| 1. | | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | Yes | | Details of Project: | | Type of Appraised | Select | | Details of Project: | | Type of Violation | Started the work onsite without prior EC under EIA notification,2006. | | Details of Violation | 1. The Project had already been granted the Environmental Clearancefor development of hospital. After that construction work was started and has completed construction for Built-up area 32,222.507 m2 which is now an operational hospital. The construction area has exceeded the approved Built-up area granted in Environment clearance.
2. As per new planning, we are going for expansion of the project & total built-up area after expansion will be 67,444.652 m2 for which we had earlier applied for En | | Upload document of Damage Assessment Report | Annexure-Damage Assessment Report | | Upload document of Remediation Plan and Natural & Community augmentation plan | Annexure-Remediation Plan and Natural & Community augmentation plan | | Upload TOR Letter(if issued earlier) | Annexure-Uploaded TOR Letter | | Upload EC Letter(if issued earlier) | Annexure-Uploaded EC Letter | | Details of Project: | | (a)Name of the project(s) | Expansion of "Artemis Hospital" | | (b)Name of the Company / Organisation | ARTEMIS MEDICARE SERVICES LIMITED | | (c)Registered Address | Plot No. 14, Sector-20, Dwarka, New Delhi,,New Delhi,Delhi-110075 | | (d)Legal Status of the Company | Private | | (e)Joint Venture | No | |
|
| 2. | | Address for the correspondence: | | (a)Name of the Applicant | Navneet Goyal | | (b)Designation (Owner/ Partner/ CEO) | HeadLegalCompanySecretary | | (c)Address | sector-51, Gurgaon, Haryana,,Gurgaon,Gurgaon,Haryana-122001 | | (d)Pin code | 122001 | | (e)E-mail | joginder@artemishospitals.com | | (f)STD Code. | 11(f)Telephone No. | 6767999 | | (g)Fax No. | | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
| 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a.I)Project/Activity | 8(a) Building and Construction projects
| | Minor Activity | 8(a) Building and Construction projects
| | (b)Category | B1 | | Reason for Applying at Ministry | SEIAA | | (c)Proposal Number | IA/HR/MIS/84185/2007 | | (d)Master Proposal Number(Single Window) | SW/84060/2018 | | (e)EAC concerned (for category A Projects only) | INFRA-2 | | (f)Project Type | Expansion |
|
|
| 4. | | Location of the Project: | | (a)Plot/Survey/Khasra No. | Sector-51 | | (b)Pincode | 122001 | | (c)Bounded Latitudes (North) | | | From | | | Degree | 703055.89 | | Minutes | | | Second | | | From | | | Degree | 708032.33 | | Minutes | | | Second | | | (d)Bounded Longitudes (East) | | | From | | | Degree | 3146565.01 | | Minutes | | | Second | | | From | | | Degree | 3146865.30 | | Minutes | | | Second | | | (e)Survey of India Topo Sheet No. | 53H/03 | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | | (g)Maximum Elevation Above Means Sea Level(AMSL) | 234 | | (h)Uploaded (kml) File | Copy of Kml File  | | (i)Distance of Nearest HFL from the project boundary within the study area | 1.18 | | (j)Seismic Zone | 4 | |
|
| 5. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Haryana | |
|
|
| Details of State of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| NIL | |
|
| 6. | | Details of Terms of Reference (ToR)/EC: | | (a)MoEF&CC / SEIAA File Number | 23-279/2018- IA.III (V) | | (c)Date of Issue of TOR | 28 Feb 2007 | | (f)Previous TOR Letter | Copy of Previous TOR letter | | (b)Date of Apply of EC | 01 Nov 2018 | | (c)Date of Issue of EC | 27 Sep 2019 | | (d)Previous EC Letter | Copy of Previous EC letter | |
|
| 7. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | Yes | | (b)Reason | It is a Building Construction Project | | (c)Supporting Document | Copy of Supporting Document | |
|
| 8. | | Details of Project Configuration/Product: | | Details Not Applicable | |
|
