Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Integrated Steel Plant (1.2 Million TPA to 2.0 Million TPA Finished Steel) with 270 MW Captive Power Plant
(b)Name of the Company / Organisation ORISSA ALLOY STEEL PVT. LTD.
(c)Registered Address ROOM NO 3 B, 1 , GARSTIN PLACE,KOLKATA,Kolkata,West Bengal-700001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant BIJAYEN SRIVASTAVA
(b)Designation (Owner/ Partner/ CEO) SENIOR MANAGER
(c)Address ROOM NO 3B, 1 GARSTIN PLACE,KOLKATA,Kolkata,Kolkata,West Bengal-700001
(d)Pin code 700001
(e)E-mail orissaalloysteelprivateltd@gmail.com
(f)STD Code. 33(f)Telephone No. 22895200
(g)Fax No. 22438517
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity4(b) Coke oven plants
(b)Category A
(c)Proposal Number IA/WB/IND/261449/2021
(d)Master Proposal Number(Single Window) SW/261438/2022
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1
(b)Pincode 721301
(c)Bounded Latitudes (North)
From
Degree 22
Minutes 21
Second 27
From
Degree 22
Minutes 22
Second 14
(d)Bounded Longitudes (East)
From
Degree 87
Minutes 17
Second 48
From
Degree 87
Minutes 18
Second 41
(e)Survey of India Topo Sheet No. F45J7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 35
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.9
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)West BengalWest MedinipurKharagpur - IGokulpur
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/169/2017-IA.Ii(I)
(c)Date of Issue of TOR 08 Apr 2021
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 12 May 2022
(c)Date of Issue of EC 10 Aug 2022
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :09 Jul 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :13 Aug 2021
Distance of Public Hearing Venue from the Proposed Project :3.5
Mahasakti Mahasangha, Satkui, P.O. Matkatpur (near BDO Office Kharagpur-I), Dist - Paschim Medinipur, West Bengal
State :West Bengal
District :West Medinipur
Tehsil :Kharagpur - I
Village :Satkui
591) Environment – APCD, Pollution Control, Housekeeping 2) Employment 3) Drinking water facilities 4) Education 5) Road development 6) CSR Activities related etc.OthersAdditional District Magistrate LR & DL&LRO, Paschim Medinipur
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Kolkata
(iii)Letter No. 102-616/18/EPE/115
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Feb 21 2022 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Oxygen from Oxygen Plant200400600.000OthersTPDOthersPipeline
(2.)Pig Iron17005002200.000OthersTPDRoad,RailPipeline
(3.)DRI0.7441.0561.800OthersMillion TPARoad,Rail,Conveyor BeltPipeline
(4.)Slag crusher0100100.000OthersTPDRoad
(5.)Liquid steel from IF10.81.800OthersMillion TPARail
(6.)Producer Gas15000045000195000.000OthersNm3/hrOthersPipe
(7.)Calcined Lime/dolomite2000200.000OthersTPDRoad
(8.)Jigging Plant03030.000OthersTPDRoad,Rail
(9.)DI Pipe, fitting & Accessories from DIP Plant0.200.200OthersMillion TPARoad,Rail
(10.)Chrome Briquette40040.000OthersTPHRoad,Rail
(11.)CRM with pickling and Galvanising0.35-0.350.000OthersMillion TPARail
(12.)Pellet with matching Beneficiation/ Wet Grinding2.48.611.000OthersMillion TPARoad,Conveyor Belt,Pipe Conveyor
(13.)TMT Bar, Wire & Wire Rod0.61.21.800OthersMillion TPARoad,RailPipeline
