1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Environment Clearance for Change in Configuration of the Existing 1.2 MTPA Integrated Steel Plant of TataSteel Long Products Limited at Adityapur Industrial Area, Village Gamharia, Saraikela-Kharsawan, Jharkhand | (b)Name of the Company / Organisation | M/S.TATA STEEL LONG PRODUCTS LIMITED( FORMERLY KNOWN AS M/S TATA SPONGE IRON LIMITED ) | (c)Registered Address | Beleipada Village, Joda Tehsil,,Keonjhar,Orissa-758034 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Vilas N Gaikwad | (b)Designation (Owner/ Partner/ CEO) | Sr. General Manager (SHE & S) | (c)Address | At/Po: Bileipada, Joda, Dist: Keonjhar, Odisha,,,Keonjhar,Orissa-758034 | (d)Pin code | 758034 | (e)E-mail | vilas.gaikwad@tatasteellp.com | (f)STD Code. | 6767(f)Telephone No. | 278178 | (g)Fax No. | 278179 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| (b)Category | A | (c)Proposal Number | IA/JH/IND/207765/2021 | (d)Master Proposal Number(Single Window) | SW/207764/2021 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Modernization under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Thana no 66,67,69,117,118,119 | (b)Pincode | 832108 | (c)Bounded Latitudes (North) | | From | | Degree | 22.793636 | Minutes | | Second | | From | | Degree | 22.815134 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 86.080884 | Minutes | | Second | | From | | Degree | 86.099313 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F45I1 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 162 | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | 4 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Jharkhand | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Jharkhand | Seraikela Kharsawan | Adityapur | Gamharia | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Ranchi | (iii)Letter No. | 103-314/11/EPE | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Nov 19 2020 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Steel | 1200000 | 0 | 1200000 | Tons per Annum(TPA) | | Road,Rail | | (2.) | Pellets | 1200000 | 0 | 1200000 | Tons per Annum(TPA) | | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Iron Ore WashingPlant | 2.7 MTPA | - | 2.7 MTPA | No Change | (2.) | Rolling Mill | WRM + Blooming Mill = 1.2 MTPA | - | WRM + Blooming Mill = 1.2 MTPA | No change | (3.) | Coke Ovens | 2 batteries, 96 ovens= 0.5 MTPA | - | 2 batteries, 96 ovens= 0.5 MTPA | No Change | (4.) | Power Plant | 25+30+30 MW (Coal) +30 MW (WHR) +15 MW Mix=130 MW | Convert 30 MW from coal to Waste Heat Recovery | 25+30 MW (Coal)+ 30+30 MW (WHR) +15 MW Mix=130 MW | Increase in green energy power generation | (5.) | Oxygen Plant | 220 tpd | - | 220 tpd | No Change | (6.) | DRI Kilns | 5 rotary Kiln of 350 TPD each = 0.625 MTPA | - | 5 rotary Kiln of 350 TPD each = 0.625 MTPA | No Change | (7.) | Pellet Plant | 168 m2 Grate Kiln technology = 1.2 MTPA | 3 no of PG Plant for Fuel | 168 m2 Grate Kiln technology with PG as fuel =1.2 | Inclusion of PG Plants in EC letter | (8.) | Sinter Plant | 80 m2 Straight grate =0.6 MTPA | Increase in Capacity to 0.95 MTPA | 80 m2 Straight grate = 0.95 MTPA | Existing plantcapacity is 0.95 MTPA installed by erstwhile UML | (9.) | Continuous Casting | 2X3 + 1X2 + 1X4 Strand Billet Caster =1.2 MTPA | - | 2X3 + 1X2 + 1X4 Strand Billet Caster =1.2 MTPA | No Change | (10.) | Steel Melt Shop (EAF) | 40MT - 2 nos 70MT - 1no = 1.2 MTPA | - | 40MT - 2 nos 70MT - 1no = 1.2 MTPA | No Change | (11.) | Blast Furnace | 280 m3 + 380 m3 = 0.65 MTPA | - | 280 m3 + 380 m3 = 0.65 MTPA | No Change | (12.) | Nitrogen Plant | - | 39 TPD | 39 TPD | Inclusion of nitrogen plant in EC | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 03 May 2020 | (iv)Valid Upto | 31 Mar 2022 | (v)File No. | JSPCB/HO/RNC/CTO-6705935/2020/767 & CTO-8815106 | (vi)Application No. | Application dated 2020-03-13 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 0 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 9.4 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 6358584 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 6358584 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coking coal | 740000 | Tons per Annum | | Open Market | Road,Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (2.) | PG Feed coal | 48000 | Tons per Annum | | Open Market | Road,Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (3.) | EAF Electrode | 3384 | Tons per Annum | | Open Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (4.) | Coal (Power Generation) | 611600 | Tons per Annum | | Open Market | Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (5.) | PCI | 176850 | Tons