Form-4
APPLICATION FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE
(To be filled up by User Agency)
1.
Details of Project
Proposal No. :
IA/UP/THE/107454/2019
(a) Name of the project :
2x660 MW Meja Thermal Power Project
(b) Name of Company / Organisation. :
MEJA URJA NIGAM PRIVATE LIMITED
(c) Registered Address. :
MUNPL, 5th Floor, Sangam Place, Civil Lines,
(d) Legal Status of the Company. :
Others
(e) Joint Venture (Yes/No) :
Yes
2.
Address for the Correspondence
(a) Name of Applicant. :
Ramesh
(b) Designation (Owner/Partner/CEO) :
GM
(c) Address :-
MUNPL, 5th Floor, Sangam Place, Civil Lines,
State :
Uttar Pradesh
District :
PRAYAGRAJ
Town / Village :
No
(d) Pin Code :
212301
(e) Email :
env.meja@gmail.com
(f) Telephone no :
2693150
(g) Fax no :
No
(h) Mobile no :
9650992865
(i) Contact Person. :
Ramesh
(j) Website (if any) :
No
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006
(a). Major Activity. :
1(d) Thermal Power Plants
Minor Activity :
No
Major Sub Activity. :
No
Minor Sub Activity :
No
(b). Category :
A
Reason for applicant at central level/state level(in case of B1 and B2 projects):
No
4.
Location of Project
(a) Plot No/Survey No/Khasra No :
Kohadar
(b) Village :
Kohadar, Mai Khurd
(c) Tehsil :
Meja
(d) District :
PRAYAGRAJ
(e) State :
Uttar Pradesh
(f) Pin Code :
212301
(g) Bounded Latitudes (North) :
Yes
From :
Degree:25, Minutes : 07, Second :00
To :
Degree:25, Minutes : 10, Second :00
(h) Bounded Longitudes (East) :
Yes
From :
Degree:81, Minutes : 54, Second :00
To :
Degree:81, Minutes : 58, Second :00
(i) Survey of India Topo Sheet No :
63G15,16 and 63K 3,4
5
Details of Environment Clearance
(a) Project Name :
2x660 MW Meja Thermal Power Project
(b) MoEF&CC / SEIAA File No :
J-13012/03/2008-IA.II (T)
(c) Date of issue of EC :
01/10/2011
(d) Uploaded EC letter (PDF Only):
6
Details of Consent to Operate
(i) Whether Consent to operate obtained (Yes/No) ? :
Yes
(ii) Uploaded copies of all Consent to operate obtained since inception:
(iii)Date of issue :
07/03/2019
(iv)Valid Upto:
31/12/2019
(v)File No :
38519/UPPCB/ALLAHABAD(UPPCBRO) CTO/WATER/ALLAHABAD/2019. 38499/UPPCB/ALLAHABAD9UPPCBRO)CTO/AIR/ALLAH
(vi)Application No :
3577342(WATER), 3576230 (AIR)
(vii)Uploaded copy of Consent to operate valid as on Date:
7
Amendment Sought for
Amendment in Configuration/ Amendments in Clearance condition/ Other (specify) :
Amendment is sought for EC condition number vii and xxii . Details are in Application.
8
Details of Product (as per the approved EC)
Details of Products
S.no
Product / Activity (Capacity/ Area).
Quantity
Unit
Mode of Transport/ Transmission of Product
1
1320 MW Electricity generation
1320
2
THROUGH POWER TRANSMISSION LINE of PGCIL
9
Details of Configuration (Multiple Entries Allowed)
Details of Configurations
S.no
Plant/ Equipment/ Facility
Existing Configuration
Proposed Configuration
Final configuration after Amendment
Remarks if Any
1
Two units of 660 MW each
2x660 MW
2x660 MW
1320 MW
Nil
10
Reason for Amendment
Reason for Amendment :
Reason for EC amendment is detailed in the Application letter dated 06.06.2019 along with its Annexes.
11
Any Other Amendment required
Any Other Amendment Required
S.no
Reference of Approved EC
Description as per Approved EC
Description as per Proposal.
Remarks
1
Specific condition no. (vii) of EC dated 10.01.2011 for Meja TPP 2x660MW
“Bi-flue stack of 275 m height with flue gas veloc
The para “continuous online monitoring of PM2.5 &
The proposal for amendment in condition number vii
2
Specific condition no. (xxii) of EC dated 10.01.2011 for Meja TPP 2x660MW
Further, an amount of Rs 37.10 Crores shall be ear
i. Provision for one time expenditure on CSR activ
The proposal for amendment in condition number xxi
12
Details of EIA Consultant
Have you hired Consultant for preparing document (Yes/No) ? :
No
(i)Reason for not engaging the Consultant :
Present Proposal is for amendment in EC
13.
Document to be Attached
(a) Uploaded addendum to EIA/EMP Report :
No Data
(b) Uploaded Copy of revised -Feasibility Report /Detailed Project Report (DPR) / Detailed Engineering Report / Detailed Conceptual Plan / Approved Mining Plan (in case of mining proposals) :
No Data
(c) Upload Copy of final Layout Plan :
No Data
(d)Uploaded Cover Letter duly signed by the project proponent or authorized person:
(e)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency:
(f)Uploaded Additional File, If any :
No Data
(g)Uploaded Proposal Presentation :
No Data
Essential Details Sought
Details of State of the project
S.no.
EDS Sought Date
EDS Sought
Letter
NIL
Additional Detail Sought:
NIL
14.
Undertaking
(a):
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up.
(b)Name :
Ramesh Kher
(c)Designation:
GM
(d)Company:
MEJA URJA NIGAM PRIVATE LIMITED
(e)Address:
MUNPL, 5th Floor, Sangam Place, Civil Lines,