(14.)Hot metal from MBF0.60.170.770OthersMillion TPAOthersTorpedo and Ladle car
(15.)Coke0.50.050.550OthersMillion TPAConveyor Belt
(16.)Sinter0.60.240.840OthersMillion TPAConveyor BeltPipeline
(17.)CPP19476270.000Mega Watt(MW)OthersCable
(18.)Railway Siding101.000OthersNumberRailPipeline
(19.)Liquid steel from LD00.770.770OthersMillion TPARailPipeline
(20.)Ferro Alloy0.0480.030.078OthersMillion TPARoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)DR Plant4 x 600 TPD2 x 1200 TPD4 x 600 + 2 x 1200 TPD
(2.)SMS10 x 20 T EIF + 2 x 50 T EAF12 x 30 T EIF + 5 x 30 T EIF - 2 x 50 T EAF(10 x 20 T + 12 x 25 T + 5 x 30 T) EIF2 x 50 T EAF dropped
(3.)SMS Slag CrusherNil2 x 25 T2 x 25 T
(4.)Jigging PlantNil2 x 15 TPD2 x 15 TPD
(5.)Non recovery type Coke Oven Plant2 x 0.25 MTPANo change2 x 0.25
(6.)CRM with Pickling line and Galvanizing0.35 MTPA- 0.35 MTPANilSurrendering the unit
(7.)DI Pipe Unit0.2 Million TPANo change0.2 Million TPA
(8.)CPPWHRB - 104 MW + CFBC - 90 MWWHRB - 86 MWWHRB - 190 MW + CFBC - 90 MW
(9.)Railway Siding1 numberNil1 number
(10.)Sinter Plant1 x 70 sqmNo Change1 x 70 sqm
(11.)Chrome Briquette Plant1 x 40 TPHNil1 x 40 TPH
(12.)Lime Dolo Plant1 x 200 TPDNil1 x 200 TPD
(13.)Oxygen Plant1 x 200 TPD2 x 200 TPD3 x 200 TPD
(14.)Rolling Mill0.6 MTPA1.2 MTPA1.8 MTPA
(15.)Producer Gas Plant20 x 7500 Nm3/hr6 x 7500 Nm3/hr26 x 7500 Nm3/hr
(16.)Blast Furnace with matching PCM1 x 550 cumNo change1 x 550 cum
(17.)Ferro Alloy Plant4 x 9 MVANil4 x 9 MVA
(18.)LDNil2 x 45 T2 x 45 T
(19.)Pellet Plant with matching Benef./ Wet Grinding1 x 2.4 MTPAincrease in existing units + 2 x 4 MTPA(1 x 3 + 2 x 4)11.0 MTPA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 May 2020
(iv)Valid Upto 31 Jul 2024
(v)File No. C0128946, 131937, 131949, 132105, 132139
(vi)Application No. C0128946, 131937, 131949, 132105,132139
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2900
(b) Funds Allocated for Environment Management (Capital) (in Crores) 220
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.64
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 22
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 14753159
(b)Existing quantity of raw material/fuel 6797627
(c)Total quantity of raw material/fuel 21550786
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron Ore fines & Lumps16178770Tons per AnnumBarbil-Joda, OrissaRail201 MoUCopy of Linkage
(2.)Coking Coal797500Tons per AnnumBCCL, Dhanbad Alternate source: ImportedRoad,Rail177 e-auctionCopy of Linkage
(3.)COke Fines33901Tons per AnnumBCCL, Dhanbad Alternate source: ImportedRoad,Rail177 e-auctionCopy of Linkage
(4.)Zinc408Tons per AnnumLOCAL MARKETRoad150 Open MarketCopy of Linkage
(5.)Bitumen Solution/ Epoxy Paint1150OthersKILO LITER/YEARWRAS approved vendorRoad150 Open MarketCopy of Linkage
(6.)Chrome Ore195000Tons per AnnumJajpur, OrissaRoad,Rail177 e-auctionCopy of Linkage
(7.)Inoculants168Tons per AnnumLOCAL MARKETRoad150 Open MarketCopy of Linkage
(8.)Non Coking Coal2708011Tons per AnnumCCL, MCL & Imported Coal. Captive Coal minesRoad,Rail100 OthersCaptive, Open MarketCopy of Linkage
(9.)Manganese ore148200Tons per AnnumBalaghat, MP & OrissaRoad,Rail719 OthersConsentCopy of Linkage
(10.)Ferro Alloy37556Tons per AnnumWest BengalRoad,Rail150 Open MarketCopy of Linkage
