| 1. | | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | | Details of Project: | | (a)Name of the project(s) | Expansion of Offshore and Onshore Oil and Gas Exploration, Development & Production in existing Ravva Field, PKGM-1 Block (of 331.26 km2) located near Surasniyanam Village (S. Yanam) in Krishna-Godava | | (b)Name of the Company / Organisation | M/s Vedanta Limited(Division Cairn Oil & Gas) | | (c)Registered Address | Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Gurgaon,Haryana-122002 | | (d)Legal Status of the Company | Private | | (e)Joint Venture | No | |
|
| 2. | | Address for the correspondence: | | (a)Name of the Applicant | Dilip Kumar Bera | | (b)Designation (Owner/ Partner/ CEO) | Sr. Manager - Environment | | (c)Address | Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,,Gurgaon,Haryana-122002 | | (d)Pin code | 122002 | | (e)E-mail | bhomaram.jat@cairnindia.com | | (f)STD Code. | 124(f)Telephone No. | 4594176 | | (g)Fax No. | 4145612 | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
| 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a.I)Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| | Minor Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| | (b)Category | A | | (c)Proposal Number | IA/AP/IND2/102271/2013 | | (d)Master Proposal Number(Single Window) | SW/102270/2019 | | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | | (f)Project Type | Expansion |
|
|
| 4. | | Location of the Project: | | (a)Plot/Survey/Khasra No. | Surasaniyan, Uppalaguptam, East Godavari District | | (b)Pincode | 533213 | | (c)Bounded Latitudes (North) | | | From | | | Degree | 16.3467 | | Minutes | | | Second | | | From | | | Degree | 16.5577 | | Minutes | | | Second | | | (d)Bounded Longitudes (East) | | | From | | | Degree | 82.1186 | | Minutes | | | Second | | | From | | | Degree | 82.3081 | | Minutes | | | Second | | | (e)Survey of India Topo Sheet No. | 65L3 and 65L6 | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | | (g)Maximum Elevation Above Means Sea Level(AMSL) | 7 | | (h)Uploaded (kml) File | Copy of Kml File  | | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | | (j)Seismic Zone | 3 | |
|
| 5. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Andhra Pradesh | |
|
|
| Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Orissa | Kendujhar | Barbil | Thakurani | |
|
| 6. | | Details of Terms of Reference (ToR)/EC: | | (a)MoEF&CC / SEIAA File Number | J-11011/41/2018-IA-II (I) | | (c)Date of Issue of TOR | 29 Aug 2013 | | (f)Previous TOR Letter | Copy of Previous TOR letter | | (b)Date of Apply of EC | 08 Jul 2019 | | (c)Date of Issue of EC | 15 Oct 2020 | | (d)Previous EC Letter | Copy of Previous EC letter | |
|
| 7. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | No | | (b)Whether details of Public Hearing available? | Yes | | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
| 7.1. Details of Public Hearing |
|---|
|
| S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
|---|
| (1.) | | | Copy of Public Hearing : | Copy of Public Hearing | | Date : | 11 Oct 2018 | | Distance of Public Hearing Venue from the Proposed Project : | 0.05 |
| At Beach Front, Surasaniyanam Beach Road | | State : | Andhra Pradesh | | District : | East Godavari | | Tehsil : | Uppalaguptam | | Village : | Surasaniyanam |
| 151 | Employment, CSR, Social Infrastructure Development | Others | Joint Collector & Additional District Magistrate, East Godavari District | |
| 8. | | Details of Project Configuration/Product: | | Details Not Applicable | |
|
| 9. | | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | | (a)Details of certified report on compliance of earlier environmental clearance condition | | (i)Certified Compliance By | SPCB | | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | | (iii)Letter No. | 14-R-1040/APPCB/ RO/KKD/2019-1913 | | (iv)Status of Compliance | Compiled | | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | | (vi)Date of site visit | Dec 28 2018 12:00AM | | (b)Details of Capacity Expansion | |
|
| S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
|---|
