Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Offshore and Onshore Oil and Gas Exploration, Development & Production in existing Ravva Field, PKGM-1 Block (of 331.26 km2) located near Surasniyanam Village (S. Yanam) in Krishna-Godava
(b)Name of the Company / Organisation M/s Vedanta Limited(Division Cairn Oil & Gas)
(c)Registered Address Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Gurgaon,Haryana-122002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dilip Kumar Bera
(b)Designation (Owner/ Partner/ CEO) Sr. Manager - Environment
(c)Address Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,,Gurgaon,Haryana-122002
(d)Pin code 122002
(e)E-mail bhomaram.jat@cairnindia.com
(f)STD Code. 124(f)Telephone No. 4594176
(g)Fax No. 4145612
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity1(b) Offshore and onshore oil and gas exploration, development & production
(b)Category A
(c)Proposal Number IA/AP/IND2/102271/2013
(d)Master Proposal Number(Single Window) SW/102270/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Surasaniyan, Uppalaguptam, East Godavari District
(b)Pincode 533213
(c)Bounded Latitudes (North)
From
Degree 16.3467
Minutes
Second
From
Degree 16.5577
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 82.1186
Minutes
Second
From
Degree 82.3081
Minutes
Second
(e)Survey of India Topo Sheet No. 65L3 and 65L6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 7
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaKendujharBarbilThakurani
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/41/2018-IA-II (I)
(c)Date of Issue of TOR 29 Aug 2013
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 08 Jul 2019
(c)Date of Issue of EC 15 Oct 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :10 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :11 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0.05
At Beach Front, Surasaniyanam Beach Road
State :Andhra Pradesh
District :East Godavari
Tehsil :Uppalaguptam
Village :Surasaniyanam
151Employment, CSR, Social Infrastructure DevelopmentOthersJoint Collector & Additional District Magistrate, East Godavari District
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. 14-R-1040/APPCB/ RO/KKD/2019-1913
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 28 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Crude Oil50000050000OthersBOPDOthersPipelines
(2.)Natural Gas2.3202.32OthersMMSCMDOthersPipeline
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Onshore wellpads2 existing wellpads7 (including two existing wellpads)7Typical dimensions of each well pad of ~225m x ~170m
(2.)Onshore pipelinesTotal pipeline length of 192 km in PKGM-1 Block15 Km15 Km pipeline corridor15 Km pipeline corridor will have 3 pipelines for well fluid, gas and subsurface injection water
(3.)Onshore and offshore well drilling55 exploratory and development wells83 exploration wells and 40 development wells83 exploration wells and 95 development wellsExploration wells -73 offshore and 10 onshore and development wells - 17 offshore and 23 onshore
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 22 Jul 2016
(iv)Valid Upto 31 Oct 2021
(v)File No. APPCB/VSP/RJY/546/CFO/HO/2016
(vi)Application No. APPCB/VSP/RJY/546/CFO/HO/2016
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7924
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.37
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 8
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 8
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Fuel Supply8OthersCubic meter/day/wellDomestic MarketRoad. OthersAttachedCopy of Linkage
(2.)Drilling Chemicals200OthersTons/WellDomestic MarketRoad. OthersAttachedCopy of Linkage
(3.)Water85OthersCubic meter/wellGround waterOthersPipelines15 OthersAttachedCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 06 Jan 2018 To 31 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube16.710.516.4980
(2.)OthersCOMili Gram per Meter Cube0.260.150.252
(3.)SO2Micro Gram per Meter Cube14.88.714.4980
(4.)PM10Micro Gram per Meter Cube56.343.656.07100
(5.)PM2.5Micro Gram per Meter Cube25.718.425.5360
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l53343975002000
(2.)Fluoridemg/l0.70.211.5
(3.)pHOthersNA7.47.16.58.5
(4.)Total Hardnessmg/l1086.40165.20200600
(5.)Chloridesmg/l1857.70101.602501000
(6.)Heavy MetalsIronmg/l0.290.020.30.3
(7.)TSSmg/l..100100
(8.)OthersSulphatesmg/l65.53.6200400
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.25.6D
(2.)BODmg/l33D
(3.)CODmg/l..D
(4.)pHNA8.27.2D
(5.)OthersTSSmg/l3517D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))59.45065
(2.)Leq(Night)A-weighted decibels(dB(A))50.740.855
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.56.1
(2.)K(Potassium)Milligram per Kilogram..
(3.)N(Nitrogen)Milligram per Kilogram179.124.6
(4.)P(Phosphorus)Milligram per Kilogram145.212.6
(5.)Electric ConductivityOthersMicro Siemens Per Cm2350321
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 2
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater182148Copy of Permission LetterPipelineOthersBore wells19/RD/SLNA/STE/APWALTA-NOC/201603 Jan 201810413