| 9. | | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | | (a)Details of certified report on compliance of earlier environmental clearance condition | | (i)Certified Compliance By | Regional | | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chandigarh | | (iii)Letter No. | 4-363/2007/Vol II/RO (NZ)/329-330 | | (iv)Status of Compliance | Non Compiled | | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | | (vi)Date of site visit | Jul 9 2017 12:00AM | | (b)Details of Capacity Expansion | |
|
| S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
|---|
| (1.) | Built-up Area | 3.22225 | 3.522215 | 6.744465 | Hectares(ha) | | Others | NA | | (2.) | Plot Area | 3.35889 | 0 | 3.35889 | Hectares(ha) | | Others | NA | |
| | | (c)Details of Configuration | |
|
| S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
|---|
| (1.) | Indoor Patient Department Beds | 320 | 400 | 720 | | | (2.) | Day Care Beds | 75 | 0 | 75 | | | (3.) | Residential Service quarters | 78 | 0 | 78 | | |
| 9.1. | | Details of Consent to Operate | | (i)Whether Consent to operate obtained ? | NA | | (ii)Copies of all Consent to operate obtained since inception | NA | | (iii)Date of Issue | 06 Aug 2018 | | (iv)Valid Upto | 30 Sep 2019 | | (v)File No. | 313099718GUNOCT05485165 | | (vi)Application No. | 5485165 | | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
| 10. | | Project Cost: | | (a)Total Cost of the Project at current price level (in Crores) | 399 | | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 8.7144 | | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.0 | | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.1976 | |
|
| 11. | | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
| 12. | | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
| 13. | | Raw Material / Fuel Requirement: | | (a)Proposed quantity of raw material/fuel | 9583 | | (b)Existing quantity of raw material/fuel | 0 | | (c)Total quantity of raw material/fuel | 9583 | |
|
|   13.1. Raw Material / Fuel Profile |
|---|
| S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
|---|
| (1.) | cement | 5560 | Others | Bags | India | Road | | 300 | Open Market | | Copy of Linkage | | (2.) | Structural Steel | 1426 | Others | MT | India | Road | | 300 | Open Market | | Copy of Linkage | | (3.) | Coarse Aggregate | 12726.18 | Others | MT | India | Road | | 300 | Open Market | | Copy of Linkage | |
|
| 14. | | Baseline Data : | | (a)Period of Base Line Data Collection | FROM 03 May 2018 To 27 May 2018 | | (b)Season | Summer | |
|
| 14.1. No. of ambient Air Quality (AAQ) monitoring locations : 5 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
|---|
| (1.) | PM2.5 | | Micro Gram per Meter Cube | 83.2 | 51.3 | 80 | 60 | | (2.) | PM10 | | Micro Gram per Meter Cube | 220.5 | 126.9 | 200.6 | 100 | | (3.) | SO2 | | Micro Gram per Meter Cube | 11.7 | 5.4 | 8.6 | 80 | | (4.) | NOx | | Micro Gram per Meter Cube | 33.6 | 19.2 | 32.8 | 80 | |
| 14.2. No. of Ground Water monitoring locations : 5 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
|---|
| (1.) | pH | | | NA | | 7.8 | 7.2 | 8.5 | 8.5 | | (2.) | Chlorides | | | mg/l | | 40 | 10 | 250 | 250 | | (3.) | Fluoride | | | mg/l | | 0.69 | 0.41 | 1.0 | 1.0 | | (4.) | Heavy Metals | | Below Detection Limit | NA | | 0 | 0 | 0 | 0 | | (5.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | | (6.) | TDS | | | mg/l | | 271.5 | 42 | 500 | 500 | | (7.) | Total Hardness | | | mg/l | | 168 | 16 | 200 | 200 | |
| 14.3. No. of Surface Water monitoring locations : 1 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
|---|
| (1.) | BOD | | mg/l | | 32.8 | 32.8 | E | | (2.) | COD | | mg/l | | 80 | 80 | E | | (3.) | DO | | mg/l | | 4.5 | 4.5 | E | | (4.) | pH | | NA | | 7.9 | 7.9 | E | |
| 14.4. No. of Ambient Noise monitoring locations : 7 |
|---|
| S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
|---|
| (1.) | Leq(Night) | A-weighted decibels(dB(A)) | 64.4 | 46.3 | 40-55 | | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 73.7 | 51.9 | 55-65 | |
| 14.5. No. of Soil Sample Monitored locations : 7 |
