Form-4
APPLICATION FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE
(To be filled up by User Agency)
Proposal No. : IA/MH/CMIN/117831/2019
(a) Name of the project : Expansion of Gondegaon Extension OC
(e) Joint Venture (Yes/No) : No 2. | Address for the Correspondence |
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006 |
(a). Major Activity. : 1(a) Mining of minerals
Minor Activity : 2(b) Mineral beneficiation
Major Sub Activity. : Open Cast Mining
Minor Sub Activity : No
(b). Category : A
Reason for applicant at central level/state level(in case of B1 and B2 projects): No
(a) Plot No/Survey No/Khasra No : Latitudes : N 79 degree 10 minutes 22 seconds -N 79 Degree 12 minutes 48 Seconds Longitudes : E 21 Degree 16 Minutes 47 Seconds -E 21 degree 15 Minutes 00 Seconds Toposheet 55 O/3 of Survey of India
(b) Village : Ghatrohana Village
(c) Tehsil : Parseoni
(d) District : Nagpur
(e) State : Maharashtra
(f) Pin Code : 441404
(g) Bounded Latitudes (North) : Yes
From : Degree:79, Minutes : 10, Second :22
To : Degree:79, Minutes : 12, Second :48
(h) Bounded Longitudes (East) : Yes
From : Degree:21, Minutes : 16, Second :47
To : Degree:21, Minutes : 15, Second :00
(i) Survey of India Topo Sheet No : 55 O/3 5 | Details of Environment Clearance |
(a) Project Name : Expansion of Gondegaon Extension OC
(b) MoEF&CC / SEIAA File No : J-11015/106/2009-IA.II(M)
(c) Date of issue of EC : 14/03/2018 (d) Uploaded EC letter (PDF Only): 6 | Details of Consent to Operate |
(i) Whether Consent to operate obtained (Yes/No) ? : Yes (ii) Uploaded copies of all Consent to operate obtained since inception:
(iii)Date of issue : 06/03/2019
(iv)Valid Upto: 31/12/2020
(v)File No : Format 1.0 / BO/ CAC- Cell/ CAC- UAN no.18446/ CAC -1903000231
(vi)Application No : UAN no. 18446 (vii)Uploaded copy of Consent to operate valid as on Date:
Amendment in Configuration/ Amendments in Clearance condition/ Other (specify) : Submission:
The present proposal is for amendment of EC for “Expansion of Gondegaon Extension OC 8 | Details of Product (as per the approved EC) |
Details of Products |
---|
S.no | Product / Activity (Capacity/ Area). | Quantity | Unit | Mode of Transport/ Transmission of Product |
---|
1 | Coal -Capacity 3.50 MTPA in an area of 917.0 (Mining lease area of 845.74 ha) | 3.50 | Million tonne per annum | |
9 | Details of Configuration (Multiple Entries Allowed) |
Details of Configurations |
---|
S.no | Plant/ Equipment/ Facility | Existing Configuration | Proposed Configuration | Final configuration after Amendment | Remarks if Any |
---|
1 | Opencast Coal mining Project | 3.50 | 3.50 | 3.50 | Submission: The present proposal is for amendment of EC for “Expansion of Gondegaon Extension OC co |
Reason for Amendment : EC for Expansion of Gondegaon extension OC coal mining project was granted by MoEF & CC vide letter no. J- 11015/106/2009-IA-II(M) dated 28.03.2019 for a production capacity of 3.50 MTPA in an area of 917.0 ha (mine lease area of 845.74 ha).
In this regard, reference is drawn towards the minutes of 46th EAC meeting held on 25.06.2019 at MoEF & CC, New Delhi. In the said EAC meeting, the application for amendment in EC of Expansion of Kamptee deep OC for a capacity of 3.20 MTPA in mine lease area of 857.60 ha was discussed. The EAC after deliberation observed the following:
Quote:
“46.7.4 The EAC, after deliberation, observed that the proposed amalgamation involves carving out some area of adjoining Gondegaon Opencast coal mining project and thus requiring amendment in its environmental clearance also. There being no proposal in this regard, the Committee was not inclined to take the proposal forward.”
