Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environment Clearance for Change in Configuration of the Existing 1.2 MTPA Integrated Steel Plant of TataSteel Long Products Limited at Adityapur Industrial Area, Village Gamharia, Saraikela-Kharsawan, Jharkhand
(b)Name of the Company / Organisation M/S.TATA STEEL LONG PRODUCTS LIMITED( FORMERLY KNOWN AS M/S TATA SPONGE IRON LIMITED )
(c)Registered Address Beleipada Village, Joda Tehsil,,Keonjhar,Orissa-758034
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vilas N Gaikwad
(b)Designation (Owner/ Partner/ CEO) Sr. General Manager (SHE & S)
(c)Address At/Po: Bileipada, Joda, Dist: Keonjhar, Odisha,,,Keonjhar,Orissa-758034
(d)Pin code 758034
(e)E-mail vilas.gaikwad@tatasteellp.com
(f)STD Code. 6767(f)Telephone No. 278178
(g)Fax No. 278179
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity3(a) Metallurgical industries (ferrous & non ferrous)
(b)Category A
(c)Proposal Number IA/JH/IND/207765/2021
(d)Master Proposal Number(Single Window) SW/207764/2021
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Thana no 66,67,69,117,118,119
(b)Pincode 832108
(c)Bounded Latitudes (North)
From
Degree 22.793636
Minutes
Second
From
Degree 22.815134
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.080884
Minutes
Second
From
Degree 86.099313
Minutes
Second
(e)Survey of India Topo Sheet No. F45I1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 162
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)JharkhandSeraikela KharsawanAdityapurGamharia
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. 103-314/11/EPE
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Nov 19 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Steel120000001200000Tons per Annum(TPA)Road,Rail
(2.)Pellets120000001200000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Iron Ore WashingPlant2.7 MTPA-2.7 MTPANo Change
(2.)Rolling MillWRM + Blooming Mill = 1.2 MTPA-WRM + Blooming Mill = 1.2 MTPANo change
(3.)Coke Ovens2 batteries, 96 ovens= 0.5 MTPA-2 batteries, 96 ovens= 0.5 MTPANo Change
(4.)Power Plant25+30+30 MW (Coal) +30 MW (WHR) +15 MW Mix=130 MWConvert 30 MW from coal to Waste Heat Recovery25+30 MW (Coal)+ 30+30 MW (WHR) +15 MW Mix=130 MWIncrease in green energy power generation
(5.)Oxygen Plant220 tpd-220 tpdNo Change
(6.)DRI Kilns5 rotary Kiln of 350 TPD each = 0.625 MTPA-5 rotary Kiln of 350 TPD each = 0.625 MTPANo Change
(7.)Pellet Plant168 m2 Grate Kiln technology = 1.2 MTPA3 no of PG Plant for Fuel168 m2 Grate Kiln technology with PG as fuel =1.2Inclusion of PG Plants in EC letter
(8.)Sinter Plant80 m2 Straight grate =0.6 MTPAIncrease in Capacity to 0.95 MTPA80 m2 Straight grate = 0.95 MTPAExisting plantcapacity is 0.95 MTPA installed by erstwhile UML
(9.)Continuous Casting2X3 + 1X2 + 1X4 Strand Billet Caster =1.2 MTPA-2X3 + 1X2 + 1X4 Strand Billet Caster =1.2 MTPANo Change
(10.)Steel Melt Shop (EAF)40MT - 2 nos 70MT - 1no = 1.2 MTPA-40MT - 2 nos 70MT - 1no = 1.2 MTPANo Change
(11.)Blast Furnace280 m3 + 380 m3 = 0.65 MTPA-280 m3 + 380 m3 = 0.65 MTPANo Change
(12.)Nitrogen Plant-39 TPD39 TPDInclusion of nitrogen plant in EC
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 03 May 2020
(iv)Valid Upto 31 Mar 2022
(v)File No. JSPCB/HO/RNC/CTO-6705935/2020/767 & CTO-8815106
(vi)Application No. Application dated 2020-03-13
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 9.4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 6358584
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 6358584
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coking coal740000Tons per AnnumOpen MarketRoad,Rail500 Fuel Supply AgreementCopy of Linkage
(2.)PG Feed coal48000Tons per AnnumOpen MarketRoad,Rail500 Fuel Supply AgreementCopy of Linkage
(3.)EAF Electrode3384Tons per AnnumOpen MarketRoad,Rail500 Open MarketCopy of Linkage
