1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Garjanbahal OCP Expansion | (b)Name of the Company / Organisation | GARJANBAHAL OCP MAHANADI COALFIELDS LIMITED | (c)Registered Address | General Manager Basundhara area. Sundergarh,,Sundargarh,Orissa-770076 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ajay Namjoshi | (b)Designation (Owner/ Partner/ CEO) | General Manager Mining | (c)Address | At- Garjanbahal OCP, Basundhara Area, PO- Balinga, Tehsil- Hemgir,,Hemgir,Sundargarh,Orissa-770076 | (d)Pin code | 770076 | (e)E-mail | pogocp2018@gmail.com | (f)STD Code. | 0(f)Telephone No. | | (g)Fax No. | 286144 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/OR/CMIN/272126/2022 | (d)Master Proposal Number(Single Window) | SW/272119/2022 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Attached in EIA/EMP Annexures-AnnexureXIII | (b)Pincode | 770076 | (c)Bounded Latitudes (North) | | From | | Degree | 22 | Minutes | 01 | Second | 16 | From | | Degree | 22 | Minutes | 02 | Second | 52 | (d)Bounded Longitudes (East) | | From | | Degree | 83 | Minutes | 43 | Second | 34 | From | | Degree | 83 | Minutes | 45 | Second | 14 | (e)Survey of India Topo Sheet No. | 64 N/12 & 64N/16, RF1:50000 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 322 | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | 1.8 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Orissa | Sundargarh | Hemgir | Garjanbahal, Balinga, Karlikachhar, Bankibahal, Bangurkela, Tumulia. | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | No.101-976/EPE/2244 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Oct 30 2021 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Area | 795.38 | 0 | 795.380 | Hectares(ha) | | Road,Rail | | (2.) | coal | 15.6 | 2.6 | 18.200 | Others | MTPA | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Opencast Coal Mining through surface miner | 15.6 | 2.6 | 18.2 | Surface Miner (800-100 HP) in combination with Shovel Dumber and Front end Loader Dumper. | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 17 Mar 2022 | (iv)Valid Upto | 31 Mar 2023 | (v)File No. | 4216/IND-I-CON-6641 | (vi)Application No. | 3955795, Dt.13.02.2022 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1482.24 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 29.88 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 10.69 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 51.71 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 91.3 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 91.3 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | High Speed Diesel | 91.3 | Kilo Litre per Day | | local | Road | | 0 | Fuel Supply Agreement | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.48 To 5.67 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.91 To 4.17 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | CGWA/NOC/MIN/ORIG/2021/13468 | (f)Date of Issue | 22 Oct 2021 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Mine Sump | 3294 | 0.5 | Copy of Permission Letter | Pipeline | | Others | Pumping | CGWA/NOC/MIN/ORIG/2021/13468 | 22 Oct 2021 | 1910 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Workshop | 380 | 450 | ETP | Reuse within the Plant & Recycling | | 380 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 380 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 380 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | overburden | Industrial Waste | | 3959946 | Tons | 2 | Road | | Others | Backfilling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 39.6 | 0.6 | 20.26 | 59.86 | 120 | (2.) | PM10 | | Microgram per Meter Cube | 96.4 | 0.7 | 12.88 | 109.28 | 250 | (3.) | PM2.5 | | Microgram per Meter Cube | 54.10 | 0.7 | 1.55 | 55.65 | 0 | (4.) | SO2 | | Microgram per Meter Cube | 34.40 | 0.6 | 13.92 | 48.32 | 120 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | Others | NA | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 53.68 | (b)Source | 220/33KV Substation ,GARJANBAHAL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 88.9 | (b)Private Land (ha.) | 398.65 | (c)Government Land (ha.) | 166.28 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 141.55 | Total Land (ha.) | 795.38 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 494.54 | (b)Waste/Barren Land (ha.) | 205.11 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 3.84 | (e)Settlements (ha.) | 2.99 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 88.9 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 795.3800 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 389.82 | | (2.) | Township | | 33.05 | | (3.) | OB Dump Area | | 62.58 | | (4.) | Built Up Area | | 49.66 | | (5.) | Green belt | | 32.54 | | (6.) | Safety Zone | | 5.17 | | (7.) | Others | Temp. Top soil storage, R&R | 222.56 | Top soil storage, R&R | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | NA | 0 | Not applicable | (2.) | Corridors | NA | 0 | Not applicable | (3.) | Critically Polluted Area | NA | 0 | Not applicable | (4.) | ESZs | NA | 0 | Not applicable | (5.) | Wildlife Corridors | NA | 0 | Not applicable | (6.) | WLS | NA | 0 | Not applicable | (7.) | NPA | NA | 0 | Not applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Lalma forest | 1.9 | within 5 km of the project boundary | (2.) | Defence Installations | | NA | 0 | Not applicable | (3.) | Others | NA | NA | 0 | Not applicable | (4.) | Archaeological Sites | | NA | 0 | Not applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 795.38 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 5 | (b)No. of Households | 1355 | (c)No. of PDFs (Project Displaced Families) | 1144 | (d)No. of PAFs (Project Affected Families) | 1298 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 14607.50 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | An unnamed seasonal stream was flowing through the low-lying areas of the property. The water flow was covering