(11.)Dolomite376710Tons per AnnumBirmitrapur, Orissa/Bilaspur, CGRoad,Rail541 Open MarketCopy of Linkage
(12.)Limestone534480Tons per AnnumBirmitrapur, Orissa/Bilaspur, CG, MP.Road,Rail541 Open MarketCopy of Linkage
(13.)Quartzite456100Tons per AnnumBelpahar, Orissa/Bilaspur, Raipur, CG.Road,Rail150 Open MarketCopy of Linkage
(14.)Pyroxenite23100Tons per AnnumJharkhand, OrissaRoad,Rail150 Open MarketCopy of Linkage
(15.)Slag Coagulant264Tons per AnnumLOCAL MARKETRoad150 Open MarketCopy of Linkage
(16.)Runner Coat900Tons per AnnumLOCAL MARKETRoad150 Open MarketCopy of Linkage
(17.)Magnesium300Tons per AnnumLOCAL MARKETRoad150 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2020 To 28 Feb 2021
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube8.94.08.480
(2.)PM10Micro Gram per Meter Cube83.757.579.2100
(3.)PM2.5Micro Gram per Meter Cube38.425.533.860
(4.)NOxMicro Gram per Meter Cube26.512.825.680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l5051805002000
(2.)pHNA7.146.248.58.5
(3.)TSSmg/l0000
(4.)Total Hardnessmg/l232108200600
(5.)Chloridesmg/l85.918.92501000
(6.)Fluoridemg/l0.050.0511.5
(7.)Heavy MetalsLeadmg/l0.010.010.010.01
    14.3.     No. of Surface Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l3511E
(2.)pHNA7.26.83E
(3.)DOmg/l5.74.6E
(4.)BODmg/l9.62.6E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))63.634.270
(2.)Leq(Day)A-weighted decibels(dB(A))69.441.875
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.427.1
(2.)P(Phosphorus)Milligram per Kilogram580380
(3.)N(Nitrogen)Milligram per Kilogram610480
(4.)K(Potassium)Milligram per Kilogram1280980
(5.)Electric ConductivityOthersdS/m1.51.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.9 To 18
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.6 To 14.6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface118001Copy of Permission LetterPipelineOthersPipeline, TubewellMemo No. 2623 PW14 Aug 201821600
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial12001200ETP with Oil& Grease separatorReuse within the Plant & Recycling,Green Belt Renewal Plant1200
(2.)Domestic144200STPGreen Belt Renewal Plant144
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1344
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1344
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MBF SludgeIndustrial Waste316035Tons0Conveyor BeltOthersUsed in Sinter plant
(2.)Core sand and slagIndustrial Waste4777Tons0RoadOthersUsed for road construction/land levelling purpose
(3.)Cement SlurryIndustrial Waste500Tons0Road,Pipe ConveyorOthersBrick making and Cement Making
(4.)Kiln AccretionIndustrial Waste14500Tons0RoadOthersRoad construction
(5.)Tar sludge and coal tarHazardous Waste (as per Hazardous and Other Waste Management rules 2016)45900Tons0RoadAuthorized Recyclers
(6.)Molding lineIndustrial Waste5Tons0RoadOthersUsed for road construction/land levelling purpose
(7.)Fettling & GrindingIndustrial Waste2Tons0RoadOthersUsed for road construction/land levelling purpose
(8.)Cotton wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.52Tons0RoadAuthorized Recyclers
(9.)BF SlagIndustrial Waste246000Tons0RoadOthersCement Making & in Sinter plant
(10.)Dolo CharIndustrial Waste516400Tons0RoadOthersUsed in CFBC Boilers
