APPENDIX I | (See Paragraph-6) | FORM 1M | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form 1M. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | (i). | Name of the Mining Lease site | M/s.SRI SAKTHI GRANITES |
| (ii). | Location / site (GPS Co-ordinate) | The quarry lease applied area falls in the Survey of India, Toposheet No. 65 K / 9 (Scale 1 : 50,000) and is bounded
MAP DATUM : WGS – 84
B.P No. LATITUDE LONGITUDE
1 17°46'24.96"N 82°43'18.74"EAnnexure-GPS file  |
| (iii). | |
Type of Lease | Indivisual Area | Size of the Mining Lease (in ha.) | 2.8 ha. | | | (iv). | Capacity of the Mining Lease (TPA) | 17977.32 | | (v). | Period of Mining Lease | 20 | | (vi). | Expected cost of the Project | 20 | | (vii). | Have you hired Consultant/Registered Qualified Person(RQP) for preparing document? | Yes | Accreditation No. | RQP/DMG/AP/43/2017 | Name of Consultant/RQP | SRI KALAGARLA SANTHOSH KUMAR | Address | R/o.51B, B.P.Colony, Opp.Sri Ram Medical Shop, Near Railway Gate, Garividi (Mandal), Vizianagaram (Dt), A.P | Mobile No. | 9703955183 | Landline No. | 08952234 | Email Id | ksantoshkumar87@gmail.com | | | (II) | Environmental Sensitivity | S.No | Areas | Distance in kilometer / Details | | | 1. | (i). Nearest rail or road bridge over the concerned river,rivulet,nallah etc. in kms. | 25.0 km |
| 2. | (ii). Nearest Infrastructural along with distance in kms | 1 km | | (iii). Nearest Railway Line along with distance in kms | 25.0 km | | (iv). Nearest National Highway along with distance in kms | 24.0 km | | (v). Nearest State Highway along with distance in kms | 1.5 km | | (vi). Nearest Major District Road along with distance in kms | -- km | | (vii). Nearest Any Other Road along with distance in kms | 1.5 km | | (viii). Nearest Electric transmission line pole or tower distance in kms | 1 km | | (ix). Nearest Canal or check dam or reservoirs or lake or ponds distance in kms | 6.5 km | | (x). Nearest In-take for drinking water pump house distance in kms | 1 km | | (xi). Nearest In-take for Irrigation canal pumps distance in kms | 0 km |
| 3. | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Nil | 4. | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Kalyanapu Lova reservoir at 6.5 kms in SW side
Lambasingi forest at 10kms radius from mine lease area in west side. | 5. | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Nil | 6. | Inland, coastal, marine or underground waters | Nil | 7. | State, National boundaries | None within 10 km radius | 8. | Routes or facilities used by the public for access to recreation or other tourist,pilgrim areas | State Transport Bus Services ply from Chodavaram, Anakapalli & Visakhapatnam. | 9. | Defence installations | None | 10. | Densely populated or built-up area, distance from nearest human habitation | Z.Bennavaram at 1.0 kms – East Side | 11. | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,community facilities) | Hospitals, Schools, Temples are available at Ravikamatham village. | 12. | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | The ground water level is about 15-45 M BGL at the foot hill. | 13. | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | All environmental standards will be monitored and maintained according to the standards. | 14. | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) | Nil | 15. | Is proposed mining site located over or near fissure/fracture for ground water recharge? | No |
| 16. | Whether the proposal involves approval or clearance under the following Regulations or Acts namely? | | (a). | The Forest (Conservation) Act,1980? | No | | | (b). | The Wildlife (Protection) Act,1972? | No | | | (c). | The Coastal Regulation Zone (C.R.Z) notification,2011? | No |
| | | | 17. | Is forest land involved (ha)? | No | |
| 18. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |
|
| 19. | New/Expansion/Modernization | Expansion | New Proposal Number | DIA/AP/MIN/19447/2018 | New File Number | To be assigned | Date of Apply EC | 06 Dec 2018 | Proposal Number | DIA/AP/MIN/19445/2013 | File Number(Previous EC) | SEIAA/AP/VSP-122/2013 | Date of Previous EC | 25 Oct 2013 |
| |
| Details of State of the project |
---|
S.No. | State Name | District Name | Tehsil Name |
---|
(1.) | Andhra Pradesh | Visakhapatnam | Ravikamatham | | (IV) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge. | (IV).(i) | Name | SRI SAKTHI GRANITES | Designation | Managingpartner | Company | SRI SAKTHI GRANITES | Address | Sy.No.150, Z.Bennavaram VIllage, Ravikamatham Mandal, VIsakhapatnam District |
| |
|