1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Amrapali Expansion Opencast Coal Mine (25 MTPA-Nominal and 35 MTPA-Peak) Phase-1 | (b)Name of the Company / Organisation | Central Coalfields Limited | (c)Registered Address | DARBHANGA HOUSE, CCL, RANCHI,,Ranchi,Jharkhand-834029 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Devendra Prasad | (b)Designation (Owner/ Partner/ CEO) | PO | (c)Address | Office of Project officer, Amrapali , P.O.- Saradhu, PS- Tandwa, DIst- Chatra,,,Chatra,Jharkhand-825321 | (d)Pin code | 825321 | (e)E-mail | poamrapaliccl@gmail.com | (f)STD Code. | 6531(f)Telephone No. | 236004 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/JH/CMIN/123390/2019 | (d)Master Proposal Number(Single Window) | SW/187249/2020 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Block Covered under Survey of India Toposheet no: | (b)Pincode | 825321 | (c)Bounded Latitudes (North) | | From | | Degree | 23.859722 | Minutes | | Second | | From | | Degree | 23.977222 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 84.981944 | Minutes | | Second | | From | | Degree | 85.035277 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73A-13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 501 | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | 0.45 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Jharkhand | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | F. No.J-11015/109/2003-IA (M) | (c)Date of Issue of TOR | | (f)Previous TOR Letter | NA | (b)Date of Apply of EC | 10 Jan 2020 | (c)Date of Issue of EC | 20 Mar 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 17 Nov 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Project Office, village- Honhe | State : | Jharkhand | District : | Chatra | Tehsil : | Tandwa | Village : | Honhe |
| 188 | Brief issues raised during Public hearings are related to storage of Top-soil, employment generation, Air, water, Noise Pollution, Impact of blasting & vibration, R&R, facility of doctors & hospitals, | Others | Additional Collector | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Ranchi | (iii)Letter No. | 103-557/ROR-2020/4447 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Dec 21 2020 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Capacity | 14400000 | 10600000 | 25000000 | Tons per Annum(TPA) | | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Life | 9 Years | 4 years | 4 years | | (2.) | Capacity | 14.40 MTPA | 25 MTPA` | 25 MTPA` | | (3.) | Mineable reserves | 114.59 Mt | 79.50 Mte | 79.50 Mte | | (4.) | Project Area | 619.87 ha | 619.87 ha | 619.87 ha | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 01 Sep 2020 | (iv)Valid Upto | 30 Jun 2021 | (v)File No. | JSPCB/HO/RNC/CTO-6645615 | (vi)Application No. | 6645615 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 5136.15 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1220.04 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.2 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1058176 | (b)Existing quantity of raw material/fuel | 5290880 | (c)Total quantity of raw material/fuel | 6349056 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Explosives | 6349056 | Others | kg per annum | Rated contract | Road | | 5 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 02 Mar 2020 To 15 May 2020 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 78 | 53 | 77.08 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 39 | 12.21 | 37.20 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 23.50 | 8.20 | 20.46 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 41 | 23 | 39.60 | 60 | |
14.2. No. of Ground Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 296 | 58 | 296 | 500 | (2.) | Total Hardness | | | mg/l | | 196 | 42 | 196 | 200 | (3.) | Chlorides | | | mg/l | | 24 | 8 | 24 | 250 | (4.) | Fluoride | | | mg/l | | 1.37 | 0.16 | 1.37 | 1.5 | (5.) | Others | Calcium | | mg/l | | 44.8 | 7.2 | 44.8 | 75 | (6.) | Others | Iron | | mg/l | | 0.06 | 0.06 | 0.06 | 0.3 | (7.) | Heavy Metals | | Lead | mg/l | | 0 | 0 | 0 | 0.01 | (8.) | pH | | | NA | | 7.02 | 5.84 | 7.02 | 8.5 | (9.