| (1.) | Crude Oil | 50000 | 0 | 50000 | Others | BOPD | Others | Pipelines | | (2.) | Natural Gas | 2.32 | 0 | 2.32 | Others | MMSCMD | Others | Pipeline | |
| | | (c)Details of Configuration | |
|
| S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
|---|
| (1.) | Onshore wellpads | 2 existing wellpads | 7 (including two existing wellpads) | 7 | Typical dimensions of each well pad of ~225m x ~170m | | (2.) | Onshore pipelines | Total pipeline length of 192 km in PKGM-1 Block | 15 Km | 15 Km pipeline corridor | 15 Km pipeline corridor will have 3 pipelines for well fluid, gas and subsurface injection water | | (3.) | Onshore and offshore well drilling | 55 exploratory and development wells | 83 exploration wells and 40 development wells | 83 exploration wells and 95 development wells | Exploration wells -73 offshore and 10 onshore and development wells - 17 offshore and 23 onshore | |
| 9.1. | | Details of Consent to Operate | | (i)Whether Consent to operate obtained ? | NA | | (ii)Copies of all Consent to operate obtained since inception | NA | | (iii)Date of Issue | 22 Jul 2016 | | (iv)Valid Upto | 31 Oct 2021 | | (v)File No. | APPCB/VSP/RJY/546/CFO/HO/2016 | | (vi)Application No. | APPCB/VSP/RJY/546/CFO/HO/2016 | | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
| 10. | | Project Cost: | | (a)Total Cost of the Project at current price level (in Crores) | 7924 | | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.0 | | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6 | | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.37 | |
|
| 11. | | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
| 12. | | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
| 13. | | Raw Material / Fuel Requirement: | | (a)Proposed quantity of raw material/fuel | 8 | | (b)Existing quantity of raw material/fuel | 0 | | (c)Total quantity of raw material/fuel | 8 | |
|
|   13.1. Raw Material / Fuel Profile |
|---|
| S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
|---|
| (1.) | Fuel Supply | 8 | Others | Cubic meter/day/well | Domestic Market | Road | | . | Others | Attached | Copy of Linkage | | (2.) | Drilling Chemicals | 200 | Others | Tons/Well | Domestic Market | Road | | . | Others | Attached | Copy of Linkage | | (3.) | Water | 85 | Others | Cubic meter/well | Ground water | Others | Pipelines | 15 | Others | Attached | Copy of Linkage | |
|
| 14. | | Baseline Data : | | (a)Period of Base Line Data Collection | FROM 06 Jan 2018 To 31 Mar 2018 | | (b)Season | Winter | |
|
| 14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
|---|
| (1.) | NOx | | Micro Gram per Meter Cube | 16.7 | 10.5 | 16.49 | 80 | | (2.) | Others | CO | Mili Gram per Meter Cube | 0.26 | 0.15 | 0.25 | 2 | | (3.) | SO2 | | Micro Gram per Meter Cube | 14.8 | 8.7 | 14.49 | 80 | | (4.) | PM10 | | Micro Gram per Meter Cube | 56.3 | 43.6 | 56.07 | 100 | | (5.) | PM2.5 | | Micro Gram per Meter Cube | 25.7 | 18.4 | 25.53 | 60 | |
| 14.2. No. of Ground Water monitoring locations : 4 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
|---|
| (1.) | TDS | | | mg/l | | 5334 | 397 | 500 | 2000 | | (2.) | Fluoride | | | mg/l | | 0.7 | 0.2 | 1 | 1.5 | | (3.) | pH | | | Others | NA | 7.4 | 7.1 | 6.5 | 8.5 | | (4.) | Total Hardness | | | mg/l | | 1086.40 | 165.20 | 200 | 600 | | (5.) | Chlorides | | | mg/l | | 1857.70 | 101.60 | 250 | 1000 | | (6.) | Heavy Metals | | Iron | mg/l | | 0.29 | 0.02 | 0.3 | 0.3 | | (7.) | TSS | | | mg/l | | . | . | 100 | 100 | | (8.) | Others | Sulphates | | mg/l | | 65.5 | 3.6 | 200 | 400 | |
| 14.3. No. of Surface Water monitoring locations : 4 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
|---|
| (1.) | DO | | mg/l | | 6.2 | 5.6 | D | | (2.) | BOD | | mg/l | | 3 | 3 | D | | (3.) | COD | | mg/l | | . | . | D | | (4.) | pH | | NA | | 8.2 | 7.2 | D | | (5.) | Others | TSS | mg/l | | 35 | 17 | D | |
| 14.4. No. of Ambient Noise monitoring locations : 8 |
|---|
| S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
|---|
| (1.) | Leq(Day) | A-weighted decibels(dB(A)) | 59.4 | 50 | 65 | | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 50.7 | 40.8 | 55 | |
| 14.5. No. of Soil Sample Monitored locations : 5 |
