMP activities and confined to project site, therefore activities under all the three plan shall be revised for outside he project area.
2) Remediation, Natural and Community resource augmentation plan shall be prepared for three with monitorible capital investments
3) Rework on the table for monitoring stations w.r.t to predominant wind direction and accordingly incremental load shall be assessed using modelling tools.
4) Safety measures for water bodies in the vicinity of the mine lease area with details of safety zone for near habitation, agriculture and water bodies.
5) Rework on the dumpling plan with details of garland drain and toe wall etc.
6) Details of peripheral plantation shall be submitted.
7) Monitorible Physical targets w.r.t the issues raised during Public Hearing shall be identified and incorporated under EMP.
8) Issues raised during the Public Hearing shall be tabulated alogwith the compliance submitted in response.
9) Details for reclamation of external dumps.
10) Details of transportation of mineral. | 10 Mar 2021 | |
| | Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| | | Name of Applicant | Jyoti Pramanik | | Designation | Lessee | | Name of Company (Applicant Name should not be given here) | PUTKA LIMESTONE MINES | | Address | Village- Putka,Tahasil-Jharbandh,Dist-Bargarh,Odisha |
|