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6 | 5 | B | (2.) | COD | | mg/l | | 36 | 16 | B | (3.) | pH | | NA | | 7.96 | 6.64 | B | (4.) | BOD | | mg/l | | 2.2 | 2 | B | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 52 | 31 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 52 | 31 | 75 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 174 | 152 | (2.) | K(Potassium) | Kilogram per hectare | | 176 | 147 | (3.) | pH | | | 8.2 | 5.5 | (4.) | P(Phosphorus) | Kilogram per hectare | | 7.14 | 5.62 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.02 | 0.01 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.85 To 11 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.95 To 4.55 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4/699/JH/MIN/2020 | (f)Date of Issue | 29 Nov 2020 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Mine discharge | 2280 | 0 | Copy of Permission Letter | Pipeline | | Others | mine pump | 21-4/699/JH/MIN/2020 | 29 Nov 2020 | 2280 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 288 | 350 | Sewage treatment Plant with secondary biological treatment with activated sludge process | Others | Irrigation and nearby villages | 113 | 175 | (2.) | Industrial | 76 | 92 | ETP with oil and grease trap and settling pond | Reuse within the Plant & Recycling,Others | Reuse within the Plant and re | 61 | 15 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 364 | (b)Total Discharged Water (Kilolitre per Day) | 190 | (c)Total Reused Water (Kilolitre per Day) | 174 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Municipal Solid waste | Municipal Solid Waste | | 450 | Tons | 10 | Road | | Sanitary Landfills | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 37.20 | 3.6 | 2.09 | 39.30 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 77.08 | 3.6 | 13.10 | 90.20 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 39.62 | 3.6 | 2.73 | 42.35 | 60 | (4.) | NOx | | Microgram per Meter Cube | 20.46 | 3.6 | 10.47 | 30.93 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | Others | NA | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 50000 | (b)Source | 250 KVA,11 KVA/440 Volt through JVVNL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 531.64 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 88.23 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 619.87 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 73 | (b)Waste/Barren Land (ha.) | 104.87 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 3 | (e)Settlements (ha.) | 25 | (f)Industrial (ha.) | 288 | (g)Forest (ha.) | 118 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Plantation | 8 | Total (ha.) | 619.8700 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0 | | (2.) | Township | | 0 | | (3.) | Green belt | | 18.59 | | (4.) | Ash Pond | | 0 | | (5.) | Quarry Area | | 425.22 | | (6.) | OB Dump Area | | 89.16 | | (7.) | Safety Zone | | 10.33 | | (8.) | Tailing Pond | | 0 | | (9.) | LandFill | | 0 | | (10.) | Water Reservoir | | 0 | | (11.) | Desalination Plant | | 0 | | (12.) | Area for Solid Waste Management | | 0 | | (13.) | Built Up Area | | 60.75 | Industrial Area workshop,substation, haul road etc | (14.) | Others | Nala diversion etc | 15.82 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | Not applicable | 0 | Not applicable | (2.) | WLS | Not applicable | 0 | Not applicable | (3.) | ESAs | Not applicable | 0 | Not applicable | (4.) | ESZs | Not applicable | 0 | Not applicable | (5.) | Corridors | Not applicable | 0 | Not applicable | (6.) | Critically Polluted Area | Not applicable | 0 | Not applicable | (7.) | Wildlife Corridors | Not applicable | 0 | Not applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | 531.64 | 0 | In the core zone 531.64 ha is present which has been issued Stage-II FC | (2.) | Defence Installations | | Not applicable | 0 | Not applicable | (3.) | Archaeological Sites | | Not applicable | 0 | Not applicable | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 619.87 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 5 | (b)No. of Households | 260 | (c)No. of PDFs (Project Displaced Families) | 260 | (d)No. of PAFs (Project Affected Families) | 260 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 21908 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | According to the conservation plan only two schedule-I species i.e. Python and Peafowl are present in the buffer zone of the project.There is no schedule-I species in the core zone of the project. | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | Rs.4087.50 lakh | (iii)Period of Implementation | 5 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | The seasonal Dudhmatia Nala, which flows from west to east in the north of the project. | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | The seasonal Dudhmatia Nala, which flows from west to east in the north of the project through the project boundary, needs to be diverted along a stretch of 1,500 m. The diversion of nala is proposed | (ii)Details of Study Conducted | Detailed Nala Diversion study and design of divert | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Chundru and Barki rivers flowing west to east and north to south respectively control the drainage of the block. The Chundru River marks the Southern boundary of the block whereas Barki River is the eastern limit of the property at a safe distance. | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 1.