1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Integrated Steel Plant (1.2 Million TPA to 2.0 Million TPA Finished Steel) with 270 MW Captive Power Plant | (b)Name of the Company / Organisation | ORISSA ALLOY STEEL PVT. LTD. | (c)Registered Address | ROOM NO 3 B, 1 , GARSTIN PLACE,KOLKATA,Kolkata,West Bengal-700001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | BIJAYEN SRIVASTAVA | (b)Designation (Owner/ Partner/ CEO) | SENIOR MANAGER | (c)Address | ROOM NO 3B, 1 GARSTIN PLACE,KOLKATA,Kolkata,Kolkata,West Bengal-700001 | (d)Pin code | 700001 | (e)E-mail | orissaalloysteelprivateltd@gmail.com | (f)STD Code. | 33(f)Telephone No. | 22895200 | (g)Fax No. | 22438517 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | 4(b) Coke oven plants
| (b)Category | A | (c)Proposal Number | IA/WB/IND/261449/2021 | (d)Master Proposal Number(Single Window) | SW/261438/2022 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 1 | (b)Pincode | 721301 | (c)Bounded Latitudes (North) | | From | | Degree | 22 | Minutes | 21 | Second | 27 | From | | Degree | 22 | Minutes | 22 | Second | 14 | (d)Bounded Longitudes (East) | | From | | Degree | 87 | Minutes | 17 | Second | 48 | From | | Degree | 87 | Minutes | 18 | Second | 41 | (e)Survey of India Topo Sheet No. | F45J7 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 35 | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | 2.9 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | West Bengal | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | West Bengal | West Medinipur | Kharagpur - I | Gokulpur | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/169/2017-IA.Ii(I) | (c)Date of Issue of TOR | 08 Apr 2021 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 12 May 2022 | (c)Date of Issue of EC | 10 Aug 2022 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 13 Aug 2021 | Distance of Public Hearing Venue from the Proposed Project : | 3.5 |
| Mahasakti Mahasangha, Satkui, P.O. Matkatpur (near BDO Office Kharagpur-I), Dist - Paschim Medinipur, West Bengal | State : | West Bengal | District : | West Medinipur | Tehsil : | Kharagpur - I | Village : | Satkui |
| 59 | 1) Environment – APCD, Pollution Control, Housekeeping 2) Employment 3) Drinking water facilities 4) Education 5) Road development 6) CSR Activities related etc. | Others | Additional District Magistrate LR & DL&LRO, Paschim Medinipur | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Kolkata | (iii)Letter No. | 102-616/18/EPE/115 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Feb 21 2022 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Oxygen from Oxygen Plant | 200 | 400 | 600.000 | Others | TPD | Others | Pipeline | (2.) | Pig Iron | 1700 | 500 | 2200.000 | Others | TPD | Road,Rail | Pipeline | (3.) | DRI | 0.744 | 1.056 | 1.800 | Others | Million TPA | Road,Rail,Conveyor Belt | Pipeline | (4.) | Slag crusher | 0 | 100 | 100.000 | Others | TPD | Road | | (5.) | Liquid steel from IF | 1 | 0.8 | 1.800 | Others | Million TPA | Rail | | (6.) | Producer Gas | 150000 | 45000 | 195000.000 | Others | Nm3/hr | Others | Pipe | (7.) | Calcined Lime/dolomite | 200 | 0 | 200.000 | Others | TPD | Road | | (8.) | Jigging Plant | 0 | 30 | 30.000 | Others | TPD | Road,Rail | | (9.) | DI Pipe, fitting & Accessories from DIP Plant | 0.2 | 0 | 0.200 | Others | Million TPA | Road,Rail | | (10.) | Chrome Briquette | 40 | 0 | 40.000 | Others | TPH | Road,Rail | | (11.) | CRM with pickling and Galvanising | 0.35 | -0.35 | 0.000 | Others | Million TPA | Rail | | (12.) | Pellet with matching Beneficiation/ Wet Grinding | 2.4 | 8.6 | 11.000 | Others | Million TPA | Road,Conveyor Belt,Pipe Conveyor | | (13.) | TMT Bar, Wire & Wire Rod | 0.6 | 1.2 | 1.800 | Others | Million TPA | Road,Rail | Pipeline | (14.) | Hot metal from MBF | 0.6 | 0.17 | 0.770 | Others | Million TPA | Others | Torpedo and Ladle car | (15.) | Coke | 0.5 | 0.05 | 0.550 | Others | Million TPA | Conveyor Belt | | (16.) | Sinter | 0.6 | 0.24 | 0.840 | Others | Million TPA | Conveyor Belt | Pipeline | (17.) | CPP | 194 | 76 | 270.000 | Mega Watt(MW) | | Others | Cable | (18.) | Railway Siding | 1 | 0 | 1.000 | Others | Number | Rail | Pipeline | (19.) | Liquid steel from LD | 0 | 0.77 | 0.770 | Others | Million TPA | Rail | Pipeline | (20.) | Ferro Alloy | 0.048 | 0.03 | 0.078 | Others | Million TPA | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | DR Plant | 4 x 600 TPD | 2 x 1200 TPD | 4 x 600 + 2 x 1200 TPD | | (2.) | SMS | 10 x 20 T EIF + 2 x 50 T EAF | 12 x 30 T EIF + 5 x 30 T EIF - 2 x 50 T EAF | (10 x 20 T + 12 x 25 T + 5 x 30 T) EIF | 2 x 50 T EAF dropped | (3.) | SMS Slag Crusher | Nil | 2 x 25 T | 2 x 25 T | | (4.) | Jigging Plant | Nil | 2 x 15 TPD | 2 x 15 TPD | | (5.) | Non recovery type Coke Oven Plant | 2 x 0.25 MTPA | No change | 2 x 0.25 | | (6.) | CRM with Pickling line and Galvanizing | 0.35 MTPA | - 0.35 MTPA | Nil | Surrendering the unit | (7.) | DI Pipe Unit | 0.2 Million TPA | No change | 0.2 Million TPA | | (8.) | CPP | WHRB - 104 MW + CFBC - 90 MW | WHRB - 86 MW | WHRB - 190 MW + CFBC - 90 MW | | (9.) | Railway Siding | 1 number | Nil | 1 number | | (10.) | Sinter Plant | 1 x 70 sqm | No Change | 1 x 70 sqm | | (11.) | Chrome Briquette Plant | 1 x 40 TPH | Nil | 1 x 40 TPH | | (12.) | Lime Dolo Plant | 1 x 200 TPD | Nil | 1 x 200 TPD | | (13.) | Oxygen Plant | 1 x 200 TPD | 2 x 200 TPD | 3 x 200 TPD | | (14.) | Rolling Mill | 0.6 MTPA | 1.2 MTPA | 1.8 MTPA | | (15.) | Producer Gas Plant | 20 x 7500 Nm3/hr | 6 x 7500 Nm3/hr | 26 x 7500 Nm3/hr | | (16.) | Blast Furnace with matching PCM | 1 x 550 cum | No change | 1 x 550 cum | | (17.) | Ferro Alloy Plant | 4 x 9 MVA | Nil | 4 x 9 MVA | | (18.) | LD | Nil | 2 x 45 T | 2 x 45 T | | (19.) | Pellet Plant with matching Benef./ Wet Grinding | 1 x 2.4 MTPA | increase in existing units + 2 x 4 MTPA | (1 x 3 + 2 x 4)11.0 MTPA | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 29 May 2020 | (iv)Valid Upto | 31 Jul 2024 | (v)File No. | C0128946, 131937, 131949, 132105, 132139 | (vi)Application No. | C0128946, 131937, 131949, 132105,132139 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2900 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 220 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.64 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 22 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 14753159 | (b)Existing quantity of raw material/fuel | 6797627 | (c)Total quantity of raw material/fuel | 21550786 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Iron Ore fines & Lumps | 16178770 | Tons per Annum | | Barbil-Joda, Orissa | Rail | | 201 | MoU | | Copy of Linkage | (2.) | Coking Coal | 797500 | Tons per Annum | | BCCL, Dhanbad Alternate source: Imported | Road,Rail | | 177 | e-auction | | Copy of Linkage | (3.) | COke Fines | 33901 | Tons per Annum | | BCCL, Dhanbad Alternate source: Imported | Road,Rail | | 177 | e-auction | | Copy of Linkage | (4.) | Zinc | 408 | Tons per Annum | | LOCAL MARKET | Road | | 150 | Open Market | | Copy of Linkage | (5.) | Bitumen Solution/ Epoxy Paint | 1150 | Others | KILO LITER/YEAR | WRAS approved vendor | Road | | 150 | Open Market | | Copy of Linkage | (6.) | Chrome Ore | 195000 | Tons per Annum | | Jajpur, Orissa | Road,Rail | | 177 | e-auction | | Copy of Linkage | (7.) | Inoculants | 168 | Tons per Annum | | LOCAL MARKET | Road | | 150 | Open Market | | Copy of Linkage | (8.) | Non Coking Coal | 2708011 | Tons per Annum | | CCL, MCL & Imported Coal. Captive Coal mines | Road,Rail | | 100 | Others | Captive, Open Market | Copy of Linkage | (9.) | Manganese ore | 148200 | Tons per Annum | | Balaghat, MP & Orissa | Road,Rail | | 719 | Others | Consent | Copy of Linkage | (10.) | Ferro Alloy | 37556 | Tons per Annum | | West Bengal | Road,Rail | | 150 | Open Market | | Copy of Linkage | (11.) | Dolomite | 376710 | Tons per Annum | | Birmitrapur, Orissa/Bilaspur, CG | Road,Rail | | 541 | Open Market | | Copy of Linkage | (12.) | Limestone | 534480 | Tons per Annum | | Birmitrapur, Orissa/Bilaspur, CG, MP. | Road,Rail | | 541 | Open Market | | Copy of Linkage | (13.) | Quartzite | 456100 | Tons per Annum | | Belpahar, Orissa/Bilaspur, Raipur, CG. | Road,Rail | | 150 | Open Market | | Copy of Linkage | (14.) | Pyroxenite | 23100 | Tons per Annum | | Jharkhand, Orissa | Road,Rail | | 150 | Open Market | | Copy of Linkage | (15.) | Slag Coagulant | 264 | Tons per Annum | | LOCAL MARKET | Road | | 150 | Open Market | | Copy of Linkage | (16.) | Runner Coat | 900 | Tons per Annum | | LOCAL MARKET | Road | | 150 | Open Market | | Copy of Linkage | (17.) | Magnesium | 300 | Tons per Annum | | LOCAL MARKET | Road | | 150 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2020 To 28 Feb 2021 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 8.9 | 4.0 | 8.4 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 83.7 | 57.5 | 79.2 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 38.4 | 25.5 | 33.8 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 26.5 | 12.8 | 25.6 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 505 | 180 | 500 | 2000 | (2.) | pH | | | NA | | 7.14 | 6.24 | 8.5 | 8.5 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | Total Hardness | | | mg/l | | 232 | 108 | 200 | 600 | (5.) | Chlorides | | | mg/l | | 85.9 | 18.9 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.05 | 0.05 | 1 | 1.5 | (7.) | Heavy Metals | | Lead | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | |
14.3. No. of Surface Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 35 | 11 | E | (2.) | pH | | NA | | 7.2 | 6.83 | E | (3.) | DO | | mg/l | | 5.7 | 4.6 | E | (4.) | BOD | | mg/l | | 9.6 | 2.6 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 63.6 | 34.2 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 69.4 | 41.8 | 75 | |
14.5. No. of Soil Sample Monitored locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.42 | 7.1 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 580 | 380 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 610 | 480 | (4.) | K(Potassium) | Milligram per Kilogram | | 1280 | 980 | (5.) | Electric Conductivity | Others | dS/m | 1.5 | 1.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12.9 To 18 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10.6 To 14.6 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 11800 | 1 | Copy of Permission Letter | Pipeline | | Others | Pipeline, Tubewell | Memo No. 2623 PW | 14 Aug 2018 | 21600 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 1200 | 1200 | ETP with Oil& Grease separator | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 1200 | | (2.) | Domestic | 144 | 200 | STP | Green Belt Renewal Plant | | 144 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1344 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1344 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | MBF Sludge | Industrial Waste | | 316035 | Tons | 0 | Conveyor Belt | | Others | Used in Sinter plant | (2.) | Core sand and slag | Industrial Waste | | 4777 | Tons | 0 | Road | | Others | Used for road construction/land levelling purpose | (3.) | Cement Slurry | Industrial Waste | | 500 | Tons | 0 | Road,Pipe Conveyor | | Others | Brick making and Cement Making | (4.) | Kiln Accretion | Industrial Waste | | 14500 | Tons | 0 | Road | | Others | Road construction | (5.) | Tar sludge and coal tar | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 45900 | Tons | 0 | Road | | Authorized Recyclers | | (6.) | Molding line | Industrial Waste | | 5 | Tons | 0 | Road | | Others | Used for road construction/land levelling purpose | (7.) | Fettling & Grinding | Industrial Waste | | 2 | Tons | 0 | Road | | Others | Used for road construction/land levelling purpose | (8.) | Cotton waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.52 | Tons | 0 | Road | | Authorized Recyclers | | (9.) | BF Slag | Industrial Waste | | 246000 | Tons | 0 | Road | | Others | Cement Making & in Sinter plant | (10.) | Dolo Char | Industrial Waste | | 516400 | Tons | 0 | Road | | Others | Used in CFBC Boilers | (11.) | SMS Slag and Scale | Industrial Waste | | 205750 | Tons | 0 | Road | | Others | Metal recovery then used in construction etc | (12.) | Ferro chrome slag | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 117000 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (13.) | Bottom Ash | Bottom Ash | | 147700 | Tons | 0 | Road,Pipe Conveyor | | Others | Used for road construction/land levelling purpose | (14.) | Dust from APC devices | Industrial Waste | | 895790 | Tons | 0 | Road,Pipe Conveyor | | Others | Used in Sinter plant, Brick manufacturing, Pellet | (15.) | Miss roll/ End cuts | Industrial Waste | | 21020 | Tons | 0 | Road | | Others | Used in Sinter plant | (16.) | Fly Ash | Fly Ash | | 511276 | Tons | 0 | Road,Pipe Conveyor | | Others | Brick making and in Cement Plant | (17.) | Tailings | Industrial Waste | | 220000 | Tons | 0 | Road | | Others | Brick making, Paver block, road construction | (18.) | Zinc dross | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 17 | Tons | 0 | Road | | Authorized Recyclers | | (19.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 80 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (20.) | Shot Blasting | Industrial Waste | | 8 | Tons | 0 | Road | | Others | Used for road construction/land levelling purpose | (21.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 15 | Kilolitre | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 25.73 | 4.4 | 3.67 | 29.40 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 36.56 | 4.4 | 1.01 | 37.57 | 60 | (3.) | PM10 | | Microgram per Meter Cube | 80.31 | 3.6 | 7.03 | 87.34 | 100 | (4.) | SO2 | | Microgram per Meter Cube | 8.67 | 3.6 | 4.1 | 12.77 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | CPP - WHRB (1 x 1200 TPD DR) | coal | 85 | 2.5 | PM10 | | 1.26 | (2.) | Rolling Mill Reheating Furnace | Gas, Electricity | 35 | 1.2 | PM10 | | 0.12 | (3.) | CPP - CFBC ( 2 x 45 MW) | midlings, coal | 100 | 3 | PM10 | | 1.26 | (4.) | DIP (4 x 8 T) | coal | 35 | 1.1 | PM10 | | 0.15 | (5.) | Zn coating | electricity | 35 | 0.8 | PM10 | | 0.09 | (6.) | Bitumen coating | electricity | 35 | 0.8 | PM10 | | 0.06 | (7.) | CPP - WHRB (2 x 600 TPD DR) | e | 75 | 2.5 | SO2 | | 2.8 | (8.) | CPP - CFBC (2 x 45 MW) | coal | 100 | 3 | NOx | | 4.2 | (9.) | MBF - Stove | BFG | 50 | 1.6 | PM10 | | 0.78 | (10.) | Pellet Plant (1 x 4 MTPA) | coal | 110 | 2.5 | PM10 | | 3.3 | (11.) | SMS-IF (6 x 25 T) | Electricity | 35 | 1.2 | PM10 | | 0.36 | (12.) | Ladle furnace (2 x 45 T) | coal, coke | 35 | 1.2 | PM10 | | 0.33 | (13.) | Rolling mill Reheating Furnace | Electricity, Gases | 35 | 1.2 | PM10 | | 0.12 | (14.) | SMS-IF (5 x 20 T) | electricity | 35 | 1.2 | PM10 | | 0.33 | (15.) | LCP | e | 35 | 1 | PM10 | | 0.18 | (16.) | Annealing Furnace | electricity | 35 | 1.2 | PM10 | | 0.21 | (17.) | Pellet Machine(1 x 3 MTPA) | PGP, coal | 110 | 2.5 | PM10 | | 2.85 | (18.) | Ferro Plant (2 x 9 MVA) | electricity | 35 | 1 | PM10 | | 0.21 | (19.) | CPP - WHRB (2 x 600 TPD) | coal | 75 | 2.5 | PM10 | | 1.05 | (20.) | Zn coating | electricity | 35 | 0.8 | PM10 | | 0.09 | (21.) | CPP - WHRB (2 x 600 TPD DR) | coal | 75 | 2.5 | SO2 | | 2.8 | (22.) | Sinter Plant (Tail) | coal, coke | 40 | 2.5 | SO2 | | 2.72 | (23.) | CPP - WHRB (1 x 1200 TPD DR) | e | 85 | 2.5 | SO2 | | 3.36 | (24.) | CPP - WHRB (1 x 1200 TPD DR) | e | 85 | 2.5 | SO2 | | 3.36 | (25.) | CPP - WHRB (2 x 600 TPD) | e | 75 | 2.5 | NOx | | 2.8 | (26.) | CPP - WHRB (Coke Oven) | e | 35 | 2 | NOx | | 1.32 | (27.) | Sinter Plant M/c Head | coal, coke | 60 | 2.5 | PM10 | | 1.08 | (28.) | Sinter Plant cooler | coal, coke | 40 | 2.5 | PM10 | | 1.02 | (29.) | Pellet Plant (1 x 4 MTPA) | coal | 110 | 2.5 | PM10 | | 3.3 | (30.) | SMS-IF (6 x 25 T) | electricity | 35 | 1.2 | PM10 | | 0.36 | (31.) | SMS-IF (5 x 30 T) | electricity | 35 | 1.2 | PM10 | | 0.39 | (32.) | CPP - WHRB (1 x 1200 TPD DR) | coal | 85 | 2.5 | PM10 | | 1.26 | (33.) | SMS-IF (5 x 20 T) | electricity | 35 | 1.2 | PM10 | | 0.33 | (34.) | Ferro Plant | Gas, electricity | 35 | 1 | PM10 | | 0.21 | (35.) | CPP-WHRB (2 x 600 TPD DR) | coal | 75 | 2.5 | PM10 | | 1.05 | (36.) | CPP - WHRB (Coke Oven) | c | 35 | 2 | PM10 | | 0.495 | (37.) | CPP - WHRB (Coke Oven) | c | 35 | 2 | PM10 | | 0.495 | (38.) | DIP (4 x 8 T) | coal | 35 | 1.1 | PM10 | | 0.15 | (39.) | Annealing furnace | electricity | 35 | 1.2 | PM10 | | 0.21 | (40.) | Mg converter | electricity | 35 | 1 | PM10 | | 0.09 | (41.) | Mg converter | electricity | 35 | 1 | PM10 | | 0.09 | (42.) | Zn coating | electicity | 35 | 0.8 | PM10 | | 0.09 | (43.) | Zn coating | electicity | 35 | 0.8 | PM10 | | 0.09 | (44.) | Bitumen coating | electicity | 35 | 0.8 | PM10 | | 0.06 | (45.) | Bitumen coating | electicity | 35 | 0.8 | PM10 | | 0.06 | (46.) | Bitumen coting | electicity | 35 | 0.8 | PM10 | | 0.06 | (47.) | CPP - WHRB (2 x 600 TPD DR) | coal | 75 | 2.5 | NOx | | 2.8 | (48.) | MBF Stove | Gas, coal, coke | 50 | 1.6 | SO2 | | 2.6 | (49.) | MBF Stove | Gas, coal, coke | 50 | 1.6 | NOx | | 2.6 | (50.) | Sinter Plant (Head) | coal, coke | 60 | 2.5 | SO2 | | 2.88 | (51.) | Sinter Plant (Head) | coal, coke | 60 | 2.5 | NOx | | 2.88 | (52.) | Sinter Plant (Tail) | coal, coke | 40 | 2.5 | NOx | | 2.72 | (53.) | CPP - WHRB (1 x 1200 TPD DR) | e | 85 | 2.5 | NOx | | 3.36 | (54.) | CPP - WHRB (1 x 1200 TPD DR) | e | 85 | 2.5 | NOx | | 3.36 | (55.) | CPP - WHRB (Coke Oven) | e | 35 | 2 | SO2 | | 1.32 | (56.) | CPP - WHRB (Coke Oven) | e | 35 | 2 | SO2 | | 1.32 | (57.) | CPP - WHRB (Coke Oven) | e | 35 | 2 | NOx | | 1.32 | (58.) | CPP - CFBC (2 x 45 MW) | coal | 100 | 3 | SO2 | | 4.2 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 478900 | (b)Source | CPP & State Grid | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2 X 380 KVA, 2 X 600 KVA and 2 X 725 KVA | (e)Stack Height (in m) | 6 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 20.23 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 125.46 | Total Land (ha.) | 145.69 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 17038.714 | (b)Waste/Barren Land (ha.) | 1550.86 | (c)Grazing/ Community Land (ha.) | 4550.92 | (d)Surface Water Bodies (ha.) | 1288.58 | (e)Settlements (ha.) | 7339.60 | (f)Industrial (ha.) | 579.12 | (g)Forest (ha.) | 2716.77 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : railline etc | 148.26 | Total (ha.) | 35212.8240 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 48.07 | | (2.) | Tailing Pond | | 2.02 | | (3.) | Water Reservoir | | 6.48 | including RWH | (4.) | Others | Railway siding, road and raw material yard | 27.09 | | (5.) | Main Plant | | 62.03 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | Nil | 10 | No ESZs within 10 km radius | (2.) | Corridors | Nil | 10 | No corridors within 10 km radius | (3.) | Wildlife Corridors | Nil | 10 | No Wildlife Corridors within 10 km radius | (4.) | Critically Polluted Area | Nil | 10 | No CPA within 10 km radius | (5.) | ESAs | Nil | 10 | No ESAs within 10 km radius | (6.) | WLS | Nil | 10 | No WLS within 10 km radius | (7.) | NPA | Nil | 10 | No NPA within 10 km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Nil | 10 | No Archaeological sites within 10 km radius | (2.) | Defence Installations | | Kalaikunda Air force Station | 8 | in West direction | (3.) | Forest | | 3 PF | 5.8 | 2 in South and 1 in North direction | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 131.53 | (b)Land yet to be acquired(Ha) | 14.16 | (c)Status of Land acquisition if not acquired | 131.53 ha. (325 acres) tie-up/agreement made and f | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kangsabati River | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 3 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 300 | (b)Permanent Employment-During Operation | 3000 | (c)Temporary Employment- During Construction | 800 | (d)Temporary Employment- During Operation | 900 | (e)No. of working days | 365 | (f)Total Manpower | 5000 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 39.52 | 8.55 | 48.07000000000001 | (2.) | Percentage of Total Project Area | 31.5 | 1.5 | 33 | (3.) | No. of Plants | 98800 | 21400 | 120200 | (4.) | Funds Allocated | 90000000 | 60000000 | 150000000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Greenbelt development, RWH | (2.) | Social | Employment | (3.) | Financial | Generation of revenue to State and Country through various taxes | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/SA 0126 | (ii)Name of the EIA Consultant | Centre For Envotech & Management Consultancy Pvt. | (iii)Address | N5/305, IRC Village, Nayapalli, Bhubaneswar-751015 | (iv)Mobile No. | 9861032826 | (v)Landline No. | 0674236034 | (vi)Email Id | cemc122@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 15 Jun 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | Eds Raise Letter | May please respond to the attached EDS along with the requisite supporting documents. | 19 Mar 2022 | 2. | Eds Reply Letter | POINT WISE REPLY TO EDS RAISED DATED 19.03.2022 IS ENLCOSED AS ADDITIONAL FILE | 08 Apr 2022 | 3. | NA | On perusal of the EDS reply it is observed that the EDS reply letter is not in readable condition. It is requested to upload the legible EDS reply document in readable form. | 19 Apr 2022 | 4. | Eds Reply Letter | EDS reply letter in legible condition/ readable form are uploaded against Sl. No -39 (g) Additional File and also shared in Google Drive Link. | 19 Apr 2022 | 5. | NA | Dear Sir,
Your proposal has been examined and following are the deficiencies needs to be rectified and to be uploaded/submitted on Parivesh Portal:
(i) Please refer your EDS reply dated 19.04.2022 wherein the PP submitted that due to size constraint EDS reply letter in legible condition/ readable form are shared in Google Drive Link as given below; 1. Updated Replies to EDS raised on 19.03.2022 with supporting documents https://drive.google.com/file/d/1o949y8AhZkqCFrvn77or5nq13BuVcDtp/view?usp=sharing. In this regard it is mentioned that the whole process for grant of EC is online on Parivesh Portal. This is very serious concern that PP/Consultant has submitted google drive link. If PP/Consultant facing any issues related to uploading the documents they can contact Parivesh Team in the Ministry for assistance or email to them. So please revise your application along with Form-2.