(4.)Coal (Power Generation)611600Tons per AnnumOpen MarketRail500 Fuel Supply AgreementCopy of Linkage
(5.)PCI176850Tons per AnnumOpen MarketRoad,Rail500 Fuel Supply AgreementCopy of Linkage
(6.)Scrap180000Tons per AnnumOpen MarketRoad,Rail500 Fuel Supply AgreementCopy of Linkage
(7.)Fluxes for SMS152156Tons per AnnumOpen MarketRoad,Rail500 Fuel Supply AgreementCopy of Linkage
(8.)Flux for DRI50000Tons per AnnumOpen MarketRail500 Fuel Supply AgreementCopy of Linkage
(9.)Iron ore fines (Sinter grade)807500Tons per AnnumOpen MarketRoad,Rail500 Fuel Supply AgreementCopy of Linkage
(10.)Fluxes for Sinter197787Tons per AnnumOpen MarketRoad,Rail500 Fuel Supply AgreementCopy of Linkage
(11.)Coal for Sinter30400Tons per AnnumOpen MarketRoad,Rail500 Fuel Supply AgreementCopy of Linkage
(12.)Coal for DRI587500Tons per AnnumOpen MarketRoad,Rail500 Fuel Supply AgreementCopy of Linkage
(13.)Iron ore fines (Pellet)1380000Tons per AnnumOpen MarketRoad,Rail500 Fuel Supply AgreementCopy of Linkage
(14.)Iron ore1342936Tons per AnnumOpen MarketRail500 Fuel Supply AgreementCopy of Linkage
(15.)Fluxes for MBF50471Tons per AnnumOpen MarketRoad,Rail500 Fuel Supply AgreementCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5.3 To 13.2
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.4 To 7.3
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface2223016Copy of Permission LetterPipelineIntake Well6f0ba868e66492ae47e012 Feb 202122740
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Blowdown/Effluent72007200CETPReuse within the Plant & Recycling7200
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7200
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 7200
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)End CutIndustrial Waste23901Tons0RoadCo-Processing
(2.)EAF/LF SlagIndustrial Waste165308Tons0RoadOthersReused / Sold / Disposed
(3.)FES DustIndustrial Waste8320Tons0Road,Conveyor BeltCo-Processing
(4.)Pig IronIndustrial Waste634Tons0RoadCo-Processing
(5.)Pooled IronIndustrial Waste2400Tons0RoadOthersSold
(6.)Laddle SkullIndustrial Waste3585Tons0RoadCo-Processing
(7.)DSC DustIndustrial Waste3933Tons10RoadOthersSold
(8.)Used/Waste OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4Tons10RoadAuthorized Recyclers
(9.)Glass WoolHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3Tons10RoadAuthorized Recyclers
(10.)Tundish SkullIndustrial Waste14858Tons0RoadCo-Processing
(11.)Mill ScalesIndustrial Waste6343Tons0Road,Conveyor BeltCo-Processing
(12.)DRI DE DustIndustrial Waste31466Tons10RoadOthersSold
(13.)MBF SlagIndustrial Waste240000Tons10Road,RailOthersSold
(14.)CharIndustrial Waste70798Tons0RoadCo-Processing
(15.)AshIndustrial Waste199941Tons10RoadOthersOthers
(16.)Flue dust/GCP Sludge/MBF DE dustIndustrial Waste31466Tons0Road,Conveyor BeltCo-Processing
(17.)Mixed wasteIndustrial Waste7200Tons10RoadOthersOthers
(18.)E WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube30200302100
(2.)PM2.5Microgram per Meter Cube1110011160
(3.)SO2Microgram per Meter Cube30003080
(4.)NOxMicrogram per Meter Cube20002080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Coke Oven WHRB 1 (Existing)CO Gas452.3OthersPM, SO2, NOx0.7 g/s, 8.4 g/s, 1.8 g/s
(2.)MBF1 Stock House (Existing)Dust301.2OthersPM0.2 g/s
(3.)Coke Oven WHRB 2 (Existing)CO Gas452.3OthersPM, SO2, NOx0.7 g/s, 8.1 g/s, 1.9 g/s
(4.)MBF1 Ground Hopper (Existing)Dust300.9OthersPM0.1 g/s
(5.)MBF PCI (Existing)Coal301OthersPM0.3 g/s
(6.)WRM RHF (Existing)Mixed Gas551.5OthersPM0.1 g/s
(7.)Sinter Process ESP (Existing)Waste Gases783.5OthersPM3.3 g/s
(8.)MBF2 Stove (Existing)Mixed Gas502.3OthersPM, SO2, NOx0.1 g/s, 0.2 g/s, 0.2 g/s
(9.)Sinter Tail ESP (Existing)Dust503.3OthersPM3.6 g/s
(10.)Pellet Plant (Existing)Producer Gas783.8OthersPM7.6 g/s
(11.)MBF2 Cast House (Existing)Dust302.7OthersPM1.4 g/s
(12.)MBF1 Cast House (Existing)Dust302OthersPM0.5 g/s