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 1575 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 1575 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 2 | 24.12 | 26.12 | (2.) | Percentage of Total Project Area | 0.3 | 3.89 | 4.19 | (3.) | No. of Plants | 5000 | 60300 | 65300 | (4.) | Funds Allocated | 700000 | 8440000 | 9140000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Contribution to exchequer | (2.) | Environmental | Enhancement of post mining green cover | (3.) | Social | It will provide direct and indirect employment opportunities | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 25 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | CS/2020/BM/494/4(6) | (b)Date of Approval | 04 Dec 2020 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | CCL BOARD | (e)Approved Mining Lease Area | 619.87 | (f)Approved Capacity | 25 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 689.81 | (b)Mineable Reserves (Million Ton) | 79.5 | (c)Extractable Reserves(Million Ton) | 79.5 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | G-11 | (f)Stripping Ratio | 83.71 : 79.5 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 3-7 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 4 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 8 | (c)Thickness of seams to be worked on | 20 | (d)Maximum Thickness of Seams (metres) | 20 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 619.87 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | acquired under CBA SO No: 1381 dt. 06.05.2003 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | acquired under CBA SO No: 1381 dt. 06.05.2003 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | acquired under CBA SO No: 1381 dt. 06.05.2003 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 1 | (ii)Total Area (in Hectare) | 89.16 | (iii)Height (in meter) | 60 | (iv)Quantity (in Million Cubic meter) | 24.41 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 2 | (ii)Total Area (in Hectare) | 271.71 | (iii)Height (in meter) | 530 | (iv)Quantity (in Million Cubic meter) | 74.95 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 2.5 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 2.5 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 153.51 | (b)Depth (in meter) | 90 | (c)Volume (in Million Cubic meter) | 137.7 | |
|
12. | Details of Quarry: | (a)Final Void of 153.51 (hectare) at a Depth of 90 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 425.22 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Dumpers | (b)Surface to Siding/Loading | Tipping trucks | (c)Transportation / Conveyor Details | At present coal is being transported by tipping tr | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | WASTE LAND | | 104.87 | 0 | 104.87 | (2.) | OTHERS(Specify) | Plantation scrubs mining area | 384 | 0 | 384 | (3.) | GRAZING LAND | | 0 | 0 | 0 | (4.) | SURFACE WATER BODIES | | 3 | 0 | 3 | (5.) | AGRICULTURE LAND | | 73 | 0 | 73 | (6.) | FOREST LAND | | 30 | 0 | 30 | (7.) | SETTLEMENTS | | 25 | 0 | 25 | |
TOTAL | 619.87 | 0 | 619.87 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 178 | 0 | 247.22 | | 425.22 | (2.) | EXTERNAL OB DUMPS | | 77.16 | 0 | 12 | | 89.16 | (3.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 60.75 | | 60.75 | (4.) | Other | Nala diversion embankment | 0 | 0 | 15.82 | | 15.82 | (5.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (6.) | ROADS | | 0 | 0 | 0 | | 0 | (7.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (8.) | GREEN BELT | | 26.12 | 0 | 2.8 | | 28.92 | (9.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | |
TOTAL | 281.28 | 0 | 338.59 | 0 | 619.87 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 77.16 | (b)Internal Dump(in hectare) | 178 | (c)Quarry(in hectare) | 42.83 | (d)Safety Zone(in hectare) | 26.12 | (e)Final Void of 247.22 (hectare) at a Depth of 90 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 281.28 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2015 | 12 | 12 | 12 | 4.79 | 0 | (2.) | 2017 | 12 | 12 | 12 | 6.50 | 0 | (3.) | 2014 | 12 | 12 | 12 | 2.55 | 0 | (4.) | 2016 | 12 | 12 | 12 | 6.50 | 0 | (5.) | 2018 | 12 | 12 | 12 | 10.2 | 0 | (6.) | 2019 | 14.4 | 14.4 | 16.8 | 12.79 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | NGT | (c)Name of the Sub Court | NGT Eastern Zone | (d)Case No. | 28/2020/EZ | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | NGT order is enclosed | (f)Case Details | NGT order is enclosed | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/SA 0108 Dt. 22.08.2021. | (ii)Name of the EIA Consultant | CMPDIL | (iii)Address | Gondwana Place, Kanke Road, Ranchi, Jharkhand | (iv)Mobile No. | 8987789101 | (v)Landline No. | 0651279222 | (vi)Email Id | gmenv.cpmdi@yahoo.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 22 Aug 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | You are requested to submit the following details:
a. Certified compliance of previous EC for instant expansion
b. Consent to Operate for 14.4 MTPA based on previous EC
c. NOC from Central Ground Water Authority
d. Detailed conservation plan for schedule - I species
e. Approved Mine Plan including Mine Closure Plan for 35 MTPA proposed capacity
f. Status of Hon'ble NGT case
g. Status of Showcause notice issued by this Ministry dated 12th December, 2018
h. Letter from Member Secretary, JSPCB to Secretary (MoEF&CC) regarding details of Public Hearing | 01 Jan 2021 | 2. | NA | The correction have been made as per the instruction received | 20 Jan 2021 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Respected Sir,
Please find enclosed the reply to the observation of 8th EAC (Coal) meeting held on 11.02.2021. | 04 Mar 2021 | 2. | NA | The EAC after detailed deliberations observed that there are various non-compliance highlighted by Ministry’s Regional Office and also since obtaining EC of 14.4 MTPA in March 2020, PP has not yet received Consent to Operate from State Pollution Control Board. In a haste of achieving production target, PP should not overlook the compliance of EC conditions. PP however, submitted the information during course of minutes which is reported to be committed for compliance, but the committee desired for concrete and tangible action for further consideration.
Further, the air pollution mitigation measures proposed and committed during earlier expansion are not yet installed and only timeline is being proposed. It was observed that adequate pollution mitigation measures in project are still lacking in terms of transportation, plantation, dust control and water pollution. Therefore, the EAC after detailed deliberation was of the view that proposal requires further examination. In view of this EAC desired, that PP has to first focus on compliance of EC conditions. PP shall further submit the details on the following points.
`
(i) PP shall submit compliance of EC conditions which are still non-complied with proof/photographs. PP shall submit proper Action plan with Time Line
(ii) Revised capital estimate for environment protection measures submitted by PP is inadequate and prepared inappropriately. Therefore, documents required to be substantiated on ground measures. PP shall submit measures taken on ground and then submits the enhanced protection measures
(iii) PP shall submit one-month noise monitoring data conducted at night time and vibration monitoring data, data of treated effluent from ETP.
(iv) PP shall submit the riverine/riparian ecosystem conservation and management plan.
(v) PP should show on a surface plan (5-year interval for life of mine) of suitable scale the area to be covered under afforestation & green belt clearly mentioning the latitude and longitude of the area to be covered during each 5 years.
(vi) Plan for coal transportation from pithead to Amrapali Railway Siding through belt conveyer to be completed in 2 years with committed plan of actual status.
(vii) Plan, design, alignment for diversion of stream and environment mitigation measures to be adopted along the diverted stream.
(viii) PP shall submit Environmental Capital Expenditure by excluding Cost of rehabilitation. R&R cost should never be considered as Environmental expenditure.
(ix) Environment Mitigation measures for the villages involved in R&R i.e. Manwatongri and Binglat till they are rehabilitated and other villages nearby.
(x) Environment mitigation measures taken at Shivpur Railway siding and along the transportation till conveyor belt with silo loading is implemented.
(xi) PP shall reply to concerns raised in PH specially on River water becoming dirty after CCL started work and Cracks being developed in houses due to blasting and pollution due to coal transportation.