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Drilling wash waste water per well (onshore)53000ETP of 3,000 KL/day (Ravva Terminal)Reuse within the Plant & Recycling5
(2.)Bilge water per well (offshore)10500Treated onboard before disposal offshore conforming to the MARPOL requirementsDischarge into Seawater Body10
(3.)Sewage per well (offshore)30100Treated on-board STP before discharge conforming to MARPOL requirementsDischarge into Seawater Body30
(4.)Drilling wash waste water per well (offshore)200500Treated onboard before disposal offshore conforming to the MARPOL requirementsDischarge into Seawater Body200
(5.)Sewage per well (Onshore)4.5175STP of 175 KL/day (Ravva Terminal)Reuse within the Plant & Recycling4.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 249.5
(b)Total Discharged Water (Kilolitre per Day) 240
(c)Total Reused Water (Kilolitre per Day) 9.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Drill Cutting per Well OnshoreHazardous Waste (as per Hazardous and Other Waste Management rules 2016)250Kilolitre220RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Spent Drilling Mud per Well OnshoreHazardous Waste (as per Hazardous and Other Waste Management rules 2016)200Kilolitre220RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Spent Lubricating Oil per Well OnshoreHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Kilolitre220RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Spent Drilling Mud per Well OffshoreHazardous Waste (as per Hazardous and Other Waste Management rules 2016)150Kilolitre.OthersService vessels and road transportOthersAs per MoEFCC Guidelines
(5.)Drilling Cuttings per Well OffshoreHazardous Waste (as per Hazardous and Other Waste Management rules 2016)220Kilolitre.OthersService vessels and road transportOthersAs per MoEFCC Guidelines
(6.)Food Waste per day offshoreMunicipal Solid Waste.025Tons.OthersNot requiredOthersDischarged offshore as per MoEFCC Guidelines
(7.)Food Waste per Day OnshoreMunicipal Solid Waste0.025Tons8RoadOthersComposting in-house or to be sent to piggeries
(8.)Spent Lubricating Oil per Well OffshoreHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Kilolitre220OthersService vessels and road transportTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube14.4.0.4114.8280
(2.)NOxMicrogram per Meter Cube16.4.14.831.380
(3.)Others(Specify)COMicrogram per Meter Cube253.18.2271.32000
(4.)PM10Microgram per Meter Cube55.3.0.4655.8100
(5.)PM2.5Microgram per Meter Cube.....
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set (1010 KVA) at wellpad for well drillingDiesel100.305NOx0.89
(2.)DG Set (350 KVA) at wellpad for well drillingDiesel70.305NOx0.311
(3.)DG Set (1010 KVA) at wellpad for well drillingDiesel100.305OthersCO0.78
(4.)DG Set (350 KVA) at wellpad for well drillingDiesel70.305PM100.0156
(5.)DG Set (350 KVA) at wellpad for well drillingDiesel70.305SO20.0272
(6.)DG Set (350 KVA) at wellpad for welldrillingDiesel70.305OthersCO0.272
(7.)Temporary flare stack at wellpad for well drillingGas300.4SO20.002
(8.)Temporary flare stack at wellpad for well drillingGas300.4OthersCO1.042
(9.)DG Set (1010 KVA) at wellpad for well drillingDiesel100.305PM100.044
(10.)Temporary flare stack at wellpad for well drillingGas300.4PM100.0893
(11.)Temporary flare stack at wellpad for well drillingGas300.4NOx0.1935
(12.)DG Set (1010 KVA) at wellpad for well drillingDiesel100.305SO20.078
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 10450
(b)Source Onshore drilling / well, DG Sets of 3 x 1000 kVA (
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Onshore drilling per well, standby arrangements in
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 417
(b)Private Land (ha.) 1536
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 31173
    Total Land (ha.) 33126
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 13059
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 17799
(e)Settlements (ha.) 1018
(f)Industrial (ha.) 0
(g)Forest (ha.) 4807
(h)Mangroves (ha.) 1157
(i)Marine Area (ha.) 61824
(j)Others (ha.) : Casaurina plantation, sand dunes, mudfalts and roa 2959
    Total (ha.) 102623
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersOnshore wellpad, pipelines and access roads4723 ha (wellpads) 16.5 ha (pipelines) 7.5 ha (road)
Total (ha.) 47
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaVisakhapatnam220Nearest distance from the Block
(2.)ESAsCoringa Wildlife Sanctuary25From nearest proposed well (E-11)
(3.)Wildlife CorridorsCoringa Wildlife Sanctuary25From nearest proposed well (E-11)
(4.)NPAHope Island41Nearest distance from the Block
(5.)CorridorsCoringa Wildlife Sanctuary25From nearest proposed well (E-11)
(6.)WLSCoringa Wildlife Sanctuary25From nearest proposed well (E-11)
(7.)ESZsCoringa Wildlife Sanctuary25From nearest proposed well (E-11)
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKandikoppa Reserve Forest7Nearest distance from existing Ravva Terminal
(2.)Defence InstallationsEastern Command Naval Base, Visakhapatnam220Nearest distance from the Block
(3.)Archaeological SitesAdurru Budhist Site35Nearest distance from the Block
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 47
(c)Status of Land acquisition if not acquired Land uptake will be initiated after receipt of EC