|---|
| S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
|---|
| (1.) | pH | | | 7.5 | 6.1 | | (2.) | K(Potassium) | Milligram per Kilogram | | . | . | | (3.) | N(Nitrogen) | Milligram per Kilogram | | 179.1 | 24.6 | | (4.) | P(Phosphorus) | Milligram per Kilogram | | 145.2 | 12.6 | | (5.) | Electric Conductivity | Others | Micro Siemens Per Cm | 2350 | 321 | |
|
| 14.6. | | Details of Ground Water Table: | | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 2 | | (c)Whether Ground Water Intersection will be there ? | No | |
|
| 15. Details of Water Requirement (During Operation) |
|---|
| S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
|---|
| (1.) | GroundWater | | 18214 | 8 | Copy of Permission Letter | Pipeline | | Others | Bore wells | 19/RD/SLNA/STE/APWALTA-NOC/2016 | 03 Jan 2018 | 10413 | |
|
| 15.1. | | (a)Whether Desalination is proposed | No | |
|
| 16. Waste Water Management(During Operation) |
|---|
| S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
|---|
| (1.) | Drilling wash waste water per well (onshore) | 5 | 3000 | ETP of 3,000 KL/day (Ravva Terminal) | Reuse within the Plant & Recycling | | 5 | | | (2.) | Bilge water per well (offshore) | 10 | 500 | Treated onboard before disposal offshore conforming to the MARPOL requirements | Discharge into Seawater Body | | | 10 | | (3.) | Sewage per well (offshore) | 30 | 100 | Treated on-board STP before discharge conforming to MARPOL requirements | Discharge into Seawater Body | | | 30 | | (4.) | Drilling wash waste water per well (offshore) | 200 | 500 | Treated onboard before disposal offshore conforming to the MARPOL requirements | Discharge into Seawater Body | | | 200 | | (5.) | Sewage per well (Onshore) | 4.5 | 175 | STP of 175 KL/day (Ravva Terminal) | Reuse within the Plant & Recycling | | 4.5 | | |
|
| 16.1. | | (a)Total Waste Water Generation (Kilolitre per Day) | 249.5 | | (b)Total Discharged Water (Kilolitre per Day) | 240 | | (c)Total Reused Water (Kilolitre per Day) | 9.5 | |
|
| 17. Solid Waste Generation/Management |
|---|
| S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
|---|
| (1.) | Drill Cutting per Well Onshore | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 250 | Kilolitre | 220 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (2.) | Spent Drilling Mud per Well Onshore | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 200 | Kilolitre | 220 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (3.) | Spent Lubricating Oil per Well Onshore | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 10 | Kilolitre | 220 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (4.) | Spent Drilling Mud per Well Offshore | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 150 | Kilolitre | . | Others | Service vessels and road transport | Others | As per MoEFCC Guidelines | | (5.) | Drilling Cuttings per Well Offshore | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 220 | Kilolitre | . | Others | Service vessels and road transport | Others | As per MoEFCC Guidelines | | (6.) | Food Waste per day offshore | Municipal Solid Waste | | .025 | Tons | . | Others | Not required | Others | Discharged offshore as per MoEFCC Guidelines | | (7.) | Food Waste per Day Onshore | Municipal Solid Waste | | 0.025 | Tons | 8 | Road | | Others | Composting in-house or to be sent to piggeries | | (8.) | Spent Lubricating Oil per Well Offshore | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5 | Kilolitre | 220 | Others | Service vessels and road transport | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
| 18.1. Air Quality Impact Prediction |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
|---|
| (1.) | SO2 | | Microgram per Meter Cube | 14.4 | . | 0.41 | 14.82 | 80 | | (2.) | NOx | | Microgram per Meter Cube | 16.4 | . | 14.8 | 31.3 | 80 | | (3.) | Others(Specify) | CO | Microgram per Meter Cube | 253 | . | 18.2 | 271.3 | 2000 | | (4.) | PM10 | | Microgram per Meter Cube | 55.3 | . | 0.46 | 55.8 | 100 | | (5.) | PM2.5 | | Microgram per Meter Cube | . | . | . | . | . | |
|
| 18.2. Stack Details |
|---|
| S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