(11.)SMS Slag and ScaleIndustrial Waste205750Tons0RoadOthersMetal recovery then used in construction etc
(12.)Ferro chrome slagHazardous Waste (as per Hazardous and Other Waste Management rules 2016)117000Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(13.)Bottom AshBottom Ash147700Tons0Road,Pipe ConveyorOthersUsed for road construction/land levelling purpose
(14.)Dust from APC devicesIndustrial Waste895790Tons0Road,Pipe ConveyorOthersUsed in Sinter plant, Brick manufacturing, Pellet
(15.)Miss roll/ End cutsIndustrial Waste21020Tons0RoadOthersUsed in Sinter plant
(16.)Fly AshFly Ash511276Tons0Road,Pipe ConveyorOthersBrick making and in Cement Plant
(17.)TailingsIndustrial Waste220000Tons0RoadOthersBrick making, Paver block, road construction
(18.)Zinc drossHazardous Waste (as per Hazardous and Other Waste Management rules 2016)17Tons0RoadAuthorized Recyclers
(19.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)80Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(20.)Shot BlastingIndustrial Waste8Tons0RoadOthersUsed for road construction/land levelling purpose
(21.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Kilolitre0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube25.734.43.6729.4080
(2.)PM2.5Microgram per Meter Cube36.564.41.0137.5760
(3.)PM10Microgram per Meter Cube80.313.67.0387.34100
(4.)SO2Microgram per Meter Cube8.673.64.112.7780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CPP - WHRB (1 x 1200 TPD DR)coal852.5PM101.26
(2.)Rolling Mill Reheating FurnaceGas, Electricity351.2PM100.12
(3.)CPP - CFBC ( 2 x 45 MW)midlings, coal1003PM101.26
(4.)DIP (4 x 8 T)coal351.1PM100.15
(5.)Zn coatingelectricity350.8PM100.09
(6.)Bitumen coatingelectricity350.8PM100.06
(7.)CPP - WHRB (2 x 600 TPD DR)e752.5SO22.8
(8.)CPP - CFBC (2 x 45 MW)coal1003NOx4.2
(9.)MBF - StoveBFG501.6PM100.78
(10.)Pellet Plant (1 x 4 MTPA)coal1102.5PM103.3
(11.)SMS-IF (6 x 25 T)Electricity351.2PM100.36
(12.)Ladle furnace (2 x 45 T)coal, coke351.2PM100.33
(13.)Rolling mill Reheating FurnaceElectricity, Gases351.2PM100.12
(14.)SMS-IF (5 x 20 T)electricity351.2PM100.33
(15.)LCPe351PM100.18
(16.)Annealing Furnaceelectricity351.2PM100.21
(17.)Pellet Machine(1 x 3 MTPA)PGP, coal1102.5PM102.85
(18.)Ferro Plant (2 x 9 MVA)electricity351PM100.21
(19.)CPP - WHRB (2 x 600 TPD)coal752.5PM101.05
(20.)Zn coatingelectricity350.8PM100.09
(21.)CPP - WHRB (2 x 600 TPD DR)coal752.5SO22.8
(22.)Sinter Plant (Tail)coal, coke402.5SO22.72
(23.)CPP - WHRB (1 x 1200 TPD DR)e852.5SO23.36
(24.)CPP - WHRB (1 x 1200 TPD DR)e852.5SO23.36
(25.)CPP - WHRB (2 x 600 TPD)e752.5NOx2.8
(26.)CPP - WHRB (Coke Oven)e352NOx1.32
(27.)Sinter Plant M/c Headcoal, coke602.5PM101.08
(28.)Sinter Plant coolercoal, coke402.5PM101.02
(29.)Pellet Plant (1 x 4 MTPA)coal1102.5PM103.3
(30.)SMS-IF (6 x 25 T)electricity351.2PM100.36
(31.)SMS-IF (5 x 30 T)electricity351.2PM100.39
(32.)CPP - WHRB (1 x 1200 TPD DR)coal852.5PM101.26
(33.)SMS-IF (5 x 20 T)electricity351.2PM100.33
(34.)Ferro PlantGas, electricity351PM100.21
(35.)CPP-WHRB (2 x 600 TPD DR)coal752.5PM101.05
(36.)CPP - WHRB (Coke Oven)c352PM100.495
(37.)CPP - WHRB (Coke Oven)c352PM100.495
(38.)DIP (4 x 8 T)coal351.1PM100.15
(39.)Annealing furnaceelectricity351.2PM100.21
(40.)Mg converterelectricity351PM100.09
(41.)Mg converterelectricity351PM100.09
