1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) E.I.D PARRY INDIA LIMITED
(b)Name of the Company / Organisation E.I.D.-PARRY (INDIA) LIMITED HALIYAL
(c)Registered Address HALIYAL SUGAR FACTORY, HULLATTI VILLAGE, HALIYAL TALUKA, UTTARA KANNADA DISTRICT, KARNATAKA,,Uttara Kannada,Karnataka-581321
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant VENKATA RAO J
(b)Designation (Owner/ Partner/ CEO) SR. AVP - WORKS
(c)Address HALIYAL SUGAR FACTORY, HULLATTI VILLAGE, HALIYAL TALUKA, UTTARA KANNADA DISTRICT, KARNATAKA,,Haliyal,Uttara Kannada,Karnataka-581321
(d)Pin code 581321
(e)E-mail venkatarao.j@parry.murugappa.com
(f)STD Code. 8284(f)Telephone No. 220676
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(j) Sugar Industry
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/KA/IND2/140818/2016
(d)Master Proposal Number(Single Window) SW/140071/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Hullatti Village area 6/1 part, 6/2 part, 7/1 pa
(b)Pincode 581329
(c)Bounded Latitudes (North)
From
Degree 15.31122
Minutes
Second
From
Degree 15.3211
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.75825
Minutes
Second
From
Degree 74.76842
Minutes
Second
(e)Survey of India Topo Sheet No. 48 I/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 544
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.2
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratkutchLakhpatMudhvay, Maldo, Koriyani, Kapurashi
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/382/2016-IA-II(I)
(b)Date of Apply of TOR 02 Dec 2016
(c)Date of Issue of TOR / Standard ToR 28 Mar 2017
(d)Date of Apply of EC 09 Sep 2014
(e)Date of Issue of EC 04 Feb 2015
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Nov 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Dec 2019
Distance of Public Hearing Venue from the Proposed Project :0
PROJECT SITE PREMISES
State :Karnataka
District :Uttara Kannada
Tehsil :Haliyal
Village :HULLATTI & ALLOLI
200PRIORITY TO LOCAL FARMERS FOR HARVESTING AND DUST EMISSIONOthersADDITIONAL DEPUTY COMMISSIONER
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. EP/12.1/16/201-15/KAR2103
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 11 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)SUGAR6000550011500OthersTCDRoad
(2.)CO-GEN POWER342054Mega Watt(MW)OthersTRANSMISSION LINES
(3.)RECTIFIED SPIRIT / ENA / ETHANOL90090Kilo Litre per Day(KLD)Road
(4.)POWER FROM INCINERATION BOILER303Mega Watt(MW)OthersCAPTIVE USE
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)POWER FROM INCINERATION BOILER3 MW03 MW
(2.)CO-GEN POWER PLANT34 MW20 MW54 MW
(3.)DISTILLERY90 KLPD090 KLPD
(4.)SUGAR6000 TCD5500 TCD11500 TCD
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 Nov 2016
(iv)Valid Upto 30 Jun 2021
(v)File No. AWH-301333
(vi)Application No. 11517
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 150
(b) Funds Allocated for Environment Management (Capital) (in Crores) 15
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.38
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 5500
(b)Existing quantity of raw material/fuel 6000
(c)Total quantity of raw material/fuel 11500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Phosphoric Acid2.3OthersTPDLOCAL AREARoad100 Open MarketCopy of Linkage
(2.)Bagasse2595OthersTPDINPLANT GENERATIONConveyor Belt0 OthersINPLANT GENERATIONCopy of Linkage
(3.)Lime19OthersTPDLOCAL AREARoad100 Open MarketCopy of Linkage
(4.)Sugar cane11500Tons Crushed per DayLOCAL FARMERSRoad70 OthersFARMERS WILL SUPPLYCopy of Linkage
(5.)Sulphur5.8OthersTPDLOCAL AREARoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube14.28.514.280
(2.)NOxMicro Gram per Meter Cube19.210.319.280
(3.)PM10Micro Gram per Meter Cube52.628.852.6100
(4.)OthersCOMicro Gram per Meter Cube6503206502000
(5.)PM2.5Micro Gram per Meter Cube31.718.831.760
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA0000
(2.)TDSmg/l3841985002000
(3.)Heavy Metalsironmg/l0.20.10.31.0
(4.)pHNA87.26.58.5
(5.)Total Hardnessmg/l238159300600
(6.)Chloridesmg/l1561102501000
(7.)Fluoridemg/l0.620.41.01.5
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.47.1B
(2.)DOmg/l6.26.1B
(3.)BODmg/l00B
(4.)CODmg/l00B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))544475
(2.)Leq(Night)A-weighted decibels(dB(A))463970
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare240205
(2.)P(Phosphorus)Kilogram per hectare3522
(3.)pH7.87.0
(4.)K(Potassium)Kilogram per hectare6546
(5.)Electric ConductivityOthersmicrosiemens/sec13585
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 35 To 38
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 32 To 35