The proposal is deferred in above lines | 22 Feb 2021 | 3. | ADS Reply Letter | The reply to ADS of the proposal is being submitted herewith for your kind consideration. It is requested to accept the submission and consider the proposal in the ensuing EAC (Coal) meeting scheduled on 11.02.2021 | 09 Feb 2021 | 4. | NA | The EAC noted that since obtaining EC of 14.4 MTPA in March 2020, another expansion applied due available coal reserve. However, adequate pollution mitigation measures in project are still lacking in terms of transportation, planation and dust control. Therefore, the EAC after detailed deliberation was of the view that proposal requires further analysis. Also, it was observed that compliance in existing EC conditions are not adequately addressed. The dudhmatia stream which was required to diverted has not yet been diverted which is being polluting the Barki river (visible from kml file). The Committee noted that there are two cases pending in Hon’ble NGT. One is regarding non-compliance of EC conditions of EC dated 3rd January, 2006 and against EC dated 20th March, 2020 (expansion without public hearing). EAC desired, PP shall further submit the details on the following points. (i) PP shall submit compliance of EC conditions which are still non-complied with proof/photograph. (ii) The PP should come up with proposal/installation of continuous air quality monitoring stations with photographs. The photograph should bear the date, time, latitude & longitude of the monitoring station/sampling location. In addition to this PP should submit the original test reports and certificates of the labs which analyse the samples (iii) PP shall justify for considering two different emission factors source for AQIP modelling and further modelling has been conducted only for normative production capacity (iv) PP shall propose the measures to be taken for reduction of air pollution due to internal and external transportation of mine. (v) PP shall submit the specific mitigative measures for Dudhmatia Nala flow through the mining leasehold area. Detailed diversion plan along with its impact on Barki river shall be provide with allocated fund and timeline and likely Impact of mining on Chundru, Garhi river shall be submitted. (vi) PP should submit proper adequate response to public hearing issues with financial commitment and submit year wise breakup and timeline for Action Plan for addressing the issues. (vii) Fresh socio-economic study and study on flora and fauna shall be submitted since it is older than 3 years. Minutes of 7th EAC (Coal Mining Sector) held on 29th January, 2021 Page 43 of 85 (viii) The PP should submit the number of saplings to be planted, area to be covered under afforestation & green belt, location of plantation, target for survival rate and budget earmarked for the afforestation & green belt development. In addition to this PP should show on a surface plan (5-year interval for life of mine) of suitable scale the area to be covered under afforestation & green belt clearly mentioning the latitude and longitude of the area to be covered during each 5 years. The capital and recurring expenditure to be incurred needs to be submitted. Plantation plan should be prepared in such a way that 80% of the plantation to be carried out in first 5 years and for the remaining years the proposal for gap filling. The seedling of height not less than 2 meters to be selected and accordingly cost of plantation needs to be decided. In addition to this plantation in the safety zone at lease boundary the plantation should be completed within 2 years only. (ix) PP to submit R &R in respect of SCs /STs and other weaker sections of the society in the study area, a need based sample survey, family-wise, should be undertaken to assess their requirements, and action programmes prepared and submitted accordingly, integrating the sectoral programmes of line departments of the State Government. (x) Impact on nearby agricultural land and on biological Environment. Proper biological management plan needs to be prepared. (xi) Comprehensive Plan for supplying/distribution with piped water to the nearby habitation in villages/ settlements (particularly for habitation coming under zone of influence). (xii) PP should submit the quantity of surface or ground water to be used for this project. The complete water balance cycle need to be submitted. In addition to this PP should submit a detailed plan for rain water harvesting measures to be taken. (xiii) PP shall state the reason of high variation (% variation) of proposed production capacity between Normative and peak values. (xiv) Plan of OB Dumping and rehandling and management of enhance capacity to be given with proper layout (xv) Plan for coal transportation from pit head to Amrapali Railway Siding through belt conveyer to be completed in 2 years. (xvi) PP shall submit impact of blasting with adequate safeguard on nearby villages (xvii) PP shall submit additional provision i.e capital and recurring cost by proposing additional EMP measures including dust suppression as suggested by Ministry's Regional office The proposal was deferred on above lines | 08 Feb 2021 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Devendra Prasad | Designation | PO | Name of Company (Applicant Name should not be given here) | Central Coalfields Limited | Address | DARBHANGA HOUSE, CCL, RANCHI |
|