Form-4

APPLICATION FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE

(To be filled up by User Agency)
1. Details of Project
 
Proposal No. : SIA/OR/MIN/307515/2023  
(a) Name of the project : GUHURIAMUNDA-B STONE QUARRY  
(b) Name of Company / Organisation. : SURESH AGRAWAL  
(c) Registered Address. : Durga Mandap, Kodapada VTC: Patnagarh, Po- Patnagarh Dist- Balangir, Odisha Orissa 767025  
(d) Legal Status of the Company. : Individual  
(e) Joint Venture (Yes/No) : No
2. Address for the Correspondence
 
(a) Name of the Applicant. : SURESH AGRAWAL  
(b) Designation (Owner/Partner/CEO) : No  
(c) Address :-  
       State : Orissa  
       District : Ganjam  
       Town / Village : No  
(d) Pin Code : 767025  
(e) Email : guhurimundabstone@gmail.com  
(f) Telephone no : No  
(g) Fax no : No  
(h) Mobile no : 9938025024  
(i) Contact Person. : SURESH AGRAWAL  
(j) Website (if any) : No
3. Category of the Project/Activity as per Schedule of EIA Notification,2006
 
(a). Major Activity. : 1(a) Mining of minerals
                               
 
      Minor Activity : No  
      Major Sub Activity. : No  
      Minor Sub Activity : No  
(b). Category : B2  
      Reason for applicant at central level/state level(in case of B1 and B2 ): No  
(c). Reason : No  
      EAC Concerned (for category A Projects Only ): No
4. Location of the Project
 
(a) Plot No/Survey No/Khasra No : Khata no 68, Plot no.-13  
(b) Village : Guhuriamunda  
(c) Tehsil : Patnagarh  
(d) District : Balangir  
(e) State : Orissa  
(f) Pin Code : 767025  
(g) Bounded Latitudes (North) : Yes  
        From : Degree:20, Minutes : 40, Seconds :29  
        To    : Degree:20, Minutes : 40, Seconds :33  
(h) Bounded Longitudes (East) : Yes  
        From : Degree:83, Minutes : 04, Seconds :20  
        To    : Degree:83, Minutes : 04, Seconds :28  
(i) Survey of India Topo Sheet No : 64P2
5 Details of Environmental Clearance
 
(a) Project Name : GUHURIAMUNDA-B STONE QUARRY  
(b) MoEF&CC / SEIAA File No : 4516/SEIAA  
(c) Date of issue of EC : 11/05/2022   (d) Uploaded EC letter :
6 Details of Consent to Operate
 
(i) Whether Consent to operate obtained (Yes/No) ? : No
7 Amendment Sought for
 
Amendment in Configuration/ Amendments in Clearance condition/ Other (specify) : SUBMISSION WITH PREVIOUS EC COMPLIANCE.
8 Details of Product (as per the approved EC)
Details of Products
S.no Product / Activity (Capacity/ Area). Quantity Unit Mode of Transport/ Transmission of Product
1STONE26.66Cubic meter per DayRoad
9 Details of Configuration (Multiple Entries Allowed)
Details of Configurations
S.no Plant/ Equipment/ Facility Existing Configuration Proposed Configuration Final configuration after Amendment Remarks if Any
1MINING OF STONE351063996399
10 Reasons for Amendment
 
Reasons for Amendment : FOR PRODUCTION ENHANCEMENT.
11 Any Other Amendment required
Any Other Amendment Required
S.no Reference of Approved EC Description as per Approved EC Description as per Proposal. Remarks
1EC GRANTED WITH SUBMISSION OF APPROVED MINING PLANTHE PRODUCTION IN WHICH EC GRANTED EARLIER WITH THSUBMISSION OF COMPLIANCE REPORT
12 Details of EIA Consultant
 
Have you hired Consultant for preparing document (Yes/No) ? : No  
(i)Reason for not engaging the Consultant : AS IT IS A B2 CATEGORY PROJECT.
13. Documents to be Attached
  (a) Uploaded addendum to EIA/EMP Report:  
(b) Uploaded Copy of revised -Feasibility Report /Detailed Project Report (DPR) / Detailed Engineering Report / Detailed Conceptual Plan / Approved Mining Plan (in case of mining proposals) : No Data  
(c) Uploaded Copy of final Layout Plan : No Data   (d)Uploaded Cover Letter duly signed by the project proponent or authorized person:   (e)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency:   (f)Uploaded Additional File, If any:
Essential Details Sought
Essential Details Sought
S.no. EDS Sought Date EDS Sought Letter
1.26/12/2023The project proponent ask to submit the details about nearest quarry coming under single cluster and its compliance.
2.24/01/2024The corrections have been made as per the instruction received.
3.12/02/2024As per the mining plan approval letter by Joint Director of Geology, Zonal Survey, Balangir dt. 12.03.2020 the annul production of stone of Guhuriamunda-B Stone Quarry was approved 3510cum/annum(maximum). Accordingly, EC was issued by SEIAA, Odisha vide letter no. 1151/SEIAA dt, 30.03.2021 allowing extraction of stone of quantity 3510cum/annum as per approved Mining Plan. Now, the PP applied submitted amendment of EC application enhancing production capacity from 3150 cum. annum to 66683 cum/annum in the same approved mining plan was approved earlier on 30.03.2021 that may be clarified by concerned lease granting authority .
4.23/02/2024The corrections have been made as per the instruction received.
 
Additional Detail Sought:   NIL
14. Undertaking
(a): I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up. (b)Name : SURESH AGRAWAL (c)Designation: No (d)Company: SURESH AGRAWAL (e)Address: Durga Mandap, Kodapada VTC: Patnagarh, Po- Patnagarh Dist- Balangir, Odisha Orissa 767025