Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Cement plant with increase Of Clinker Production from 1.19 to 1.428 MTPA & Cement Production capacity from 1.80 to 2.16 MTPA by The India Cements Limited – Banswara, Under Clause 7(ii) of SO 1533 (E) - EIA Notification 2006.
(b)Name of the Company / Organisation THE INDIA CEMENTS LIMITED BANSWARA WORKS
(c)Registered Address VILLAGE VAJWANA TEHSEEL GARHI DISTRICT BANSWARA,,Banswara,Rajasthan-327025
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant YATENDRA SHAH
(b)Designation (Owner/ Partner/ CEO) JT PRESIDENT MANUFACTURING
(c)Address VILLAGE VAJWANA TEHSEEL GARHI DISTRICT BANSWARA,,Garhi,Banswara,Rajasthan-327025
(d)Pin code 327025
(e)E-mail bans_env@indiacements.co.in
(f)STD Code. 0(f)Telephone No.
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/IND/191793/2021
(d)Master Proposal Number(Single Window) SW/191791/2021
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 157/1,1982/550,1986/555,581/1,589/1,653/1,634/1, 5
(b)Pincode 327025
(c)Bounded Latitudes (North)
From
Degree 2609762.26
Minutes
Second
From
Degree 2611232.03
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 423767.18
Minutes
Second
From
Degree 424364.81
Minutes
Second
(e)Survey of India Topo Sheet No. 46/I/6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 200
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4.0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/ENV/R/IND-123/787/2010/1127 dated 16.12.2020
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Nov 26 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cement1.800.362.16OthersMillion Tonnes Per AnnumRoad
(2.)Power25025Mega Watt(MW)OthersCaptive
(3.)Limestone1.87201.872OthersMillion Tonnes Per AnnumRoad
(4.)Clinker1.190.2381.428OthersMillion Tonnes Per AnnumOthersClinker used to manufacture the Cement.
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Coal Mill40 TPH040 TPHRun hours 16 and by increasing 20 hrs, fine coal will be sufficient for increased 20% capacity.
(2.)Cement Mill-I135 TPH0135 TPHAdequate Capacity
(3.)Cement Mill-II135 TPH0135 TPHAdequate Capacity
(4.)Raw meal275 TPH0275 TPHAdequate and quite possibly to run the VRM 22 to 24 hours per day
(5.)Cooler145 TPH30 TPH175 TPHRetrofitting to increase cooler area
(6.)Limestone crusher450 TPH0450 TPHAdequate. Operational hours increased from 13 to 16 hrs
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 02 Jan 2017
(iv)Valid Upto 30 Sep 2021
(v)File No. F(Tech)/Banswara(Garhi)/2(1)/2009-2010/9295-9297,
(vi)Application No. F(Tech)/Banswara(Garhi)/2(1)/2009-2010/9295-9297,
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 10
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.25
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3178000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3178000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Pet coke for Cement Plant (100% basis).50000Tons per AnnumRIL, JamnagarRoad490 Open MarketCopy of Linkage
(2.)Coal100000Tons per AnnumWCL/SECL (Indian coal),Road,Rail600 Open MarketCopy of Linkage
(3.)Limestone1869000Tons per AnnumCaptive MineRoad0.5 CaptiveCopy of Linkage
(4.)Yellow Ochre215000Tons per AnnumPurchasedRoad50 Open MarketCopy of Linkage
(5.)GYPSUM110000Tons per AnnumRSMML, Dhankoriya, NagaurRoad580 Open MarketCopy of Linkage
(6.)Dolomite74000Tons per AnnumPurchasedRoad50 Open MarketCopy of Linkage
(7.)Fly ash760000Tons per AnnumLocal Units, Sewalia, GujaratRoad50 Open MarketCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 36
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 32 To 52
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater25000Copy of Permission LetterPipelineTube WellNo. 21- 4(319)/WR/CGWA/2008- 85527 Nov 20192600
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial purpose100130ETPGreen Belt Renewal Plant100
(2.)Domestic Waste Water160200STPGreen Belt Renewal Plant160
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 260
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 260
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3Kilolitre50RoadAuthorized Recyclers
(2.)Ash from Captive power plantFly Ash81760Tons0OthersPNEUMATICOthersused in cement plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube36.10.21.037.160
(2.)SO2Microgram per Meter Cube12.10.41.013.180
(3.)PM10Microgram per Meter Cube53.60.20.454100
(4.)NOxMicrogram per Meter Cube17.70.47.825.580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Cement mill-2-450.9PM100.32
(2.)Raw mill&kilnCoal463.1NOx79.21
(3.)Raw mill&kilncoal463.1PM102.97
(4.)Cooler-383.0PM101.94
(5.)Raw mill&kilnCoal463.1SO29.90
(6.)Cement mill-1-450.9PM100.32
(7.)Coal Mill-621.3PM100.59
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 25000
(b)Source Captive Power Plant & RSEB
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 90
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 20.81
(c)Government Land (ha.) 45.22
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 66.03
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 14368
(b)Waste/Barren Land (ha.) 7232
(c)Grazing/ Community Land (ha.) 1664
(d)Surface Water Bodies (ha.) 480
(e)Settlements (ha.) 1088
(f)Industrial (ha.) 1088
(g)Forest (ha.) 6080
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : None 0
    Total (ha.) 32000.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant23.55Cement Plants & CPP - In Ha.
(2.)Township9.8Colony - In Ha.
(3.)Green belt24Greenbelt in plant and colony - in Ha.
(4.)OthersParking & Open land8.68Parking - 04.15 Ha,Open area - 04.53 Ha.
Total (ha.) 66.03
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0-
(2.)NPANone0-
(3.)ESAsNone0-
(4.)CorridorsNone0-
(5.)ESZsNone0-
(6.)Critically Polluted AreaNone0-
(7.)Wildlife CorridorsNone0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestReserve Forest Near Partipura Village0.2E
(2.)Defence InstallationsNone0-
(3.)Archaeological SitesNone0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 66.03
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Owned by The India Cements Limited
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Chap Nadi
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 610
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 610
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt24024
(2.)Percentage of Total Project Area36036
(3.)Funds Allocated2000000200000
(4.)No. of Plants12318012318
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental1. No Additional discharge of waste water. 2. No Additional land requirement 3. No Additional water consumption.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0174
(ii)Name of the EIA Consultant B S Envi-Tech Pvt. Ltd
(iii)Address 12-13-1270/71/73, Amity Ville, 4th Floor, Beside Spencer Super Market, St. Ann’s Road, Tarnaka, Secunderabad-500017
(iv)Mobile No. 9848053012
(v)Landline No. 0404978306
(vi)Email Id info@bsenvitech.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 16 Nov 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAFrom PFR it appears that, proposal involves enhancement in production of clinker and cement by optimizing the existing process. However nothing is written about enhancement of pollution load. In case of no increase in pollution load, PP may follow the procedure stated in the Notification No. S.O. 236(E). dt. 16th January, 2020. 15 Jan 2021
2.NAThe correction have been made as per the instruction received 16 Jan 2021
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantYATENDRA SHAH
DesignationJT PRESIDENT MANUFACTURING
Name of Company (Applicant Name should not be given here)THE INDIA CEMENTS LIMITED BANSWARA WORKS
AddressVILLAGE VAJWANA TEHSEEL GARHI DISTRICT BANSWARA