(13.)MBF2 Stock House (Existing)Dust302.1OthersPM1.2 g/s
(14.)MBF Raw Material Handling (Existing)Dust301.4OthersPM0.3 g/s
(15.)DRI 2 & 3 (Existing)Coal632.0OthersPM, SO2, NOx1.9 g/s, 42 g/s, 7.9 g/s
(16.)DRI 4 & 5 (Existing)Coal632.5OthersPM, SO2, NOx1.6 g/s, 25.8 g/s, 5.3 g/s
(17.)MBF1 Stove (Existing)Mixed Gas451.6OthersPM, SO2, NOx0.1 g/s ,0 g/s,0.3 g/s
(18.)DRI 1 & 40 tph Boiler (Existing)Coal632.4OthersPM, SO2, NOx1.8 g/s, 26.8 g/s, 3.1 g/s
(19.)FES of SMS1&2 (Existing)Dust465OthersPM5.1 g/s
(20.)25 MW Coal CPP (Existing)Coal802OthersPM, SO2, NOx2.1 g/s, 46.5 g/s, 12.4 g/s
(21.)FES of SMS3 (Existing)Dust435OthersPM4.3 g/s
(22.)Blooming Mill RHF (Existing)Mixed Gas802OthersPM0.1 g/s
(23.)30 MW Coal CPP (Existing)Coal872.6OthersPM, SO2, NOx2 g/s, 72.3 g/s, 20.1 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 200000
(b)Source JSEB + Captive Generation (upto 130 MW)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Captive Power Plant
(e)Stack Height (in m) 87
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 39.62
(c)Government Land (ha.) 1.32
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 110.22
    Total Land (ha.) 151.16
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 5516
(b)Waste/Barren Land (ha.) 443
(c)Grazing/ Community Land (ha.) 18392
(d)Surface Water Bodies (ha.) 811
(e)Settlements (ha.) 3108
(f)Industrial (ha.) 757
(g)Forest (ha.) 2401
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 31428.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt50.03
(2.)OthersBuilt-up area and facilities101.13Total plant area at present in 151.16 ha.
Total (ha.) 151.16
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0NA
(2.)ESZsNone0NA
(3.)CorridorsNone0NA
(4.)Critically Polluted AreaNone0NA
(5.)Wildlife CorridorsDalma-Rugai Elephant Corridor10This corridor connects the forests of Dalma Wildlife Sanctuary with the Rugai Protected Forest (Jorai Pahar). Elephants cross National Highway 33 near Ramgarh village and then pass through agricultura
(6.)WLSElephants10Elephants are found in 10 Km Buffer zone of project boundary.
(7.)ESAsNone0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0NA
(2.)Defence InstallationsNone0NA
(3.)ForestOpen Forest and PFs10Several small patches of Open Forest and Protected Forests Present in Buffer Zone
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 151.16
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kharkai River located south east of the plant site and crossing the buffer zone from Noth East to South West
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 4.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 0
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt31.9818.0550.03
(2.)Percentage of Total Project Area211233
(3.)No. of Plants311273000061127
(4.)Funds Allocated03470000034700000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalReduced resource requirement without increase in overall plant capacity
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Taluk Courts
(c)Name of the Sub Court
(d)Case No. 93 of 2012 and 130 of 2015
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Pending before SDM, Saraikela
(f)Case Details Issues related to Environmental Pollution Control
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/RA 0195
(ii)Name of the EIA Consultant MECON Limited, Ranchi
(iii)Address Vivekananda Path, P.O. Doranda, Ranchi, Jharkhand
(iv)Mobile No. 9470193930
(v)Landline No. 0651248325
(vi)Email Id envenggranchi@meconlimited.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 09 Feb 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVilas N Gaikwad
DesignationSr. General Manager (SHE & S)
Name of Company (Applicant Name should not be given here)M/S.TATA STEEL LONG PRODUCTS LIMITED( FORMERLY KNOWN AS M/S TATA SPONGE IRON LIMITED )
AddressBeleipada Village, Joda Tehsil
Print