per Annum | | Open Market | Road,Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (6.) | Scrap | 180000 | Tons per Annum | | Open Market | Road,Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (7.) | Fluxes for SMS | 152156 | Tons per Annum | | Open Market | Road,Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (8.) | Flux for DRI | 50000 | Tons per Annum | | Open Market | Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (9.) | Iron ore fines (Sinter grade) | 807500 | Tons per Annum | | Open Market | Road,Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (10.) | Fluxes for Sinter | 197787 | Tons per Annum | | Open Market | Road,Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (11.) | Coal for Sinter | 30400 | Tons per Annum | | Open Market | Road,Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (12.) | Coal for DRI | 587500 | Tons per Annum | | Open Market | Road,Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (13.) | Iron ore fines (Pellet) | 1380000 | Tons per Annum | | Open Market | Road,Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (14.) | Iron ore | 1342936 | Tons per Annum | | Open Market | Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (15.) | Fluxes for MBF | 50471 | Tons per Annum | | Open Market | Road,Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 5.3 To 13.2 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.4 To 7.3 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 22230 | 16 | Copy of Permission Letter | Pipeline | | Intake Well | | 6f0ba868e66492ae47e0 | 12 Feb 2021 | 22740 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Blowdown/Effluent | 7200 | 7200 | CETP | Reuse within the Plant & Recycling | | 7200 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 7200 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 7200 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | End Cut | Industrial Waste | | 23901 | Tons | 0 | Road | | Co-Processing | | (2.) | EAF/LF Slag | Industrial Waste | | 165308 | Tons | 0 | Road | | Others | Reused / Sold / Disposed | (3.) | FES Dust | Industrial Waste | | 8320 | Tons | 0 | Road,Conveyor Belt | | Co-Processing | | (4.) | Pig Iron | Industrial Waste | | 634 | Tons | 0 | Road | | Co-Processing | | (5.) | Pooled Iron | Industrial Waste | | 2400 | Tons | 0 | Road | | Others | Sold | (6.) | Laddle Skull | Industrial Waste | | 3585 | Tons | 0 | Road | | Co-Processing | | (7.) | DSC Dust | Industrial Waste | | 3933 | Tons | 10 | Road | | Others | Sold | (8.) | Used/Waste Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4 | Tons | 10 | Road | | Authorized Recyclers | | (9.) | Glass Wool | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3 | Tons | 10 | Road | | Authorized Recyclers | | (10.) | Tundish Skull | Industrial Waste | | 14858 | Tons | 0 | Road | | Co-Processing | | (11.) | Mill Scales | Industrial Waste | | 6343 | Tons | 0 | Road,Conveyor Belt | | Co-Processing | | (12.) | DRI DE Dust | Industrial Waste | | 31466 | Tons | 10 | Road | | Others | Sold | (13.) | MBF Slag | Industrial Waste | | 240000 | Tons | 10 | Road,Rail | | Others | Sold | (14.) | Char | Industrial Waste | | 70798 | Tons | 0 | Road | | Co-Processing | | (15.) | Ash | Industrial Waste | | 199941 | Tons | 10 | Road | | Others | Others | (16.) | Flue dust/GCP Sludge/MBF DE dust | Industrial Waste | | 31466 | Tons | 0 | Road,Conveyor Belt | | Co-Processing | | (17.) | Mixed waste | Industrial Waste | | 7200 | Tons | 10 | Road | | Others | Others | (18.) | E Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 15 | Tons | 10 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 302 | 0 | 0 | 302 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 111 | 0 | 0 | 111 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 30 | 0 | 0 | 30 | 80 | (4.) | NOx | | Microgram per Meter Cube | 20 | 0 | 0 | 20 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Coke Oven WHRB 1 (Existing) | CO Gas | 45 | 2.3 | Others | PM, SO2, NOx | 0.7 g/s, 8.4 g/s, 1.8 g/s | (2.) | MBF1 Stock House (Existing) | Dust | 30 | 1.2 | Others | PM | 0.2 g/s | (3.) | Coke Oven WHRB 2 (Existing) | CO Gas | 45 | 2.3 | Others | PM, SO2, NOx | 0.7 g/s, 8.1 g/s, 1.9 g/s | (4.) | MBF1 Ground Hopper (Existing) | Dust | 30 | 0.9 | Others | PM | 0.1 g/s | (5.) | MBF PCI (Existing) | Coal | 30 | 1 | Others | PM | 0.3 g/s | (6.) | WRM RHF (Existing) | Mixed Gas | 55 | 1.5 | Others | PM | 0.1 g/s | (7.) | Sinter Process ESP (Existing) | Waste Gases | 78 | 3.5 | Others | PM | 3.3 g/s | (8.) | MBF2 Stove (Existing) | Mixed Gas | 50 | 2.3 | Others | PM, SO2, NOx | 0.1 g/s, 0.2 g/s, 0.2 g/s | (9.) | Sinter Tail ESP (Existing) | Dust | 50 | 3.3 | Others | PM | 3.6 g/s | (10.) | Pellet Plant (Existing) | Producer Gas | 78 | 3.8 | Others | PM | 7.6 g/s | (11.) | MBF2 Cast House (Existing) | Dust | 30 | 2.7 | Others | PM | 1.4 g/s | (12.) | MBF1 Cast House (Existing) | Dust | 30 | 2 | Others | PM | 0.5 g/s | (13.) | MBF2 Stock House (Existing) | Dust | 30 | 2.1 | Others | PM | 1.2 g/s | (14.) | MBF Raw Material Handling (Existing) | Dust | 30 | 1.4 | Others | PM | 0.3 g/s | (15.) | DRI 2 & 3 (Existing) | Coal | 63 | 2.0 | Others | PM, SO2, NOx | 1.9 g/s, 42 g/s, 7.9 g/s | (16.) | DRI 4 & 5 (Existing) | Coal | 63 | 2.5 | Others | PM, SO2, NOx | 1.6 g/s, 25.8 g/s, 5.3 g/s | (17.) | MBF1 Stove (Existing) | Mixed Gas | 45 | 1.6 | Others | PM, SO2, NOx | 0.1 g/s ,0 g/s,0.3 g/s | (18.) | DRI 1 & 40 tph Boiler (Existing) | Coal | 63 | 2.4 | Others | PM, SO2, NOx | 1.8 g/s, 26.8 g/s, 3.1 g/s | (19.) | FES of SMS1&2 (Existing) | Dust | 46 | 5 | Others | PM | 5.1 g/s | (20.) | 25 MW Coal CPP (Existing) | Coal | 80 | 2 | Others | PM, SO2, NOx | 2.1 g/s, 46.5 g/s, 12.4 g/s | (21.) | FES of SMS3 (Existing) | Dust | 43 | 5 | Others | PM | 4.3 g/s | (22.) | Blooming Mill RHF (Existing) | Mixed Gas | 80 | 2 | Others | PM | 0.1 g/s | (23.) | 30 MW Coal CPP (Existing) | Coal | 87 | 2.6 | Others | PM, SO2, NOx | 2 g/s, 72.3 g/s, 20.1 g/s | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 200000 | (b)Source | JSEB + Captive Generation (upto 130 MW) | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | Captive Power Plant | (e)Stack Height (in m) | 87 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 39.62 | (c)Government Land (ha.) | 1.32 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 110.22 | Total Land (ha.) | 151.16 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 5516 | (b)Waste/Barren Land (ha.) | 443 | (c)Grazing/ Community Land (ha.) | 18392 | (d)Surface Water Bodies (ha.) | 811 | (e)Settlements (ha.) | 3108 | (f)Industrial (ha.) | 757 | (g)Forest (ha.) | 2401 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 31428.0000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 50.03 | | (2.) | Others | Built-up area and facilities | 101.13 | Total plant area at present in 151.16 ha. | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | None | 0 | NA | (2.) | ESZs | None | 0 | NA | (3.) | Corridors | None | 0 | NA | (4.) | Critically Polluted Area | None | 0 | NA | (5.) | Wildlife Corridors | Dalma-Rugai Elephant Corridor | 10 | This corridor connects the forests of Dalma Wildlife Sanctuary with the Rugai Protected Forest (Jorai Pahar). Elephants cross National Highway 33 near Ramgarh village and then pass through agricultura | (6.) | WLS | Elephants | 10 | Elephants are found in 10 Km Buffer zone of project boundary. | (7.) | ESAs | None | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None | 0 | NA | (2.) | Defence Installations | | None | 0 | NA | (3.) | Forest | | Open Forest and PFs | 10 | Several small patches of Open Forest and Protected Forests Present in Buffer Zone | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 151.16 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kharkai River located south east of the plant site and crossing the buffer zone from Noth East to South West | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 4.2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 0 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 31.98 | 18.05 | 50.03 | (2.) | Percentage of Total Project Area | 21 | 12 | 33 | (3.) | No. of Plants | 31127 | 30000 | 61127 | (4.) | Funds Allocated | 0 | 34700000 | 34700000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Reduced resource requirement without increase in overall plant capacity | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | Taluk Courts | (c)Name of the Sub Court | | (d)Case No. | 93 of 2012 and 130 of 2015 | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | Pending before SDM, Saraikela | (f)Case Details | Issues related to Environmental Pollution Control | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/2023/RA 0195 | (ii)Name of the EIA Consultant | MECON Limited, Ranchi | (iii)Address | Vivekananda Path, P.O. Doranda, Ranchi, Jharkhand | (iv)Mobile No. | 9470193930 | (v)Landline No. | 0651248325 | (vi)Email Id | envenggranchi@meconlimited.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 09 Feb 2023 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Vilas N Gaikwad | Designation | Sr. General Manager (SHE & S) | Name of Company (Applicant Name should not be given here) | M/S.TATA STEEL LONG PRODUCTS LIMITED( FORMERLY KNOWN AS M/S TATA SPONGE IRON LIMITED ) | Address | Beleipada Village, Joda Tehsil |
|