S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Jalagam Vengala Rao Opencast Mine (I&II Expansion)
(b)Name of the Company / Organisation The Singareni Collieries Company Limited
(c)Registered Address M/s. Singareni Collieries Company Limited PO: Kothagudem Collieries - 507 101 Dist: KHAMMAM, T.Sr,,Khammam,Telangana-507101
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shri G Venkateswara Reddy
(b)Designation (Owner/ Partner/ CEO) Director (Planning & Projects)
(c)Address Kothagudem P.O -507101 Bhadradri Kothagudem District,,,Bhadradri Kothagudem,Telangana-507101
(d)Pin code 507101
(e)E-mail gm_env@scclmines.com
(f)STD Code. 8744(f)Telephone No. 243059
(g)Fax No. 08744244115
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity2(a) Coal washeries
1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/TG/CMIN/171196/2019
(d)Master Proposal Number(Single Window) SW/171141/2020
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. KOMMEPALLI: Patta Land : 1-5, 7-14, 16-25, 28-36,
(b)Pincode 507303
(c)Bounded Latitudes (North)
From
Degree 170954
Minutes
Second
From
Degree 171301
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 804543
Minutes
Second
From
Degree 804920
Minutes
Second
(e)Survey of India Topo Sheet No. 65C/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 180
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaKhammamSathupalleKommepalli Near Sathupalli
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/268/2007-IA.II(M)
(c)Date of Issue of TOR 21 May 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 26 Feb 2021
(c)Date of Issue of EC 11 Oct 2021
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :11 Jan 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Feb 2020
Distance of Public Hearing Venue from the Proposed Project :0.5
JVR Government College, Sathupalli
State :Telangana
District :Khammam
Tehsil :Sathupalle
Village :Sathupalli
600Major issues of environmental concerns that emerged during the Public hearing process are development of surrounding areas, infrastructure facilities employment of local, compensations for land, educaOthersAdditional Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. EP/12.1/857/AP/1825, dt. 21.11.2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 19 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)1953.465510OthersMTPARoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)10.00 Mtpa in 1953.46 ha with. Shovel- Dumper05.00 Mtpa in 1409.81 ha with. Shovel- Dumper10.00 Mtpa in 1953.46 ha with. Shovel- Dumper10.00 Mtpa in 1953.46 ha with. Shovel- DumperWith Integrated Coal Washery
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 03 Jan 2018
(iv)Valid Upto 31 Oct 2022
(v)File No. 170421033095
(vi)Application No. 170421033095
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 13.7
(b) Funds Allocated for Environment Management (Capital) (in Crores) 13.70
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.00
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 9.27
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 6598
(b)Existing quantity of raw material/fuel 6597
(c)Total quantity of raw material/fuel 13195
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Explosives13195Tons per AnnumFrom Explosive CompaniesRoad60 MoUCopy of Linkage
(2.)Water3220OtherskldMine PumpingOthersPipe Line1 OthersPipelineCopy of Linkage
(3.)Power9646OtherskVA33/3.3 kV Sub- Station, SathupalliOthersOHT Lines1 LOACopy of Linkage
(4.)Diesel45720OthersKL per AnnumPurchase from Oil companiesRoad140 LOACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube61.6030.5058.90NS
(2.)PM10Micro Gram per Meter Cube138.0082.00136.60250
(3.)NOxMicro Gram per Meter Cube21.0016.8020.40120
(4.)SO2Micro Gram per Meter Cube13.6011.7013.60120
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsTotal Chromium as Crmg/l000.050.05
(2.)TSSOthersNA0000
(3.)Chloridesmg/l4821602501000
(4.)pHOthersNA7.46.86.58.5
(5.)TDSmg/l14505805002000
(6.)Total Hardnessmg/l575220200600
(7.)Fluoridemg/l0.850.551.01.5
(8.)Heavy MetalsLead as pbmg/l000.010.01
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l128E
(2.)pHNA7.96.7A
(3.)DOmg/l6.25.8C
(4.)CODmg/l4025A
(5.)OthersTotal ColiformsOthersMPN/100 ml920220C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.8051.5075.00
(2.)Leq(Night)A-weighted decibels(dB(A))49.8042.1070.00
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare240195
(2.)pH7.47.2
(3.)P(Phosphorus)Kilogram per hectare18.1015.70
(4.)K(Potassium)Kilogram per hectare440229
(5.)Electric ConductivityMillisiemens per Centimetre0.340.27
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.85 To 3.48
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.15 To 2.62
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater32201.0Copy of Permission LetterPipelineOthersPumping4693/HgII(2)/200801 Nov 20084592
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Ground water71187118Settling Ponds, ETP and FilterbedsOthersTo nearby tanks for agriculture32203898
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7118
(b)Total Discharged Water (Kilolitre per Day) 3898
(c)Total Reused Water (Kilolitre per Day) 3220
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)otherOthersTop soil2616000Tons1.5OthersDumpers/Dump-TrucksOthersSpreading over Dumps