(42.)Zn coatingelecticity350.8PM100.09
(43.)Zn coatingelecticity350.8PM100.09
(44.)Bitumen coatingelecticity350.8PM100.06
(45.)Bitumen coatingelecticity350.8PM100.06
(46.)Bitumen cotingelecticity350.8PM100.06
(47.)CPP - WHRB (2 x 600 TPD DR)coal752.5NOx2.8
(48.)MBF StoveGas, coal, coke501.6SO22.6
(49.)MBF StoveGas, coal, coke501.6NOx2.6
(50.)Sinter Plant (Head)coal, coke602.5SO22.88
(51.)Sinter Plant (Head)coal, coke602.5NOx2.88
(52.)Sinter Plant (Tail)coal, coke402.5NOx2.72
(53.)CPP - WHRB (1 x 1200 TPD DR)e852.5NOx3.36
(54.)CPP - WHRB (1 x 1200 TPD DR)e852.5NOx3.36
(55.)CPP - WHRB (Coke Oven)e352SO21.32
(56.)CPP - WHRB (Coke Oven)e352SO21.32
(57.)CPP - WHRB (Coke Oven)e352NOx1.32
(58.)CPP - CFBC (2 x 45 MW)coal1003SO24.2
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 478900
(b)Source CPP & State Grid
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 X 380 KVA, 2 X 600 KVA and 2 X 725 KVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 20.23
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 125.46
    Total Land (ha.) 145.69
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 17038.714
(b)Waste/Barren Land (ha.) 1550.86
(c)Grazing/ Community Land (ha.) 4550.92
(d)Surface Water Bodies (ha.) 1288.58
(e)Settlements (ha.) 7339.60
(f)Industrial (ha.) 579.12
(g)Forest (ha.) 2716.77
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : railline etc 148.26
    Total (ha.) 35212.8240
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt48.07
(2.)Tailing Pond2.02
(3.)Water Reservoir6.48including RWH
(4.)OthersRailway siding, road and raw material yard27.09
(5.)Main Plant62.03
Total (ha.) 145.69
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNil10No ESZs within 10 km radius
(2.)CorridorsNil10No corridors within 10 km radius
(3.)Wildlife CorridorsNil10No Wildlife Corridors within 10 km radius
(4.)Critically Polluted AreaNil10No CPA within 10 km radius
(5.)ESAsNil10No ESAs within 10 km radius
(6.)WLSNil10No WLS within 10 km radius
(7.)NPANil10No NPA within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil10No Archaeological sites within 10 km radius
(2.)Defence InstallationsKalaikunda Air force Station8in West direction
(3.)Forest3 PF5.82 in South and 1 in North direction
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 131.53
(b)Land yet to be acquired(Ha) 14.16
(c)Status of Land acquisition if not acquired 131.53 ha. (325 acres) tie-up/agreement made and f
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kangsabati River
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 300
(b)Permanent Employment-During Operation 3000
(c)Temporary Employment- During Construction 800
(d)Temporary Employment- During Operation 900
(e)No. of working days 365
(f)Total Manpower 5000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt39.528.5548.07000000000001
(2.)Percentage of Total Project Area31.51.533
(3.)No. of Plants9880021400120200
(4.)Funds Allocated9000000060000000150000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenbelt development, RWH
(2.)SocialEmployment
(3.)FinancialGeneration of revenue to State and Country through various taxes
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/SA 0126
(ii)Name of the EIA Consultant Centre For Envotech & Management Consultancy Pvt.
