1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Establishment of Synthetic Organic Chemicals, Intermediates and Specialty Chemicals by Reshmika Minerals and Chemicals Private Limited Plot No 23 GIDC Industrial Estate Panoli | (b)Name of the Company / Organisation | RESHMIKA MINERALS & CHEMICALS PRIVATE LIMITED | (c)Registered Address | Plot No. 23, Panoli GIDC, Dist. Bharuch, Gujarat,,Bharuch,Gujarat-394116 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sunil Vanarse Vanarse | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Plot No.23, Panoli GIDC, Dist. Bharuch, Gujarat,,Anklesvar,Bharuch,Gujarat-394116 | (d)Pin code | 394116 | (e)E-mail | puranikravi@gmail.com | (f)STD Code. | 20(f)Telephone No. | 66260000 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Minor Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/79285/2017 | (d)Master Proposal Number(Single Window) | SW/79283/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No 23 GIDC Industrial Estate Panoli Ankleshwa | (b)Pincode | 394116 | (c)Bounded Latitudes (North) | | From | | Degree | 21.32 | Minutes | | Second | | From | | Degree | 21.32 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.59 | Minutes | | Second | | From | | Degree | 73.00 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43M14 F43M15 F43N2 F43N3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 34 | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | 6.6 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Mahesana | Kadi | Dangarwa | (2.) | Gujarat | Bharuch | Anklesvar | Panoli | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/535/2017-IA-II(I) | (b)Date of Apply of TOR | 04 Nov 2017 | (c)Date of Issue of TOR / Standard ToR | 22 Mar 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | As per EIA notification 2006 proposed project is w | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Reactor Columns Storage Tanks Boilers | Will be installed | No | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Propiophenone | 50 | Others | Ton per month (TPM) | Road | | (2.) | 4-Nitro-o-Xylene | 500 | Others | Ton per month (TPM) | Road | | (3.) | 3-Nitro-o-Xylene | 600 | Others | Ton per month (TPM) | Road | | (4.) | 1,3-Dimethyl-2-Nitrobenzene | 20 | Others | Ton per month (TPM) | Road | | (5.) | 2,4-Dimethyl-1-Nitrobenzene | 80 | Others | Ton per month (TPM) | Road | | (6.) | 2,6-Xylidine (2,6 –Dimethyl Aniline) | 10 | Others | Ton per month (TPM) | Road | | (7.) | 2,4-Xylidine (2,4 – Dimethyl Aniline) | 40 | Others | Ton per month (TPM) | Road | | (8.) | 1-Octanoic acid | 300 | Others | Ton per month (TPM) | Road | | (9.) | Di-Ethyl Ketone (DEK) | 250 | Others | Ton per month (TPM) | Road | | (10.) | N-(1-Ethylpropyl)-3,4-Xylidine | 500 | Others | Ton per month (TPM) | Road | | (11.) | Phenyl ethyl alcohol | 200 | Others | Ton per month (TPM) | Road | | (12.) | Phenyl acetaldehyde | 20 | Others | Ton per month (TPM) | Road | | (13.) | Phenyl ethyl acetate | 20 | Others | Ton per month (TPM) | Road | | (14.) | Methyl Ethyl Ketone | 5 | Others | Ton per month (TPM) | Road | | (15.) | Dilute Sulfuric acid | 230 | Others | Ton per month (TPM) | Road | | (16.) | 3,4-Xylidine (3,4 –Dimethyl Aniline) | 100 | Others | Ton per month (TPM) | Road | | (17.) | Dilute nitric acid | 800 | Others | Ton per month (TPM) | Road | | (18.) | 2-Cynophenol | 100 | Others | Ton per month (TPM) | Road | | (19.) | Phenyl acetaldehyde di-methylacetal | 20 | Others | Ton per month (TPM) | Road | | (20.) | Styrene oxide | 200 | Others | Ton per month (TPM) | Road | | (21.) | Phenyl ethyl alcohol methyl ether | 50 | Others | Ton per month (TPM) | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 28 Jan 2016 | (iv)Valid Upto | 05 Oct 2020 | (v)File No. | GPCB/ANK/CCA-1305/ID-33963/342932 | (vi)Application No. | 99715 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 130 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 7.75 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.975 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.35 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Raw material | 0 | Others | Ton per month (TPM) | Imported, Local | Road | | 0 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 95.3 | 80.5 | 95 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 22.3 | 10 | 22.1 | 80 | (3.) | Others | CO | Mili Gram per Meter Cube | 1.39 | 0.9 | 1.4 | 4 | (4.) | NOx | | Micro Gram per Meter Cube | 28.6 | 16 | 28.2 | 80 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 43.1 | 28.4 | 42.8 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.92 | 7.92 | 8.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 162 | 162 | 200 | 600 | (3.) | Chlorides | | | mg/l | | 280 | 280 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (5.) | Others | Sulphide | | mg/l | | 0 | 0 | 0.05 | 0.05 | (6.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (7.) | TDS | | | mg/l | | 380 | 380 | 500 | 2000 | (8.) | Heavy Metals | | Lead | mg/l | | 0 | 0 | 0.01 | 0.01 | |
14.3. No. of Surface Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.31 | 8.31 | E | (2.) | BOD | | mg/l | | 20 | 20 | E | (3.) | COD | | mg/l | | 0 | 0 | E | (4.) | DO | | mg/l | | 6.1 | 6.1 | E | (5.) | Others | TDS | mg/l | | 150 | 150 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 68.6 | 68.6 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 73.1 | 73.1 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 7.78 | 7.78 | (2.) | N(Nitrogen) | Percent | | 3.36 | 3.36 | (3.) | P(Phosphorus) | Kilogram per hectare | | 26.16 | 26.16 | (4.) | K(Potassium) | Kilogram per hectare | | 310 | 310 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 308.2 | 308.