APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | Mining appln of Mr. Dharamprakash Bhawanishankar Parashar,Gut No.99,Mohada stone quarry proposal |
| | (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 2.02 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 193447 | | (v). | Period of Mining Lease | 5 | | (vi). | Expected cost of the Project | 30 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | 1518/SA036 | Name of Consultant/RQP | Prashil Shukla | Address | Enviro Techno Consult Pvt Ltd., Nagpur | Mobile No. | 9225230146 | Landline No. | 32027888 | Email Id | envirotechnoconsult@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 6 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 20 km | | (iii). Nearest Railway Line along with distance in kms | 5.534 km | | (iv). Nearest National Highway along with distance in kms | 41 km | | (v). Nearest State Highway along with distance in kms | 0.300 km | | (vi). Nearest Major District Road along with distance in kms | 3.723 km | | (vii). Nearest Any Other Road along with distance in kms | 1.059 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 15 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 6.151 km | | (x). Nearest In-take for drinking water pump house distance in kms | 6.151 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 6.151 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Tipeshwar Tiger reserve-38 km W, Tadoba-andheri Tiger reserve-38 km E study area | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Water Body Vidarbha Nallaha -5.5 km SW,Wardha River- 7.5 km S , Wet Land Not Notified for district ,Coastal Area 617 Km E,
Biosphere Pachmadi -278 Km N,
Mountains Mudkhed Hill 23 Km
S, Rf 1.4 Km S | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Tipeshwar Tiger reserve-38 km W, Tadoba-andheri Tiger reserve-38 km E study area | 6. | Inland, coastal, marine or underground waters | Water Body Vidarbha Nallaha -5.5 km SW,Wardha River- 7.5 km S,Coastal Area 617 Km E,
,Marine Water -610 Km E | 7. | State, National boundaries | 17.6 Km SW | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | Shirpur Rd-3.766 km E | 9. | Defence installations | Bhadrawati Ordnance Factory-32.5 Km NE | 10. | Densely populated or built-up area, distance from nearest human habitation | Mohada 1.033 Km N | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Wani-20 km N | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Water Body Vidarbha Nallaha -5.5 km SW,Wardha River- 7.5 km S, Coastal Area 617 Km E,
,Marine Water -610 Km E,,quarry is
agriculture area with single crop
system, Fishing at Water Body 5.5 Km SW, Minerals quarry belongs to Basalt | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | No. Stone quarry is at safe distances from natural hazards like earthquake prone area, subsidence, landslide, erosion, flooding prone area | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | New | Proposal Number | DIA/MH/MIN/18452/2018 | File Number | DIA/MH/MIN/18452/2018 | Date of Apply EC | 26 Oct 2018 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Maharashtra | Yavatmal | Wani | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | PROJECT PROPONENT | Designation | PROJECT PROPONENT | Company | PROJECT PROPONENT | Address | 68, mahakali nagar nagpur |
| |
|