(ii) In S.No. 7.1 of Form 2, the Public hearing proceedings and Action Plan is still not legible. Kindly revise the application and upload on the same at said S.No. Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2, as the whole process is online.
(iii) On perusal the EC application it is observed that many of the activities mentioned in the earlier EC were not sill implemented. What are reason behind this, please provide detailed justification?.
(iv) This is an existing Unit. The PP needs to submit the details of activities/ECs in tabular form showing its details of ECs/CTO vis-à-vis production capacity since grant of EC/CTO to check the violation, if any. All old CTEs/CTOs/ HW Authorization to be uploaded to verify the violation, if any.
(v) On perusal of CCR issued by IRO, MoEFCC, PP first complete the compliances and submit the ATR on the subject.
(vi) Please confirm whether the said Unit is located in CPA/SPA/OPA. If yes, please provide the details.
(vii) Details of court case, directions issued by SPCB, if any, pending needs to be submitted.
(viii) Ministry in its earlier EDS sought the details of TOR of the existing EC proposal. On perusal it is noted that M/s RASHMI ALLOY STEEL PRIVATE LIMITED has obtained TOR in April 2021. However, the present application of EC is from M/s ORISSA ALLOY STEEL PVT. LTd. Please confirm whether PP has taken transfer of TOR from M/s RASHMI ALLOY STEEL PRIVATE LIMITED to M/s ORISSA ALLOY STEEL PVT. LTd. If yes, please submit the copy. If No PP first need to apply for transfer of TOR application in the name of new PP. It is not clear these are the basic information not submitted by the Consultant/PP. Consultant is requested to read all the provisions of the EIA Notification before submitting the application on Parivesh portal, as the whole process is online on Parivesh portal.
(ix) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal by the EAC. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful | 04 May 2022 | 6. | Eds Reply Letter | POINT WISE REPLY TO EDS DATED 04.05.2022 | 12 May 2022 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Sir, point wise reply to ADS dated 11.07.2022 is submitted with supporting documents. | 16 Jul 2022 | 2. | NA | Dear Sir,
This is regarding the EC proposal of M/s. Orissa Alloy Steel Pvt. Ltd. for Expansion of Integrated Steel Plant, located at Mouza – Nandarchalk, Bargai, Shyamraipur & Kanjarichak, Village – Gokulpur, P.O. – Shyamraipur, P.S. – Kharagpur (L), Dist. Paschim Medinipur, West Bengal.
2. The Proposal of EC was deliberated by the EAC, in its meeting held on May 30-31, 2022.
3. The matter has been examined in the Ministry and accordingly it is requested to submit the following information/clarification/justifications:
(i) Permission for water approval in the name of new company or document in support for such transfer
(ii) Justification for multiple EC transfers in new entities with details of their CIN Nos.
(iii) Status of green belt along with photograph, high resolution satellite imageries and kml file.
(iv) Details of Action Plan for mitigation measures w.r.t. raw material storage, control of fugitive emission, vacuum cleaning, continuous effluent monitoring system. | 11 Jul 2022 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | BIJAYEN SRIVASTAVA | Designation | SENIOR MANAGER | Name of Company (Applicant Name should not be given here) | ORISSA ALLOY STEEL PVT. LTD. | Address | ROOM NO 3 B, 1 , GARSTIN PLACE |
|