|---|
| (1.) | DG Set (1010 KVA) at wellpad for well drilling | Diesel | 10 | 0.305 | NOx | | 0.89 | | (2.) | DG Set (350 KVA) at wellpad for well drilling | Diesel | 7 | 0.305 | NOx | | 0.311 | | (3.) | DG Set (1010 KVA) at wellpad for well drilling | Diesel | 10 | 0.305 | Others | CO | 0.78 | | (4.) | DG Set (350 KVA) at wellpad for well drilling | Diesel | 7 | 0.305 | PM10 | | 0.0156 | | (5.) | DG Set (350 KVA) at wellpad for well drilling | Diesel | 7 | 0.305 | SO2 | | 0.0272 | | (6.) | DG Set (350 KVA) at wellpad for welldrilling | Diesel | 7 | 0.305 | Others | CO | 0.272 | | (7.) | Temporary flare stack at wellpad for well drilling | Gas | 30 | 0.4 | SO2 | | 0.002 | | (8.) | Temporary flare stack at wellpad for well drilling | Gas | 30 | 0.4 | Others | CO | 1.042 | | (9.) | DG Set (1010 KVA) at wellpad for well drilling | Diesel | 10 | 0.305 | PM10 | | 0.044 | | (10.) | Temporary flare stack at wellpad for well drilling | Gas | 30 | 0.4 | PM10 | | 0.0893 | | (11.) | Temporary flare stack at wellpad for well drilling | Gas | 30 | 0.4 | NOx | | 0.1935 | | (12.) | DG Set (1010 KVA) at wellpad for well drilling | Diesel | 10 | 0.305 | SO2 | | 0.078 | |
|
| 19. | | Power Requirement: | | (a)Quantity (Kilo Volt Amps (kVA)) | 10450 | | (b)Source | Onshore drilling / well, DG Sets of 3 x 1000 kVA ( | | (c)Uploaded Copy of Agreement | Copy of Agreement | | (d)Standby Arrangement (Details of DG Sets) | Onshore drilling per well, standby arrangements in | | (e)Stack Height (in m) | 10 | |
|
| 20. | | Land Ownership Pattern: | | (a)Forest Land (ha.) | 417 | | (b)Private Land (ha.) | 1536 | | (c)Government Land (ha.) | 0 | | (d)Revenue Land (ha.) | 0 | | (e)Other Land (ha.) | 31173 | | Total Land (ha.) | 33126 | |
|
| 21. | | Present Land Use Breakup of the Study Area in Ha: | | (a)Agriculture Area (ha.) | 13059 | | (b)Waste/Barren Land (ha.) | 0 | | (c)Grazing/ Community Land (ha.) | 0 | | (d)Surface Water Bodies (ha.) | 17799 | | (e)Settlements (ha.) | 1018 | | (f)Industrial (ha.) | 0 | | (g)Forest (ha.) | 4807 | | (h)Mangroves (ha.) | 1157 | | (i)Marine Area (ha.) | 61824 | | (j)Others (ha.) : Casaurina plantation, sand dunes, mudfalts and roa | 2959 | | Total (ha.) | 102623 | |
|
| 22. Land requirement for various activities |
|---|
| S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
|---|
| (1.) | Others | Onshore wellpad, pipelines and access roads | 47 | 23 ha (wellpads) 16.5 ha (pipelines) 7.5 ha (road) | |
|
|
| 23. | | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
| 23.1. Details of Ecological Sensitivity : |
|---|
| S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Critically Polluted Area | Visakhapatnam | 220 | Nearest distance from the Block | | (2.) | ESAs | Coringa Wildlife Sanctuary | 25 | From nearest proposed well (E-11) | | (3.) | Wildlife Corridors | Coringa Wildlife Sanctuary | 25 | From nearest proposed well (E-11) | | (4.) | NPA | Hope Island | 41 | Nearest distance from the Block | | (5.) | Corridors | Coringa Wildlife Sanctuary | 25 | From nearest proposed well (E-11) | | (6.) | WLS | Coringa Wildlife Sanctuary | 25 | From nearest proposed well (E-11) | | (7.) | ESZs | Coringa Wildlife Sanctuary | 25 | From nearest proposed well (E-11) | |
| 23.2. Details of Environmental Sensitivity : |
|---|
| S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Forest | | Kandikoppa Reserve Forest | 7 | Nearest distance from existing Ravva Terminal | | (2.) | Defence Installations | | Eastern Command Naval Base, Visakhapatnam | 220 | Nearest distance from the Block | | (3.) | Archaeological Sites | | Adurru Budhist Site | 35 | Nearest distance from the Block | |
|
| 23.3. | | (a)Whether Noc / Permission from the competent authority is required? | No | | (b)Whether NBWL recommendation is required? | No | |
|
| 24. | | Forest Land: | | Whether any Forest Land involved? | No | |
|
| 25. | | Tree Cutting: | | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
| 26. | | Land Acquisition Status: | | (a)Acquired Land(Ha) | 0 | | (b)Land yet to be acquired(Ha) | 47 | | (c)Status of Land acquisition if not acquired | Land uptake will be initiated after receipt of EC | |