|---|
| S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
|---|
| (1.) | pH | Others | NA | 8.5 | 6.1 | | (2.) | N(Nitrogen) | Milligram per Kilogram | | 145.2 | 68.1 | | (3.) | P(Phosphorus) | Milligram per Kilogram | | 93.8 | 28.3 | | (4.) | K(Potassium) | Milligram per Kilogram | | 146 | 25 | | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 830.77 | 124.6 | |
|
| 14.6. | | Details of Ground Water Table: | | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.3 To 79.70 | | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.05 To 77.53 | | (c)Whether Ground Water Intersection will be there ? | No | |
|
| 15. Details of Water Requirement (During Operation) |
|---|
| S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
|---|
| (1.) | Others | Municipal Supply & Borewell | 590 | 0 | Copy of Permission Letter | modeOthers | Municipal Pipeline & Borewell | Others | HUDA Supply & Existing Borewell | 15533 | 12 Oct 2017 | 590 | |
|
| 15.1. | | (a)Whether Desalination is proposed | No | |
|
| 16. Waste Water Management(During Operation) |
|---|
| S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
|---|
| (1.) | Domestic, Flushing, Cafe & Kitchen & Lab | 637 | 795 | STP (325KLD & 400KLD) & ETP(25 KLD & 45 KLD) | Reuse within the Plant & Recycling,Others | Sewer discharge | 514 | 123 | |
|
| 16.1. | | (a)Total Waste Water Generation (Kilolitre per Day) | 637 | | (b)Total Discharged Water (Kilolitre per Day) | 123 | | (c)Total Reused Water (Kilolitre per Day) | 514 | |
|
| 17. Solid Waste Generation/Management |
|---|
| S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
|---|
| (1.) | Plastic waste | Plastic Waste | | 35.04 | Tons | 50 | Road | | Authorized Recyclers | | | (2.) | Electronic waste | E Waste | | 0.024 | Tons | 50 | Road | | Authorized Recyclers | | | (3.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.924 | Kilolitre | 50 | Road | | Authorized Recyclers | | | (4.) | Bio degradable waste | Municipal Solid Waste | | 493.115 | Tons | 0 | Road | | Others | Organic waste convertor at site | | (5.) | Non Biodegradable waste | Municipal Solid Waste | | 176.3 | Tons | 50 | Road | | Authorized Recyclers | | | (6.) | Bio Medical waste | Bio-Medical Waste | | 108.77 | Tons | 50 | Road | | Authorized Recyclers | | |
|
|
| 18.1. Air Quality Impact Prediction |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
|---|
| (1.) | PM10 | | Microgram per Meter Cube | 148 | 0.60 | 3.64 | 151.64 | 100 | | (2.) | NOx | | Microgram per Meter Cube | 23.1 | 0.60 | 4.59 | 27.69 | 80 | | (3.) | PM2.5 | | Microgram per Meter Cube | 59.4 | 0.60 | 0.333 | 59.733 | 60 | | (4.) | SO2 | | Microgram per Meter Cube | 6.6 | 0.60 | 0.428 | 7.028 | 80 | |
|
| 18.2. Stack Details |
|---|
| S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
|---|
| (1.) | DG Set: 1500 kVA | Diesel | 6 | 0.60 | PM10 | | 0.05 | | (2.) | DG Set: 1500 kVA | Diesel | 6 | 0.60 | NOx | | 0.288 | | (3.) | DG Set: 1x1000 kVA | Diesel | 6 | 0.50 | NOx | | 0.228 | | (4.) | DG Set: 1x1000 kVA | Diesel | 6 | 0.50 | SO2 | | 0.12 | | (5.) | DG Set: | Diesel | 6 | 0.22 | PM10 | | 0.021 | | (6.) | DG Set: 2x750 kVA | Diesel | 6 | 0.3 | SO2 | | 0.09 | | (7.) | DG Set: 2x1250 kVA | Diesel | 6 | 0.55 | SO2 | | 0.15 | | (8.) | DG Set: 1x1000 kVA | Diesel | 6 | 0.50 | PM10 | | 0.034 | | (9.) | DG Set: 2x1250 kVA | Diesel | 6 | 0.55 | PM10 | | 0.042 | | (10.) | DG Set: 1500 kVA | Diesel | 6 | 0.60 | SO2 | | 0.18 | | (11.) | DG Set: 2x750 kVA | Diesel | 6 | 0.3 | PM10 | | 0.025 | | (12.) | DG Set: 2x1250 kVA | Diesel | 6 | 0.55 | NOx | | 0.258 | | (13.) | DG Set: 2x750 kVA | Diesel | 6 | 0.3 | NOx | | 0.175 | |
|
| 19. | | Power Requirement: | | (a)Quantity (Kilo Volt Amps (kVA)) | 4736.84 | | (b)Source | DHBVN | | (c)Uploaded Copy of Agreement | Not Applicable | | (d)Standby Arrangement (Details of DG Sets) | 1x1500 kVA, 2x1250 kVA, 1x1000 kVA, 2x750 kVA, 2x2 | | (e)Stack Height (in m) | 6 | |
|