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Olive ridley turtle, Indian flapshell turtle, Monitor lizard, Osprey, Brahminy kite, Shikra , Pariah kite, Fishing Cat and Indian Pangolin
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Yes
(iii)Period of Implementation 2019 - 2024
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vrudha Gautami River, Nilarevu River and Vainateyam Godavari River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 0
(f)Total Manpower 0
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt79382
(2.)Percentage of Total Project Area35136
(3.)No. of Plants13000200015000
(4.)Funds Allocated40000002000004200000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification IB
(b)Location Type Non-Eroding Coast
(c)Details of Mangroves Land Involved, if Any Nil
(d)Area of Mangroves Land (hectare) 0
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies Covered in the EIA Study Report as enclosed
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 01 Jan 2018
(iv)Period of Study To (EIA Terrestrial) 30 Apr 2018
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies Covered in the EIA Study Report as enclosed
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 01 Jan 2018
(iv)Period of Study to (EIA Marine) 30 Apr 2018
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan The Oil Spill Contingency Plan for PKGM-1 (Ravva)
2.
Description of the Project Under Consideration:
(a)Type of Project Others
(i)Agency Name for Preparing CRZ Maps National Center for Sustainable Coastal Management
(ii)Please Specify with salient features Drilling of 123 wells. In the onshore drilling of
(iii)Uploaded relevent Document Copy of relevent Document
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity IB
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? Yes
(i)Distance of Project (in meters) from HTL to be Stated 100
(ii)Uploaded Maps(Shape File) Copy of Maps
(iii)Distance of Project(in meters) from LTL to be Stated 250
(iv)Uploaded Maps(Shape File) Copy of Maps
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared Yes
(i)Uploaded Maps (kml File) Copy of Maps
(f)NOC from State Pollution Control Boards Obtained Yes
(i)Copy of NOC Copy of NOC
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed As enclosed
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) As enclosed
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0055
(ii)Name of the EIA Consultant ERM India Private Limited
(iii)Address Building 10, Tower - A, 4th Floor, DLF Cyber City, Gurgaon
(iv)Mobile No. 9810112106
(v)Landline No. 0124417030
(vi)Email Id neena.singh@erm.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 31 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Entry at column 9(b) of Form-2 for EC shows the existing oil and gas production as 50000 bopd & 2.32 MMSCMD. There being no incremental production reflected therein, the proposal for expansion is not justified but actually misleading. - Details of project configuration mentioned in column 9(c) of Form-2 are to be consistent with the ECs issued from time time. The same needs to be established with the pictorial presentation, clearly showing different activities in onshore/offshore blocks separately. - Recommendations of SCZMA. - Proposals for amendment in EC dated 23/2/2015 & CRZ clearance dated 24/5/2017 to be submitted separately, and not be clubbed with the present proposal. 15 Jun 2019
2.NAThe correction have been made as per the instruction received 18 Jun 2019
3.NANo reply to our observations dated 15/6/2019 found uploaded on the portal. Please do the needful for consideration of the proposal. 06 Jul 2019
4.NAThe correction have been made as per the instruction received 08 Jul 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS Response 15-EAC-IA-II-Ag 15.5.12 and Revised EIA Volume 1 and 2 for Vedanta-Cairn's Proposed Expansion in PKGM-1 Block in Andhra Pradesh 04 Jun 2020
2.NA

The EAC, during deliberations noted that the project details mentioned in the Form2/EIA report were not consistent with that presented during the meeting. The project proponent has also desired to drop few wells whichbelong to ONGC onland area and PP do not have permission from DGH.

15 Jan 2020
3. ADS Reply LetterSubmission of the requested information sought during 11th EAC meeting held between 28-29 August 2019 agenda item no. 11.5.3 regarding the EC and CRZ clearances of "Expansion of Offshore and Onshore Oil and Gas Exploration, Development & Production in existing Ravva Field, PKGM-1 Block (of 331.26 km2) located near Surasaniyanam Village (S. Yanam) in Krishna- Godavari Basin, East Godavari District, Andhra Pradesh by M/s Vedanta Limited (Division of Cairn Oil and Gas)- Proposal no. IA/AP/IND2/102271/2013 29 Nov 2019
4.NA

The Committee, after deliberations, deferred the proposal for want of following additional information:-

ยท      &

06 Oct 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDilip Kumar Bera
DesignationSr. Manager - Environment
Name of Company (Applicant Name should not be given here)M/s Vedanta Limited(Division Cairn Oil & Gas)
Address4th Floor, Vipul Plaza, Suncity Sector 54, Gurgaon, Haryana - 122002
Print