|
| 27. | | Rehabilitation and Resettlement (R&R): | | (a)No. of Villages | 0 | | (b)No. of Households | 0 | | (c)No. of PDFs (Project Displaced Families) | 0 | | (d)No. of PAFs (Project Affected Families) | 0 | | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | | (f)Status of R&R | Yet To Start | |
|
| 28. | | Details of Presence of Schedule-I Species: | | (a)Whether there is Presence of Schedule-I Species ? | Yes | | (i)Details of Schedule-I Species | Olive ridley turtle, Indian flapshell turtle, Monitor lizard, Osprey, Brahminy kite, Shikra , Pariah kite, Fishing Cat and Indian Pangolin | | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | | (i)Uploaded copy of conservation plan | Copy of conservation plan | | (ii)Fund Provision made | Yes | | (iii)Period of Implementation | 2019 - 2024 | | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
| 29. | | Details of Presence of Water Bodies in Core Area: | | (a)Whether there is Presence of Water Bodies in Core Area ? | No | | (b)Whether there is Diversion Required ? | No | | (c)Whether permission has been obtained from competent authority ? | No | |
|
| 30. | | Details of Presence of Water Bodies in Buffer Area: | | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | | (i)Details of Water Bodies in Buffer Area | Vrudha Gautami River, Nilarevu River and Vainateyam Godavari River | | (ii)Direction of Water Bodies in Buffer Area | East | | (iii)Distance of Water Bodies in Buffer Area | 4 | |
|
| 31. | | Manpower Requirement: | | (a)Permanent Employment-During Construction | 0 | | (b)Permanent Employment-During Operation | 0 | | (c)Temporary Employment- During Construction | 0 | | (d)Temporary Employment- During Operation | 0 | | (e)No. of working days | 0 | | (f)Total Manpower | 0 | |
|
|
| S. No. | Description | Existing | Proposed | Total |
|---|
| (1.) | Total Area of Green Belt | 79 | 3 | 82 | | (2.) | Percentage of Total Project Area | 35 | 1 | 36 | | (3.) | No. of Plants | 13000 | 2000 | 15000 | | (4.) | Funds Allocated | 4000000 | 200000 | 4200000 | |
|
| 33. Project Benefits |
|---|
| S. No. | Type of Project Benefits | Details of Project Benefits |
|---|
| NIL | |
|
|
| 1. | | Project Details: | | (a)CRZ Classification | IB | | (b)Location Type | Non-Eroding Coast | | (c)Details of Mangroves Land Involved, if Any | Nil | | (d)Area of Mangroves Land (hectare) | 0 | | (e)EIA (Terrestrial) Studies | Carried Out | | (i)Summary Details of EIA (Terrestrial) Studies | Covered in the EIA Study Report as enclosed | | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | | (iii)Period of Study from (EIA Terrestrial) | 01 Jan 2018 | | (iv)Period of Study To (EIA Terrestrial) | 30 Apr 2018 | | (f)EIA (Marine) Studies | Carried Out | | (i)Summary Details of EIA (Marine) Studies | Covered in the EIA Study Report as enclosed | | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | | (iii)Period of Study from (EIA Marine) | 01 Jan 2018 | | (iv)Period of Study to (EIA Marine) | 30 Apr 2018 | | (g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan | The Oil Spill Contingency Plan for PKGM-1 (Ravva) | |
|
| 2. | | Description of the Project Under Consideration: | | (a)Type of Project | Others | | (i)Agency Name for Preparing CRZ Maps | National Center for Sustainable Coastal Management | | (ii)Please Specify with salient features | Drilling of 123 wells. In the onshore drilling of | | (iii)Uploaded relevent Document | Copy of relevent Document | |
|
| 3. | | Distance of Project (in meters) from ltl/htl to be stated : | | (a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity | IB | | (b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? | Yes | | (i)Distance of Project (in meters) from HTL to be Stated | 100 | | (ii)Uploaded Maps(Shape File) | Copy of Maps | | (iii)Distance of Project(in meters) from LTL to be Stated | 250 | | (iv)Uploaded Maps(Shape File) | Copy of Maps | | (c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? | Yes | | (i)Uploaded Maps (Shape File) | Copy of Maps | | (d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? | Yes | | (i)Uploaded Maps (Shape File) | Copy of Maps | | (e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared | Yes | | (i)Uploaded Maps (kml File) | Copy of Maps | | (f)NOC from State Pollution Control Boards Obtained | Yes | | (i)Copy of NOC | Copy of NOC | | (g)Details of Rain Water Harvesting System | | |