| 20. | | Land Ownership Pattern: | | (a)Forest Land (ha.) | 0 | | (b)Private Land (ha.) | 3.35889 | | (c)Government Land (ha.) | 0 | | (d)Revenue Land (ha.) | 0 | | (e)Other Land (ha.) | 0 | | Total Land (ha.) | 3.35889 | |
|
| 21. | | Present Land Use Breakup of the Study Area in Ha: | | (a)Agriculture Area (ha.) | 0 | | (b)Waste/Barren Land (ha.) | 0 | | (c)Grazing/ Community Land (ha.) | 0 | | (d)Surface Water Bodies (ha.) | 0 | | (e)Settlements (ha.) | 0 | | (f)Industrial (ha.) | 0 | | (g)Forest (ha.) | 0 | | (h)Mangroves (ha.) | 0 | | (i)Marine Area (ha.) | 0 | | (j)Others (ha.) : Land is allotted by HUDA for development of Hospit | 3.35889 | | Total (ha.) | 3.35889 | |
|
| 22. Land requirement for various activities |
|---|
| S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
|---|
| (1.) | Built Up Area | | 3.35889 | | |
|
|
| 23. | | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
| 23.1. Details of Ecological Sensitivity : |
|---|
| S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Critically Polluted Area | NA | 0 | There is no Critically Polluted area in 10 km radius | | (2.) | ESZs | NA | 0 | There is no ESZs in 10 km radius | | (3.) | NPA | NA | 0 | There is no NPA in 10 km radius | | (4.) | Wildlife Corridors | NA | 0 | There is no Wildlife Corridor in 10 km radius | | (5.) | ESAs | NA | 0 | There is no ESA's in 10 km radius | | (6.) | WLS | NA | 0 | There is no WLS in 10 km radius | | (7.) | Corridors | NA | 0 | There is no Corridor in 10 km radius | |
| 23.2. Details of Environmental Sensitivity : |
|---|
| S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Archaeological Sites | | Shamshi Talab | 18.75 | NE direction from project site | | (2.) | Defence Installations | | NA | 0 | No Defence Installation in 10 km radius of project site | | (3.) | Forest | | Rajokari Protected Forest | 10.18 | NE direction from project site | |
|
| 23.3. | | (a)Whether Noc / Permission from the competent authority is required? | No | | (b)Whether NBWL recommendation is required? | No | |
|
| 24. | | Forest Land: | | Whether any Forest Land involved? | No | |
|
|
| 26. | | Land Acquisition Status: | | (a)Acquired Land(Ha) | 3.35889 | | (b)Land yet to be acquired(Ha) | 0 | | (c)Status of Land acquisition if not acquired | Land is already required | |
|
| 27. | | Rehabilitation and Resettlement (R&R): | | (a)No. of Villages | 0 | | (b)No. of Households | 0 | | (c)No. of PDFs (Project Displaced Families) | 0 | | (d)No. of PAFs (Project Affected Families) | 0 | | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | | (f)Status of R&R | Completed | |
|
| 28. | | Details of Presence of Schedule-I Species: | | (a)Whether there is Presence of Schedule-I Species ? | Yes | | (i)Details of Schedule-I Species | Indian Peafowl (Pavo cristatus) | | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
| 29. | | Details of Presence of Water Bodies in Core Area: | | (a)Whether there is Presence of Water Bodies in Core Area ? | No | | (b)Whether there is Diversion Required ? | No | | (c)Whether permission has been obtained from competent authority ? | No | |
|
| 30. | | Details of Presence of Water Bodies in Buffer Area: | | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | | (i)Details of Water Bodies in Buffer Area | Drain no. 08 | | (ii)Direction of Water Bodies in Buffer Area | South West | | (iii)Distance of Water Bodies in Buffer Area | 0.65 | |
|
| 31. | | Manpower Requirement: | | (a)Permanent Employment-During Construction | 0 | | (b)Permanent Employment-During Operation | 2512 | | (c)Temporary Employment- During Construction | 300 | | (d)Temporary Employment- During Operation | 0 | | (e)No. of working days | 300 | | (f)Total Manpower | 2812 | |
|
|
| S. No. | Description | Existing | Proposed | Total |
|---|
| (1.) | Total Area of Green Belt | 0.915869 | 0.107208 | 1.023077 | | (2.) | Percentage of Total Project Area | 27.26 | 3.19 | 30.450000000000003 | | (3.) | No. of Plants | 250 | 200 | 450 | | (4.) | Funds Allocated | 798000 | 800000 | 1598000 | |
|