(2.)othersOthersHard Over burden98900000Tons1.5OthersDumpers and dump trucksOthersDumping in external dumps and backfilling areas
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube13.6002.2215.83120
(2.)NOxMicrogram per Meter Cube21.0005.0526.06120
(3.)PM10Microgram per Meter Cube138.0006.66144.67250
(4.)PM2.5Microgram per Meter Cube61.60016.2077.81NS
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 9646
(b)Source 33/3.3 kV Sub- Station, Sathupalli
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Nil
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 1156.72
(b)Private Land (ha.) 560.21
(c)Government Land (ha.) 236.53
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1953.4600
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 437.68
(b)Waste/Barren Land (ha.) 173.01
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 39.35
(e)Settlements (ha.) 27.01
(f)Industrial (ha.) 0
(g)Forest (ha.) 596.81
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Area covered by Mining activities 679.60
    Total (ha.) 1953.4600
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area1030.87
(2.)OB Dump Area507.05External Dump
(3.)Built Up Area152.74Road and Infrastructure (Coal Washery of 13.03 ha)
(4.)Safety Zone219.43Safe Distance Including Tanks, Drains & Bund
(5.)Township43.37Out Side Project Area
Total (ha.) 1953.46
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0NA
(2.)Wildlife CorridorsNA0NA
(3.)Critically Polluted AreaNA0NA
(4.)WLSNA0NA
(5.)ESAsNA0NA
(6.)ESZsNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0NA
(2.)Archaeological SitesNA0NA
(3.)ForestNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Final(Stage-II) Approval Obtained
(i)MoEFCC file number FP/TG/MIN/4795/2011
(ii)Date of final approval 30 May 2017
(iii)Date of In-Principle Approval 30 May 2017
(iv)Area diverted 776.2
(v)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1717.58
(b)Land yet to be acquired(Ha) 235.88
(c)Status of Land acquisition if not acquired Under Process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Rock Python and Indian Monitor Lizard
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 2.57 Crores
(iii)Period of Implementation 3 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Jinugupalli Tank and two other small seasonal tanks.
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bethupalli and Lankasagar Tanks
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 706
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 800
(e)No. of working days 340
(f)Total Manpower 1506
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt192.701096.161288.8600000000001
(2.)Percentage of Total Project Area9.8656.1165.97
(3.)No. of Plants48175027404003222150
(4.)Funds Allocated115620006576960077331600
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialRoad transport, Communication, Housing, Power, Educational, Communication, Medical, Recreation and Business establishments will be developed.
(2.)FinancialDirect and Indirect employment opportunities to local people in contractual works in coal washery , OB Off-loading, civil construction, coal transportation, supply of goods and provision of services to the project and other community services will improve.
(3.)EnvironmentalDe-silting of tanks, avenue plantation in the nearby villages will be carried out and the left out void of the project will be converted into water body which will augment ground water recharge
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 10 Mtpa
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. PCA-38011/12/2017-PCA
(b)Date of Approval 29 Mar 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 1953.46
(f)Approved Capacity 10.00
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 309.55
(b)Mineable Reserves (Million Ton) 297.24
(c)Extractable Reserves(Million Ton) 291.97
(d)Percent(%) of Extraction 94.30
(e)Grade of Coal /Ore /Mineral G-9 and G-12
(f)Stripping Ratio 1 : 4.26
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA- OC Mine
(h)Average Gradient(Degree) 1 in 2.5 to 1 in 11.0
(i)Mining Method Opencast
(j)Life of Mine (Years) 28
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area Yes
(b)Beneficiation / Washing Technology Jig & Drum Technology
(c)Capacity 4
(d)Whether it is proposed to install crusher within the mining lease area Yes
(e)No. of crushers 2
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1400 Wet process with Double row roll crusheres of 2 X 400 TPH
(2.)2400 crusher id in coal washery
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 6
(c)Thickness of seams to be worked on 39.61
(d)Maximum Thickness of Seams (metres) Seam D : D3-6.4, D2-1.67, D1-6, Seam C: C7-7.03, C6-4, C5-2.5, C4-1.8, C3-1.9, C2-1.14, C1-3.39, Seam-B: B7-2, B6-2, B5-2.2, B4-2.3, B3-3, B2-5.55, B1-8.03, Index-II -1.38, Index-I- 7.74
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1910.09
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 17 Sep 2018
(iii)Validity of LOI 28
(iv)Reference No. of LOI 1032/PR(A1)/2018
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 1820.24
(iii)Validity of the lease deed From : 14 Feb 2017 To : 13 Feb 2047
(iv)Date of Execution of Mining Lese 14 Feb 2017
(v)Reference Number Procgs. No. 2551/ML/2014
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Lease Validity Exists