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | from GIDC | 913.5 | 0 | Copy of Permission Letter | Pipeline | | Others | from GIDC pipeline | 0 | 18 Sep 2018 | 913.5 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic & Industrial | 165 | 165 | ETP RO MEE | Reuse within the Plant & Recycling | | 165 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 165 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 165 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Waste paper, corrugated boxes | Municipal Solid Waste | | 1 | Tons | 0 | Road | | Others | Sale to scrap dealer or recycler | (2.) | Metal scrap | Municipal Solid Waste | | 3 | Tons | 0 | Road | | Others | Sale to scrap dealer or recycler | (3.) | Used Catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 15 | Tons | 0 | Road | | Others | solid waste facility or use for brick | (4.) | Used or Spent Catalyst (Transition metal) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5 | Tons | 0 | Road | | Others | authorized supplier for reactivation | (5.) | Chemical sludge from ETP | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 100 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | Used Empty Barrels or Liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1000 | Tons | 0 | Road | | Authorized Recyclers | | (7.) | Plastic waste | Municipal Solid Waste | | 2 | Tons | 0 | Road | | Others | Sale to scrap dealer or recycler | (8.) | Wooden waste | Municipal Solid Waste | | 2 | Tons | 0 | Road | | Others | Sale to scrap dealer or recycler | (9.) | Discarded container bags or Liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 16.03 | Tons | 0 | Road | | Others | decontamination and reuse | (10.) | Process waste or Distillation column residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1140 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (11.) | Used or spent Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2 | Tons | 0 | Road | | Others | sale to registered refiners | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 15.8 | 1.2 | 0 | 15.8 | 80 | (2.) | NOx | | Microgram per Meter Cube | 21.7 | 1.2 | 0.2 | 21.9 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | (4.) | PM10 | | Microgram per Meter Cube | 87.1 | 1.2 | 0.3 | 87.4 | 100 | (5.) | Others(Specify) | NA | NA | 0 | 0 | 0 | 0 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 3 Hot oil generator | Natural gas 1384 | 30 | 1 | PM10 | | 0.3 | (2.) | 2 High temp hot oil generator | Natural gas 388 | 30 | 0.5 | PM10 | | 0.3 | (3.) | 3 Boilers | Natural gas 676 | 30 | 0.8 | PM10 | | 0.3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1275 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1 no 315 KVA DG 3 no of 500 KVA DG | (e)Stack Height (in m) | 6 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 8.963272 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 8.963272 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 8.963272 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 8.963272 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 8.963272 | Total plot area | (2.) | Green belt | | 2.942043 | Within plot & adjacent lease area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Not applicable | 0 | Not applicable | (2.) | ESZs | Not applicable | 0 | Not applicable | (3.) | Wildlife Corridors | Not applicable | 0 | Not applicable | (4.) | Corridors | Not applicable | 0 | Not applicable | (5.) | Critically Polluted Area | Not applicable | 0 | Not applicable | (6.) | ESAs | Not applicable | 0 | Not applicable | (7.) | NPA | Not applicable | 0 | Not applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Not applicable | 0 | Not applicable | (2.) | Defence Installations | | Not applicable | 0 | Not applicable | (3.) | Others | Not applicable | Not applicable | 0 | Not applicable | (4.) | Archaeological Sites | | Not applicable | 0 | Not applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Kharod lake | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 58 | (c)Temporary Employment- During Construction | 30 | (d)Temporary Employment- During Operation | 70 | (e)No. of working days | 6 | (f)Total Manpower | 158 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 3.04184 | (b)Percentage of Total Project Area | 33.94 | (c)No. of Plants to be Planted | 400 | (d)Funds Allocated for Plantation | 30 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Local employment, Social upliftment in nearby area through CER | (2.) | Financial | Project will help possibilities of export | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Sr no 5 of NABET accredited consultant list | (ii)Name of the EIA Consultant | Adity Environmental services Pvt Ltd | (iii)Address | 107 Hiren Light Industrial estate Mahim Mumbai | (iv)Mobile No. | 9821513367 | (v)Landline No. | 0224212750 | (vi)Email Id | rajiv@aespl.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 18 Sep 2018 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The project/activity is covered under category B of item 5(f) of the schedule to the EIA Notification, 2006 and requires appraisal/approval at the State level by the concerned SEAC/SEIAA. Please submit your proposal accordingly. | 23 Sep 2018 | 2. | NA | The correction have been made as per the instruction received | 12 Nov 2018 | 3. | NA | In continuation to our earlier observations,please clarify whether the proposed products identified under category A of item 5(b) are technical grade pesticides. Also, different products (total quantum-3060 TPM) need to be mentioned separately under item 5(b) & 5(f) for actual categorization of the project in terms of the provisions of the EIA Notification, 2006. | 20 Nov 2018 | 4. | NA | The correction have been made as per the instruction received | 28 Nov 2018 | 5. | NA | Category A of item 5(b) of the schedule to the EIA Notification, 2006 covers the units producing technical grade pesticides. In view of the clarifications provided, how the project is justified under category A. | 07 Dec 2018 | 6. | NA | The correction have been made as per the instruction received | 14 Dec 2018 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sunil Vanarse Vanarse | Designation | Director | Name of Company (Applicant Name should not be given here) | RESHMIKA MINERALS & CHEMICALS PRIVATE LIMITED | Address | Plot No. 23, Panoli GIDC, Dist. Bharuch, Gujarat |
|