| 33. Project Benefits |
|---|
| S. No. | Type of Project Benefits | Details of Project Benefits |
|---|
| (1.) | Social | It will generate employment opportunities for the locals. Hostel facility for workers is also provided. Medical facility is also provided to BPL and CGHS/ECHS patients also. | | (2.) | Financial | Revenue generation through taxes. Amount will be spend on CER activity | | (3.) | Environmental | 10230.77 sqm (30.45%) of the area shall de developed under Green area. Proper management of Solid waste, Hazardous waste & Bio medical waste shall de done. Project is registered for a targeted Platinum Rating as per the IGBC norms | |
|
| 34. CRZ Specific Details : Not Applicable |
| 35. Sector Specific Details For INFRA-2 |
|
| 1. | | Details of Building Construction: | | (a)Maximum Height of the Building (Meters) | 27.5 | | (b)Total No. of Flats to be Build | 0 | | (c)No. of Buildings | 5 | | (d)Total plot area (sqm) | 33588.9 | | (e)Total built up area (sqm) | 67444.652 | |
|
| 2. | | Foreshore Facilities and/or Marine Disposal: | | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
| 3. | | Rain Water Harvesting: | | (a)No. of Storage | 0 | | (b)Capacity | 0 | | (c)No. of Recharge Pits | 6 | | (d)Capacity | 399 | |
|
| 4. | | Parking: | | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 668 ECS | |
|
| 5. | | Energy Saving Measures: | | (a)Source/Mode | Solar Power plant | | (b)Percentage | 1.44 | | (c)Quantity | 65 | |
|
|
| 7. Type of Industries to be established with Industrial Estate as per their category A/B |
|---|
| S. No. | Type of Industry | No. of Units | Category A/B |
|---|
| NIL | |
| 8. | | Length of the alignment | N/A | |
|
| 9. | | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | | Details Not Applicable | |
|
|
| 36. | | Details of Court Cases: | | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
| 37. | | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | HSPCB will issue prosecution against Project Proponent | | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | | (d)Compliance status of the directions | Court case will be filed against PP under EPA Act | |
|
| 38. | | Details of EIA Consultant: | | (a)Have you hired Consultant for preparing document? | Yes | | (i)Accreditation No. | 116 | | (ii)Name of the EIA Consultant | Perfact Enviro Solutions | | (iii)Address | 5th Floor, NN Mall, Sector-3, Rohini | | (iv)Mobile No. | 9818362330 | | (v)Landline No. | 0114928136 | | (vi)Email Id | info@perfactgroup.com | | (vii)Category of Accreditation | A | | (viii)Sector of Accreditation | INFRA-2 | | (ix)Validity of Accreditation | 27 Nov 2018 | | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
| Essential Detail Sought : NIL |
| Additional Detail Sought: |
|---|
| Sno. | ADS Letter | Remarks | Date of ADS |
|---|
| 1. | ADS Reply Letter | NA | 15 Apr 2019 | | 2. | NA | Observations and recommendations of committee: The EAC after deliberation deferred the proposal for want of following information:
(i)Table indicating progressive construction right from beginning before issue of Environmental Clearance dated 19.07.2007 and the consumption of various construction materials including water and energy.
(ii)Green belt as per MoEF&CC guidelines to be compensated in the green area.
(iii)Latest certified compliance report from the Regional Office of the Ministry for the existing EC.
(iv)A table indicating the Air, Water and Soil sampling stations with distances and directions as per the wind direction.
(v)Detailed action plan for maintaining indoor air quality.
(vi)Noise levels were exceeding the prescribed standard during the night time. A detailed action | 10 Dec 2018 | |
| | Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| | | Name of Applicant | Navneet Goyal | | Designation | HeadLegalCompanySecretary | | Name of Company (Applicant Name should not be given here) | ARTEMIS MEDICARE SERVICES LIMITED | | Address | Plot No. 14, Sector-20, Dwarka, New Delhi |
|