APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | K.Senthil, Rough Stone and
Gravel Quarry from over an Extent of 0.65.5Ha in S.F.No: 35/1A2(P) at Kuppam Village of
Aravakurichi Taluk, Karur District |
| (ii). | Location / site (GPS Co-ordinate) | 11°00'29.10"N to 11°00'32.73"N
77°57'57.45"E to 77°58'00.43"EAnnexure-GPS file  |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 0.65.5 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 20860 | | (v). | Period of Mining Lease | 5 | | (vi). | Expected cost of the Project | 21.60 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | * | Name of Consultant/RQP | Thangaraju P | Address | Fairlands, Salem | Mobile No. | 9443356539 | Landline No. | 2431989 | Email Id | pproponent@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 0 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 1 km | | (iii). Nearest Railway Line along with distance in kms | 5.5 km | | (iv). Nearest National Highway along with distance in kms | 5.5 km | | (v). Nearest State Highway along with distance in kms | 1.0 km | | (vi). Nearest Major District Road along with distance in kms | 0.540 km | | (vii). Nearest Any Other Road along with distance in kms | 0 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 0 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 6.5 km | | (x). Nearest In-take for drinking water pump house distance in kms | 1 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 0 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | There are no such protected areas like ecological
landscape, cultural area etc. identified within the 10
Km radius. | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | There is no Reserve forest Eco sensitive area, wild
life sanctuaries, National Parks, CRZ and HACA
within the radius of 10km.
Cauvery & Noyyal river are passing about 6.5km
from the North western side of the lease applied
area.
Amaravathi river is passing about 9.0km from the
South eastern side of the lease applied area.
50m safety distance maintained by Southern side of
Noyyal Vaikkal and Eastern side of Odai from the
lease applied area. | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | ------- | 6. | Inland, coastal, marine or underground waters | There is no Inland, coastal, and marine or
underground water around the site. | 7. | State, National boundaries | There is no State, National boundaries within the
radius of 10km. | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | There is no tourist, pilgrim areas within 10 Km
radius. | 9. | Defence installations | No defense installation found within 10Kms from
the project area. | 10. | Densely populated or built-up area, distance from nearest human habitation | 1. Punnam chatram 1.5km – Northeast 850
2. Pullaiyampalayam 1.0km – Southeast 700
3. Andisangilipalayam 3.5km – Southwest 750
4. Uppupalayam 1.0km – Northwest 500 | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Karur is having all the facilities which are at a
distance of 14kms on the South eastern side of the
area. | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | The quarry operation is restricted up to depth only
22m from below ground level for a period of Five
years. Hence the ground water will not be affected
beside the area is devoid of agriculture, Forestry,
Tourist place etc., | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | This is the fresh quarry project, hence the area has
not subjected to pollution or environmental damage.
The atmosphere is quite fresh and it is proposed to
carry out the quarrying operations an Eco friendly
manner. | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | The areas are not susceptible to natural hazards like
landslides, earthquake, it is a high stable land. There
are no evidences recorded in the past history. | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/TN/MIN/18919/2018 | File Number | DIA/TN/MIN/18919/2018 | Date of Apply EC | 14 Nov 2018 |
| |
|