(iii)Address N5/305, IRC Village, Nayapalli, Bhubaneswar-751015
(iv)Mobile No. 9861032826
(v)Landline No. 0674236034
(vi)Email Id cemc122@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 15 Jun 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1. Eds Raise LetterMay please respond to the attached EDS along with the requisite supporting documents. 19 Mar 2022
2. Eds Reply LetterPOINT WISE REPLY TO EDS RAISED DATED 19.03.2022 IS ENLCOSED AS ADDITIONAL FILE 08 Apr 2022
3.NAOn perusal of the EDS reply it is observed that the EDS reply letter is not in readable condition. It is requested to upload the legible EDS reply document in readable form. 19 Apr 2022
4. Eds Reply LetterEDS reply letter in legible condition/ readable form are uploaded against Sl. No -39 (g) Additional File and also shared in Google Drive Link. 19 Apr 2022
5.NADear Sir, Your proposal has been examined and following are the deficiencies needs to be rectified and to be uploaded/submitted on Parivesh Portal: (i) Please refer your EDS reply dated 19.04.2022 wherein the PP submitted that due to size constraint EDS reply letter in legible condition/ readable form are shared in Google Drive Link as given below; 1. Updated Replies to EDS raised on 19.03.2022 with supporting documents https://drive.google.com/file/d/1o949y8AhZkqCFrvn77or5nq13BuVcDtp/view?usp=sharing. In this regard it is mentioned that the whole process for grant of EC is online on Parivesh Portal. This is very serious concern that PP/Consultant has submitted google drive link. If PP/Consultant facing any issues related to uploading the documents they can contact Parivesh Team in the Ministry for assistance or email to them. So please revise your application along with Form-2. (ii) In S.No. 7.1 of Form 2, the Public hearing proceedings and Action Plan is still not legible. Kindly revise the application and upload on the same at said S.No. Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2, as the whole process is online. (iii) On perusal the EC application it is observed that many of the activities mentioned in the earlier EC were not sill implemented. What are reason behind this, please provide detailed justification?. (iv) This is an existing Unit. The PP needs to submit the details of activities/ECs in tabular form showing its details of ECs/CTO vis-à-vis production capacity since grant of EC/CTO to check the violation, if any. All old CTEs/CTOs/ HW Authorization to be uploaded to verify the violation, if any. (v) On perusal of CCR issued by IRO, MoEFCC, PP first complete the compliances and submit the ATR on the subject. (vi) Please confirm whether the said Unit is located in CPA/SPA/OPA. If yes, please provide the details. (vii) Details of court case, directions issued by SPCB, if any, pending needs to be submitted. (viii) Ministry in its earlier EDS sought the details of TOR of the existing EC proposal. On perusal it is noted that M/s RASHMI ALLOY STEEL PRIVATE LIMITED has obtained TOR in April 2021. However, the present application of EC is from M/s ORISSA ALLOY STEEL PVT. LTd. Please confirm whether PP has taken transfer of TOR from M/s RASHMI ALLOY STEEL PRIVATE LIMITED to M/s ORISSA ALLOY STEEL PVT. LTd. If yes, please submit the copy. If No PP first need to apply for transfer of TOR application in the name of new PP. It is not clear these are the basic information not submitted by the Consultant/PP. Consultant is requested to read all the provisions of the EIA Notification before submitting the application on Parivesh portal, as the whole process is online on Parivesh portal. (ix) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal by the EAC. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful 04 May 2022
6. Eds Reply LetterPOINT WISE REPLY TO EDS DATED 04.05.2022 12 May 2022
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSir, point wise reply to ADS dated 11.07.2022 is submitted with supporting documents. 16 Jul 2022
2.NADear Sir, This is regarding the EC proposal of M/s. Orissa Alloy Steel Pvt. Ltd. for Expansion of Integrated Steel Plant, located at Mouza – Nandarchalk, Bargai, Shyamraipur & Kanjarichak, Village – Gokulpur, P.O. – Shyamraipur, P.S. – Kharagpur (L), Dist. Paschim Medinipur, West Bengal. 2. The Proposal of EC was deliberated by the EAC, in its meeting held on May 30-31, 2022. 3. The matter has been examined in the Ministry and accordingly it is requested to submit the following information/clarification/justifications: (i) Permission for water approval in the name of new company or document in support for such transfer (ii) Justification for multiple EC transfers in new entities with details of their CIN Nos. (iii) Status of green belt along with photograph, high resolution satellite imageries and kml file. (iv) Details of Action Plan for mitigation measures w.r.t. raw material storage, control of fugitive emission, vacuum cleaning, continuous effluent monitoring system. 11 Jul 2022
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBIJAYEN SRIVASTAVA
DesignationSENIOR MANAGER
Name of Company (Applicant Name should not be given here)ORISSA ALLOY STEEL PVT. LTD.
AddressROOM NO 3 B, 1 , GARSTIN PLACE
Print