|
| 4. | | Recommendation of State Coastal Zone Management Authority: | | (a)Copy of CZMA | Copy of CZMA | | (b)State the Conditions Imposed | As enclosed | | (c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) | As enclosed | |
|
| 35. Sector Specific Details : NOT APPLICABLE |
| 35. Sector Specific Details For Industrial Projects - 2 |
|
|
| 36. | | Details of Court Cases: | | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
| 37. | | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
| 38. | | Details of EIA Consultant: | | (a)Have you hired Consultant for preparing document? | Yes | | (i)Accreditation No. | NABET/EIA/1619/RA 0055 | | (ii)Name of the EIA Consultant | ERM India Private Limited | | (iii)Address | Building 10, Tower - A, 4th Floor, DLF Cyber City, Gurgaon | | (iv)Mobile No. | 9810112106 | | (v)Landline No. | 0124417030 | | (vi)Email Id | neena.singh@erm.com | | (vii)Category of Accreditation | A | | (viii)Sector of Accreditation | Industrial Projects - 2 | | (ix)Validity of Accreditation | 31 Oct 2019 | | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
| Essential Detail Sought: |
|---|
| Sno. | EDS Letter | Remarks | Date of EDS |
|---|
| 1. | NA | Please inform/clarify the following:-
- Entry at column 9(b) of Form-2 for EC shows the existing oil and gas production as 50000 bopd & 2.32 MMSCMD. There being no incremental production reflected therein, the proposal for expansion is not justified but actually misleading.
- Details of project configuration mentioned in column 9(c) of Form-2 are to be consistent with the ECs issued from time time. The same needs to be established with the pictorial presentation, clearly showing different activities in onshore/offshore blocks separately.
- Recommendations of SCZMA.
- Proposals for amendment in EC dated 23/2/2015 & CRZ clearance dated 24/5/2017 to be submitted separately, and not be clubbed with the present proposal. | 15 Jun 2019 | | 2. | NA | The correction have been made as per the instruction received | 18 Jun 2019 | | 3. | NA | No reply to our observations dated 15/6/2019 found uploaded on the portal. Please do the needful for consideration of the proposal. | 06 Jul 2019 | | 4. | NA | The correction have been made as per the instruction received | 08 Jul 2019 | |
| Additional Detail Sought: |
|---|
| Sno. | ADS Letter | Remarks | Date of ADS |
|---|
| 1. | ADS Reply Letter | ADS Response 15-EAC-IA-II-Ag 15.5.12 and Revised EIA Volume 1 and 2 for Vedanta-Cairn's Proposed Expansion in PKGM-1 Block in Andhra Pradesh | 04 Jun 2020 | | 2. | NA | The EAC,
during deliberations noted that the project
details mentioned in the Form2/EIA report were not consistent with that
presented during the meeting. The project proponent has also desired to drop
few wells whichbelong to ONGC onland area and PP do not have permission from
DGH. | 15 Jan 2020 | | 3. | ADS Reply Letter | Submission of the requested information sought during 11th EAC meeting held between 28-29 August 2019 agenda item no. 11.5.3 regarding the EC and CRZ clearances of "Expansion of Offshore and Onshore Oil and Gas Exploration, Development & Production in existing Ravva Field, PKGM-1 Block (of 331.26 km2) located near Surasaniyanam Village (S. Yanam) in Krishna- Godavari Basin, East Godavari District, Andhra Pradesh by M/s Vedanta Limited (Division of Cairn Oil and Gas)- Proposal no. IA/AP/IND2/102271/2013 | 29 Nov 2019 | | 4. | NA | The
Committee, after deliberations, deferred the proposal for want of following
additional information:- ยท & | 06 Oct 2019 | |
| | Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| | | Name of Applicant | Dilip Kumar Bera | | Designation | Sr. Manager - Environment | | Name of Company (Applicant Name should not be given here) | M/s Vedanta Limited(Division Cairn Oil & Gas) | | Address | 4th Floor, Vipul Plaza, Suncity
Sector 54, Gurgaon, Haryana - 122002 |
|