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface349123Copy of Permission LetterPipelineOthersPIPELINEJSE/88/MMB/200622 Feb 20073500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)SUGAR PLANT (EXISTING & EXPANSION)11501600ETPReuse within the Plant & Recycling,Green Belt Renewal Plant1150
(2.)CO-GEN POWER PLANT (EXISTING & EXPANSION)476476ETPReuse within the Plant & Recycling,Green Belt Renewal Plant476
(3.)DISTILLERY (EXISTING)868868ETPReuse within the Plant & Recycling868
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2494
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2494
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BAGASSEIndustrial Waste590040Tons0Conveyor BeltOthersUSED AS RAW MATERIAL FOR CO-GEN POWER PLANT
(2.)MOLASSESIndustrial Waste93240Tons0Pipe ConveyorOthersUSED AS RAW MATERIAL IN DISTILLERY UNIT
(3.)ETP SLUDGEIndustrial Waste82.8Tons0RoadOthersUSED AS MANURE FOR GREENBELT DEVELOPMENT
(4.)FLY ASHIndustrial Waste10274Tons50RoadOthersGIVEN TO FARMERS TO USE AS MANURE
(5.)FLU ASH (INCINERATION BOILER)Industrial Waste5400Tons100RoadOthersWILL BE GIVEN GROUP FERTILIZER UNIT
(6.)FILTER CAKEIndustrial Waste39600Tons0RoadOthersUSED AS MANURE FOR GREENBELT
(7.)YEAST SLUDGEIndustrial Waste3600Tons0RoadOthersMIXED WITH SPENT WASH AND INCINERATED IN BOILER
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube19.20.913.332.680
(2.)PM10Microgram per Meter Cube52.60.91.654.3100
(3.)SO2Microgram per Meter Cube14.20.99.724.080
(4.)PM2.5Microgram per Meter Cube31.70.90.832.660
(5.)Others(Specify)COMicrogram per Meter Cube6500.92.4652.52000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)120 TPH BOILER (EXISTING)COAL & BAGASSE722.8SO248.6 g/s
(2.)120 TPH BOILER (EXISTING)COAL & BAGASSE722.8PM103.9 g/s
(3.)120 TPH BOILER (EXISTING)COAL & BAGASSE722.8NOx39.0 g/s
(4.)45 TPH BOILER (EXISTING)COAL & BAGASSE441.8SO29.8 g/s
(5.)45 TPH BOILER (EXISTING)COAL & BAGASSE441.8NOx14 g/s
(6.)15 TPH BOILER (EXISTING)CONCENTRATED SPENT WASH & COAL501.2PM100.5 g/s
(7.)15 TPH BOILER (EXISTING)CONCENTRATED SPENT WASH & COAL501.2SO29.4 g/s
(8.)15 TPH BOILER (EXISTING)CONCENTRATED SPENT WASH & COAL501.2NOx5.0 g/s
(9.)45 TPH BOILER (EXISTING)COAL & BAGASSE441.8PM101.4 g/s
(10.)100 TPH BOILER (PROPOSED)BAGASSE702.65PM103.9 g/s
(11.)100 TPH BOILER (PROPOSED)BAGASSE702.65NOx39.0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 20
(b)Source CO-GEN & CAPTIVE POWER
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1000 KVA
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 91.5
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 91.5
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 15762.8
(b)Waste/Barren Land (ha.) 4898.401
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2103.8
(e)Settlements (ha.) 973.4
(f)Industrial (ha.) 251.2
(g)Forest (ha.) 7410.4
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NONE 0
    Total (ha.) 31400.001
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant21.9
(2.)Green belt38.5
(3.)OthersROAD AREA AND OTHERS31.1
Total (ha.) 91.5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANIL0NIL
(2.)ESZsNIL0NIL
(3.)Critically Polluted AreaNIL0NIL
(4.)WLSNIL0NIL
(5.)CorridorsNIL0NIL
(6.)ESAsNIL0NIL
(7.)Wildlife CorridorsNIL0NIL
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNIL0NIL
(2.)ForestUNNAMED RESERVE FOREST1.5NIL
(3.)Archaeological SitesNIL0NIL
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 91.5
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired ACQUIRED
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area TATTIHALA RIVER
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 2.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 10
(e)No. of working days 300
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt851095
(2.)Percentage of Total Project Area37.64.442
(3.)No. of Plants40000500045000
(4.)Funds Allocated015000001500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialEMPLOYMENT
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET / EIA / 1922 / RA 0149
(ii)Name of the EIA Consultant PIONEER ENVIRO LABORATORIES & CONSULTANTS PVT. LTD
(iii)Address HYDERABAD
(iv)Mobile No. 9000380040
(v)Landline No. 0402311427
(vi)Email Id info@pioneerenvirolabs.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 22 Mar 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVENKATA RAO J
DesignationSR. AVP - WORKS
Name of Company (Applicant Name should not be given here)E.I.D.-PARRY (INDIA) LIMITED HALIYAL
AddressHALIYAL SUGAR FACTORY, HULLATTI VILLAGE, HALIYAL TALUKA, UTTARA KANNADA DISTRICT, KARNATAKA
Print