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 507.05
(iii)Height (in meter) 120
(iv)Quantity (in Million Cubic meter) 363.93
(v)No. of year back fill up 1
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 2
(ii)Total Area (in Hectare) 531.75
(iii)Height (in meter) 120
(iv)Quantity (in Million Cubic meter) 819.92
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 18.48
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 18.48
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 499.12
(b)Depth (in meter) 363.45
(c)Volume (in Million Cubic meter) 885.23
12.
Details of Quarry:
(a)Final Void of 499.12 (hectare) at a Depth of 363.45 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 1030.87
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumpers
(b)Surface to Siding/Loading Belt Conveyors
(c)Transportation / Conveyor Details Rail and Rail
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND020.8020.8
(2.)GRAZING LAND3.7503.75
(3.)FOREST LAND1156.7201156.72
(4.)SETTLEMENTSVillages8.3508.35
(5.)AGRICULTURE LAND691.7422.57714.31
(6.)OTHERS(Specify)Roads12.24012.24
(7.)SURFACE WATER BODIES37.29037.29
TOTAL1910.0943.371953.46
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY531.75499.1201030.87
(2.)EXTERNAL OB DUMPS507.0500507.05
(3.)GREEN BELT162.29015.00177.29
(4.)TOP SOIL STORAGE0000
(5.)VIRGIN AREA0000
(6.)ROADS0000
(7.)INTERNAL OB DUMPS0000
(8.)OtherRoad & Infrastructure Area and Others87.3713.2694.25194.88
(9.)BUILT UP AREA (COLONY/OFFICE)0043.3743.37
TOTAL1288.46512.38152.6201953.46
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 531.75
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 507.05
(d)Safety Zone(in hectare) 162.29
(e)Final Void of 499.12 (hectare) at a Depth of 363.45 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 87.37
(h)Total afforestation plant (in hectare) 1288.86
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 1030.87
Total Area Backfilled after Excavation (in hectare) 531.75
Total Area Reclaimed (in hectare) 1288.86
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2017..185.005.005.000.750.00
(2.)2018..195.005.005.002.960
(3.)2019..205.005.005.004.830
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court NGT
(c)Name of the Sub Court NGT Southern Zone
(d)Case No. 1)O.A 174 of 2020 (SZ) and 2)O.A.No.20 of 2021(SZ)
(e)Orders/Directions of the court ,if any and its relevance with the proposed project NGT directed for a study by a joint committee
(f)Case Details 1. Case No. O.A. 174 of 2020 (SZ), dt: 08.09.2020
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Present proposal for expansion of the existing JVR OCP-II project with adjacent JVR OC-I Expn. For JVR OC-I Expn. EC was obtained under violation category, as per MoEF&CC S.O 804(E), dated 14.03.2017. As, per the S.O 804(E) State government/SPCB should take action against the Project proponent under the provision of the Environment (Protection) Act, 1986. Accordingly EE, RO, Kothagudem, TSPCB filed a case under Section 15 of the E(P) Act, 1986 in the Court of Hon'ble Judicial Magistrate of F.C.
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Court case is under process
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA0143, Dated 06.12.2019
(ii)Name of the EIA Consultant EPTRI
(iii)Address 91/4 Gachibowli
(iv)Mobile No. 9885236493
(v)Landline No. 0406756750
(vi)Email Id dgeptri@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 29 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAYou are requested to provided following: • Previous Environment Clearance of the project • Whether the proposal has been considered by EAC Violation and if yes, what is the status for that proposal. • .kml file with exact location of the project. • Certified Compliance Report from Ministry’s Regional Office for the project (JVR OC-I and JVR- OC II) • Consent to Operate for the both project. • Wildlife Conservation Plan considering both the area. However, it has been submitted only for JVR – I. • Details of Court case of NGT and its present status. • Upload NABET approved certificate of consultant who prepared EIA/EMP Report • Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan shall be enclosed 20 Oct 2020
2. Eds Reply LetterThe correction have been made as per the instruction received 24 Oct 2020
3.NAthe application may not be considered after examination of the EDS Reply based on following a. EC for JVR-1 is not yet granted by the Ministry after recommendation of EAC violation b. Ministry issued a letter regarding non-compliance of existing EC wrt JVR OC II and is required to be settled beforehand c. As reported in the EDS that a case has been admitted by National Green Tribunal, Southern Bench, Chennai, and committee has been set up. latest status of the court case may be given. d. Specific reasons for merger may be indicated 05 Nov 2020
4.NAThe correction have been made as per the instruction received 26 Feb 2021
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSubmission of reply for the ADS pertaining to Jalagam Vengala Rao Opencast (I&II Expansion) Project of M/s The Singareni Collieries Company Ltd. for grant of EC. It is requested to kindly consider the proposal in the ensuing EAC meeting for grant of EC. 10 Jul 2021
2.NA