:unquote
Now in compliance of EAC directives, the Mining Plan of Expansion of Gondegaon extension OC coal mining project has been revised with a production capacity of 3.50 MTPA (same as approved in EC dated 28.03.2019) in an area of 791.40 ha instead of 845.74 ha (as approved in EC dated 28.03.2019). This reduction of area by 54.34 ha has been done based on approved Revised Project Report of Amalgamated Inder-Kamptee Deep OC mine (approved by WCL Board vide its resolution no. WCL/BD/SECTT./BM-304/2018/538 dated 09.10.2018) wherein it has been mentioned that, this 54.34 ha land is proposed to be transferred from Gondegaon OC to amalgamated Inder-Kamptee deep OC project.
The Revised Mining Plan of Expansion of Gondegaon Extension deep OC has now been approved by WCL board its Board vide its resolution no. WCL/ BD/ SECTT/ BM-314/ 2019/852 dated 12.09.2019. It may be mentioned here that, in the approved Mining Plan there is no change in physical parameters of mine except for the land component which has been clarified in earlier paragraphs. It is further mentioned that there is no forest land involved in Expansion of Gondegaon extension OC coal mining project.
Hence in confirmation to the EAC directives, this application for amendment of EC for Expansion of Gondegaon Extension deep OC coal mining project for a production capacity of 3.50 MTPA in an area of 791.40 ha is being made as required under EIA notification, 2006. 11 | Any Other Amendment required |
Any Other Amendment Required |
---|
S.no | Reference of Approved EC | Description as per Approved EC | Description as per Proposal. | Remarks |
---|
1 | EC for Expansion of Gondegaon Extension OC coal mining project which was granted by MoEF & CC vide l | EC for “Expansion of Gondegaon Extension OC coal m | amended EC may kindly be issued in the name of “Ex | The present proposal is for amendment of existing |
12 | Details of EIA Consultant |
Have you hired Consultant for preparing document (Yes/No) ? : Yes
(i) Accereditation No : NABET/EIA/1720/RA 0092
(ii) Name of EIA Consultant : CMPDI
(iii)Address : Gondwana Place, Kanke Road, Ranchi-834031
(iv)Mobile No: 0651223185
(v)Landline No : 0651223185
(vi)E-mail Id : Gmenv.cmpdi@coalindia.in
(vii)Category of Accreditation : A
(viii)Sector of Accreditation : Mining of Minerals Thermal Power Plants Coal Washeries
(ix)Validity of Accreditation : 1.10.2020 (x)Uploaded certificate of Accreditation certified by QCI/NABET (Upload PDF Only): 13. | Document to be Attached |
(a) Uploaded addendum to EIA/EMP Report: (b) Uploaded Copy of revised -Feasibility Report /Detailed Project Report (DPR) / Detailed Engineering Report / Detailed Conceptual Plan / Approved Mining Plan (in case of mining proposals): (c) Upload Copy of final Layout Plan: (d)Uploaded Cover Letter duly signed by the project proponent or authorized person: (e)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency: (f)Uploaded Additional File, If any:
(g)Uploaded Proposal Presentation : No Data Details of State of the project |
---|
S.no. | EDS Sought Date | EDS Sought | Letter |
---|
NIL |
Additional Detail Sought |
---|
S.no. | Ads Letter | Remarks | Date of Submission |
---|
1. | Additional Information | pls find the enclosed letter. For your kind perusal please | 06 Dec 2019 |
2. | Additional Information | This is submitted for your kind consideration and grant of EC for amendment with extension of EC validity. | 23 Dec 2019 |
(a): I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up. (b)Name : No (c)Designation: No (d)Company: No (e)Address: No