APPENDIX I
(See Paragraph-6)
FORM 1M
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
(i).Name of the Mining Lease site balej bl stone of raja jesha ulva
(ii).Location / site (GPS Co-ordinate) 21 22'00.29"N 69 52'17.64"E 21 21'59.40"N 69 52'22.92"E 21 21'59.82"N 69 52'21.29"E 21 21'58.34"N 69 52'23.24"E 21 21'57.04"N 69 52'19.98"E 21 21'57.55"N 69 52'18.92"E
Annexure-GPS file      
(iii).
Type of LeaseIndivisual Area
Size of the Mining Lease (in ha.)0.71 ha.
(iv).Capacity of the Mining Lease (TPA) 12000
(v).Period of Mining Lease 5
(vi).Expected cost of the Project 10
(vii).
Have you hired Consultant/Registered Qualified Person(RQP) for preparing document?Yes
Accreditation No.RQP/AJM/349/2014/A 
Name of Consultant/RQPMr. Ramesh Chandra Sharma
Address Saimaa Geominhydrotech gali no 8 opp baba ramdev mandir soorsagar jodhpur
Mobile No.9829220600
Landline No.2302050
Email Idrcsharma47813@gmail.com
(II) Environmental Sensitivity
S.No Areas Distance in kilometer / Details
1. (i).  Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms.  0.730 km
2. (ii). Nearest Infrastructural along with distance in kms  1.55 km
(iii). Nearest Railway Line along with distance in kms  40 km
(iv). Nearest National Highway along with distance in kms  0.730 km
(v). Nearest State Highway along with distance in kms  0.730 km
(vi). Nearest Major District Road along with distance in kms 1.55 km
(vii). Nearest Any Other Road along with distance in kms  0.20 km
(viii). Nearest Electric transmission line pole or tower distance in kms  0.300 km
(ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms  0.6 km
(x). Nearest In-take for drinking water pump house distance in kms  1.60 km
(xi). Nearest In-take for Irrigation canal pumps distance in kms  1.60 km
3. Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
NO
4. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests NO
5. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration NO
6. Inland, coastal, marine or underground waters NO
7. State, National boundaries NO
8. Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas NO
9. Defence installations NO
10. Densely populated or built-up area, distance from nearest human habitation AT VILLAGE BALEJ 1.55 KM
11. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) NO
12. Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) NO ONLY LIMESTONE MINOR MINERAL AVAILABLE
13. Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) CUTTER MACHINE USE FOR MINING OPERATION REMOVE THE SOIL COVER AND CUTTING OF CUBE AS A BL STONE
14. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) NO HAZARDOUS WASTE GENERATE IN MINING OPERATION
15.
Is proposed mining site located over or near fissure/fracture for ground water recharge?No
16.
Whether the proposal involves approval or clearance under the following Regulations or Acts namely?
(a).
The Forest (Conservation) Act,1980?No
(b).
The Wildlife (Protection) Act,1972?No
(c).
The Coastal Regulation Zone (C.R.Z) notification,2011?No
17.
Is forest land involved (ha)?No
18.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
19.
New/Expansion/ModernizationNew
Proposal NumberDIA/GJ/MIN/19999/2019
File NumberTo be assigned
Date of Apply EC15 Oct 2019
Details of State of the project
S.No. State Name District Name Tehsil Name
(1.)GujaratPorbandarPorbandar
(III) EC Attachments
1 Uploaded PFR (Pre Feasibility Report) File Annexure-PFR file
2 Uploaded Approved Mining Plan File Annexure-Approved Mining Plan file
3 Uploaded District survey report Annexure-District Survey Report
4 Uploaded Cover Letter Annexure-Cover Letter
Uploaded Additional attachments, if any
S.No. Attached File Date of Submission
NIL
(IV) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge.
(IV).(i)
NameMAHRSHI CONSULTANT
DesignationRQP
Company MAHRSHI CONSULTANT
Address1st floor opp shivam complex nr MEM school birla road porbandar
Print