the surface run-off water and going towards along the north-east of the property. During mining operation, the seasonal stream of a span of 930 m diverted along the toe of the external OB dump for flow of surface run-off water from the catchment area. The diversion of the stream has been done for uninterrupted operation of the mine. | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Basundhara river | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 1.8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 1567 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 1567 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 462.99 | 0 | 462.99 | (2.) | Percentage of Total Project Area | 58.2 | 0 | 58.2 | (3.) | No. of Plants | 861608 | 0 | 861608 | (4.) | Funds Allocated | 515109000 | 0 | 515109000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Development of better land use during post closure activities for sustainable growth of the local area. Enhancement of the green cover. | (2.) | Social | Project will lead to development of ancillary industries and an overall economic growth of nearby towns to supplement the population of the area. Project proponent will ensure to connect even last people with the infrastructural facility like educational, health, road etc in the locality. Other needs and social-economic aspects of local inhabitants will be dealt with CSR activities in the region as per the schedule VII activities of Company Act, 2013 | (3.) | Financial | Contribution to the exchequer (both State and Central Govt). Overall economic growth of the country. To ensure regular supply of coal to critical and super critical power plants and to avoid discontinuity of mining and. idling of resources & precious Forex saving. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 18.2MTPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | MCL/SBP/CS/BD-238/Exct/2021/12042 | (b)Date of Approval | 16 Oct 2021 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | Board of Directors of MCL | (e)Approved Mining Lease Area | 653.83 | (f)Approved Capacity | 18.2 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 333.97 | (b)Mineable Reserves (Million Ton) | 187.19 | (c)Extractable Reserves(Million Ton) | 187.19 | (d)Percent(%) of Extraction | 66.7 | (e)Grade of Coal /Ore /Mineral | G13 | (f)Stripping Ratio | 1.05 : 1 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | Not applicable | (h)Average Gradient(Degree) | 3-7 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 10 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 2 | (c)Thickness of seams to be worked on | 15.41 | (d)Maximum Thickness of Seams (metres) | 26.37 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 653.83 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Acquired under CBA(A&D) act 1957 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Acquired under CBA(A&D) act 1957 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Acquired under CBA(A&D) act 1957 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 3 | (ii)Total Area (in Hectare) | 62.58 | (iii)Height (in meter) | 80 | (iv)Quantity (in Million Cubic meter) | 13.77 | (v)No. of year back fill up | 12 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 1 | (ii)Total Area (in Hectare) | 289.38 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 204.59 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 1.20 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 1.01 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0.19 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 100.44 | (b)Depth (in meter) | 140 | (c)Volume (in Million Cubic meter) | 100.44 | |
|
12. | Details of Quarry: | (a)Final Void of 100.44 (hectare) at a Depth of 140 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 389.82 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Tippers | (b)Surface to Siding/Loading | Conveyor and Tipper | (c)Transportation / Conveyor Details | Road and Rail | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | SURFACE WATER BODIES | | 3.84 | 0 | 3.84 | (2.) | FOREST LAND | | 88.9 | 0 | 88.9 | (3.) | GRAZING LAND | | 0 | 0 | 0 | (4.) | SETTLEMENTS | | 2.99 | 0 | 2.99 | (5.) | AGRICULTURE LAND | | 398.65 | 95.89 | 494.54 | (6.) | WASTE LAND | | 159.45 | 45.66 | 205.11 | |
TOTAL | 653.83 | 141.55 | 795.38 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (2.) | BUILT UP AREA (COLONY/OFFICE) | | 9.93 | 0 | 39.73 | | 49.66 | (3.) | GREEN BELT | | 37.71 | 0 | 0 | | 37.71 | (4.) | VIRGIN AREA | | 0 | 0 | 79.06 | | 79.06 | (5.) | EXCAVATION/QUARRY | | 230 | 20 | 139.82 | | 389.82 | (6.) | TOP SOIL STORAGE | | 35 | 0 | 0 | | 35 | (7.) | EXTERNAL OB DUMPS | | 62.58 | 0 | 0 | | 62.58 | (8.) | ROADS | | 0 | 0 | 0 | | 0 | (9.) | Other | outside lease area R&R etc | 28.31 | 0 | 113.24 | | 141.55 | |
TOTAL | 403.53 | 20 | 371.85 | 0 | 795.38 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 62.58 | (b)Internal Dump(in hectare) | 239.38 | (c)Quarry(in hectare) | 389.82 | (d)Safety Zone(in hectare) | 5.17 | (e)Final Void of 100.44 (hectare) at a Depth of 140 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 77.47 | (h)Total afforestation plant (in hectare) | 434.6 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2018 | 13 | 4 | 13 | 2.81 | 0 | (2.) | 2019 | 13 | 10 | 13 | 7.59 | 0 | (3.) | 2020 | 13 | 13 | 13 | 11.77 | 0 | (4.) | 2021 | 15.6 | 14 | 18.2 | 13.55 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/SA0108 | (ii)Name of the EIA Consultant | CMPDI | (iii)Address | Godwana Palace, Kanke Road Ranchi, jharkand-834031 | (iv)Mobile No. | 8987788797 | (v)Landline No. | 0651223005 | (vi)Email Id | gmenv.cmpdi@coalindia.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 22 Aug 2024 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The application has been examined inlight of OM dated 7th April, 2022. Accordingly, following are required to be submitted.
