BY
SPEED POST
F. No. J-13011/23/1996-IA.II (T)
Government of India
Ministry of Environment & Forests
Paryavaran Bhawan
CGO Complex, Lodi Road
New Delhi-110 003
Dated: 9th Sept, 2009
To
M/s Udupi Power Corporation Limited
Prestige Opal, Unit 202, 2nd floor,
#146, Infantry Road,
Bangalore-560001.
Sub : Enhancement of project capacity from 2x507.50 MW to 2x600 MW coal
based thermal power plant at Padubidri Near Mangalore, Karnataka by M/s Udupi
Power Corporation Limited-
Environmental clearance regarding.
Sir,
Reference is invited to
your letter No. UPCL/B04/2009/1193 dated 16.1.2009 requesting for enhancement
of project capacity from 2x507.50 MW to 2x600 MW in respect of the above
mentioned project. Subsequent
information furnished vide letter no. UPCL/MOEF/2009 dated 11.2.2009, letter
no. UPCL/CRZ/2009 dated 19.2.2009 and letter no. UPCL/B04/2009/234 dated 23.2.2009
have also been considered.
2. It is noted that the
environmental clearance for setting up of
1015 MW was accorded vide this Ministry’s letter of even number dated 20th
March, 1997. M/s Udupi Power Corporation
Limited has now proposed to enhance the project capacity from 2x507.50 MW to
2x600 MW. It is further noted that:-
(i) No
additional land is required due to change in capacity.
(ii) Coal
requirement will increase from 415 MT/hr to 488 MT/Hr.
(iii) Ash
content in imported coal will decrease from 13.91% to 4.75% and sulphur content
will increase from 0.53% to 0.80%.
(iv) Predicted
GLC for SO2 will decrease
from 10.10 ug/m3 to 8.14 ug/m3 due to increase in stack dia and increase in effective stack height.
(v) Make
up water requirement will increase from 8000 m3/hr to 10000 m3/hr.
-2-
3. Keeping
in view the above, the Ministry of Environment and Forests has no objection for
enhancement of the project capacity from 2x507.50 MW to 2x600 MW subject to
strict implementation of all the
conditions contained in the Environmental Clearance letter of even number dated
20.3.1997 with following additional terms and conditions:-
(i)
Prior
CRZ clearance for the activities/ facilities to be located in the CRZ area
shall be obtained from the Competent Authority before commissioning of the
project.
(ii)
A bi-flue
stacks of 275 m height each shall be provided with continuous online
monitoring equipments for Sox, NOx, Particulate matter and Hg. Exit velocity of
flue gases shall not be less than 23.19
m/sec.
(iii)
High efficiency
Electrostatic Precipitator (ESP) shall be
installed to ensure that particulate
emission does not exceed 50 mg/Nm3.
(iv)
Wet limestone type FGD unit with 85% efficiency of
removal of SO2 shall be installed.
(v)
An amount of Rs. 5 crore as capital budget and Rs.
1 crore as recurring expenditure/annum shall be earmarked for the activities to
be taken up under CSR.
(vi)
100% fly ash and gypsum utilization shall be
ensured from 4th year onwards.
(vii)
A detailed action plan for R&R of 59 families
to be displaced due to the project shall be prepared along with financial
allocation and status of rehabilitation colony proposed for them shall be
submitted within 30 days from issue of environmental clearance letter.
(viii)
Regular monitoring of ground water in and around
the ash pond area including heavy metals(hg, Cr, As, Pb) shall be carried out,
records maintained and six monthly reports shall be furnished to the Regional
Office of this Ministry. The data so
obtained should be compared with the baseline data so as to ensure that the
ground water quality is not adversely affected due to the project.
-3-
(ix)
Regular monitoring of ground level concentration of SO2, NOx Hg, SPM and RSPM shall be carried out in the
impact zone and records maintained. If
at any stage these levels are found to exceed the prescribed limits, necessary
control measures shall be provided immediately.
The location of the monitoring stations and frequency of monitoring
shall be decided in consultation with SPCB.
Periodic reports shall be submitted to the Regional Office of this Ministry.
The
data so monitored shall be put on the website of the company.
(ix)
A copy of the clearance
letter shall be sent by the proponent to concerned Panchayat, Zila Parisad
/Municipal Corporation, urban local Body and the Local NGO, is any, from whom
suggestions/representations, if any, were received while processing the
proposal. The clearance letter shall also be put on the website of the Company
by the proponent.
(x)
The
proponent shall upload the status of compliance of the stipulated EC
conditions, including results of monitored data on their website and shall
update the same periodically. It shall
simultaneously be sent to the Regional Office of MoEF, the respective Zonal Office
of CPCB and the SPCB. The criteria
pollutants levels namely, SPM, RSPM, SO2, NOx (ambient levels as stack emissions) or criteria sectoral parameters, indicated for the
project shall be monitored and displayed at a convenient location near the main
gate of the company in the public domain.
(xi)
The project proponent shall also
submit six monthly reports on the status of compliance of the stipulated EC
conditions including results of monitored data (both in hard copies as well by
e- mail) to the respective Regional Office of MOEF, the respective Zonal Office
of CPCB and the SPCB.
This issues with the approval of
Competent Authority.
Yours faithfully,
(Lalit Kapur)
Director
Copy
to:-
1. The
Secretary, Ministry of Power, Shram Shakti Bhawan, Rafi Marg, New Delhi -110
001.
-4-
2. The Secretary, Environment & Forests, Government of
Karnataka, Bangalore.
3. The Chairman, Central Electricity Authority, Sewa Bhawan, R.K.
Puram, New Delhi-110 066.
4. The Chairman, Karnataka Pollution Control Board, 49, Parisara
Bhawan, 4th and 5th Floor, Church Street,
Bangalore-560001 with a request to display a copy of the clearance letter at
the Regional Office, District
Industries Centre and Collector’s office for 30 days.
5. The
Chairman, Central Pollution Control Board, Parivesh Bhawan, CBD-cum-Office
Complex, East Arjun Nagar, Delhi-110 032.
6. The Chief Conservator of Forests (C),
Regional Office (SZ), Kendriya Sadan, 4th floor, E&F Wings, 17th
Main Road, II-Block, Koramangala, Bangalore-560034.
7. Director (EI), MOEF.
8. Guard file.
9. Monitoring file.
(LALIT KAPUR)
DIRECTOR