The EAC after detailed deliberations observed that the proposed project is of amalgamation of EC with additional area of 26.39 ha. The coal reserve of JVR-I will get exhausted by the end of this year and accordingly mine void of JVR-I will be used for dumping OB material. Accordingly, earlier, Mine Closure Plan of JVR-I has been changed. It was observed that surface quality of nearby water tank is poor and exceeding the norms. Also, it was noted that disposal of washery rejects from proposed new coal washery, in OB dump may have safety issue and leads to wastage of extracted resources. Certified Compliance report of JVR-OC II submitted by Ministry’s Regional Office have various non-compliance based on site visit conducted in September, 2019. No certified compliance report of EC of JVR-OC I has been submitted by Project Proponent. Amendment of EC conditions of JVR-OC II regarding transportation by road till December 2021 is under consideration in the Ministry. Further, there are various issues which required further deliberations and suitable response. Therefore, after deliberation, the Committee recommend to defer the proposal for want of following information.

(i)                 PP shall submit Past Production details of both the said mines since inception of mine duly authenticated by departments of Mine and Geology Government of Telangana or from Coal Controller vis-à-vis CTO.

(ii)              Fresh certified compliance report from Ministry’s Regional Office shall be obtained and accordingly also submit action taken report of both the ECs (JVR- OC I and JVR OC II).

(iii)            PP should submit details of control blasting with adequate safeguard for nearby people.

(iv)             PP should conduct Noise and vibration monitoring in nearby habitation/villages during day and night for 1 month.

(v)                PP should submit the point wise reply of Public Hearing with timeline and fund alloted. Proper response of public consultation with regard to pollution mitigation measures and demands of local people

(vi)             Expenditure incurred for wildlife conservation, submitted during earlier ECs.

(vii)           PP should submit Effectiveness report of road and vegetation checked by authority.

(viii)         PP shall bring out the action plan for upgrading the skills of the local people already employed in the mines.

(ix)             PP should submit the fund allocated for green belt development with proper timeline. PP should submit the detailed plan in tabular format (year-wise for life of mine) for afforestation and green belt development in and around the mining lease. PP should show on a surface plan (5-year interval for life of mine) of suitable scale the area to be covered under afforestation & green belt clearly mentioning the latitude and longitude of the area to be covered during each 5 years

(x)               PP should submit the plan for installation of CAAQMS and its display system in the nearby habitations or at mine office.

(xi)             Plan and allotted fund for maintenance and widening (if any) for road transportation (32 km) of coal till the commissioning of railway siding.

(xii)           PP shall study the impact Assessment and its mitigation measures w.r.t. proposed road route on receptors for environment parameters as per Ambient Air Quality standards.

(xiii)         Ministry shall form the EAC Subcommittee to conduct site visit to analyze the prevailing condition of the current scenario and implementation of measures approved by Ministry while granting EC dated 1st February, 2021 regarding Remediation plan and Natural and Community Resource Augmentation Plan

(xiv)          PP shall propose air pollution mitigation measures for nearby villages of Kistaram and Siddaram.

(xv)            Plan for utilization of washery rejects in FBC Power Plant/ Thermal Power Plant.

(xvi)          PP shall check the physical characteristics of OB material for extraction of sand for its further utilization in construction activity.

 

The proposal is deferred in above lines

05 Apr 2021
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShri G Venkateswara Reddy
DesignationDirector (Planning & Projects)
Name of Company (Applicant Name should not be given here)The Singareni Collieries Company Limited
AddressKothagudem P.O -507101 Khammam Dt