1. Revised EIA/EMP based on Standard ToR instead of Addendum EIA
2. Latest certified compliance report of last EC from IRO
3. Full documents of Revised Mine Plan and Mine Closure Plan with enhanced capacity
4.EIA shall be submitted based on the capacity achieved on last EC. | 18 May 2022 | 2. | Eds Reply Letter | Reply to EDS dated 18.05.2022 is submitted herewith for kind consideration. | 26 Jan 2023 | 3. | NA | The proposal has been examined and following are emerged.
1. EC for expansion was granted on 14th February, 2022 for increase in production capacity from 13 MTPA to 15.6 MTPA under OM dated 15.09.02017 (with exemption in Public Hearing- 20% expansion) with following condition:
(iv) PP shall implement in-pit conveyor system with silo loading facility till railway siding and No road transportation shall be allowed after December, 2022 and accordingly, SPCB shall not grant CTO for road transportation after December, 2022
2. PP has also obtained amendment in EC on 12th January, 2023 with certain terms and conditions related to fleet size, which also includes the condition that: No further expansion in production capacity to this project shall be granted till the compliance of EC conditions dated 14.02.2022 and MoEF&CC granted this EC amendment for complying the condition till October, 2023.
3. Further, there is court case (no. OA 236/2022) and as per the Order of the Hon’ble NGT dated 30.03.2022.
PP may submit the application with certified compliance report of EC dated 12.01.2023 from IRO with action taken report and status of para-3. | 01 Feb 2023 | 4. | NA | The proposal has been examined and following are emerged.
1. EC for expansion was granted on 14th February, 2022 for increase in production capacity from 13 MTPA to 15.6 MTPA under OM dated 15.09.02017 (with exemption in Public Hearing- 20% expansion) with following condition:
(iv) PP shall implement in-pit conveyor system with silo loading facility till railway siding and No road transportation shall be allowed after December, 2022 and accordingly, SPCB shall not grant CTO for road transportation after December, 2022
2. PP has also obtained amendment in EC on 12th January, 2023 with certain terms and conditions related to fleet size, which also includes the condition that: No further expansion in production capacity to this project shall be granted till the compliance of EC conditions dated 14.02.2022 and MoEF&CC granted this EC amendment for complying the condition till October, 2023.
3. Further, there is court case (no. OA 236/2022) and as per the Order of the Hon’ble NGT dated 30.03.2022.
PP may kindly submit the application with certified compliance report of EC dated 12.01.2023 from IRO with action taken report and status of para-3. | 01 Feb 2023 | 5. | Eds Reply Letter | Reply to EDS dated 01.02.2023 is hereby submitted for kind consideration. | 03 Feb 2023 | 6. | NA | It is to be noted that reply of EDS dated 1.02.2023 has not been submitted. Kindly reply to the observation as raised in EDS (mentioned below):
The proposal has been examined and following are emerged. 1. EC for expansion was granted on 14th February, 2022 for increase in production capacity from 13 MTPA to 15.6 MTPA under OM dated 15.09.02017 (with exemption in Public Hearing- 20% expansion) with following condition: (iv) PP shall implement in-pit conveyor system with silo loading facility till railway siding and No road transportation shall be allowed after December, 2022 and accordingly, SPCB shall not grant CTO for road transportation after December, 2022 2. PP has also obtained amendment in EC on 12th January, 2023 with certain terms and conditions related to fleet size, which also includes the condition that: No further expansion in production capacity to this project shall be granted till the compliance of EC conditions dated 14.02.2022 and MoEF&CC granted this EC amendment for complying the condition till October, 2023. 3. Further, there is court case (no. OA 236/2022) and as per the Order of the Hon’ble NGT dated 30.03.2022. PP may kindly submit the application with certified compliance report of EC dated 12.01.2023 from IRO with action taken report and status of para-3. | 11 Feb 2023 | 7. | Eds Reply Letter | EDS reply dtd 11.02.2023 is attached herewith for kind consideration. | 11 Feb 2023 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ajay Namjoshi | Designation | General Manager Mining | Name of Company (Applicant Name should not be given here) | GARJANBAHAL OCP MAHANADI COALFIELDS LIMITED | Address | General Manager Basundhara area. Sundergarh |
|