Form-4

APPLICATION FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE

(To be filled up by User Agency)
1. Details of Project
 
Proposal No. : SIA/OR/MIN/306679/2023  
(a) Name of the project : Mandua Sand Quarry  
(b) Name of Company / Organisation. : AJIT SAHOO  
(c) Registered Address. : Deranga, Kaniha, Angul Orissa 759117  
(d) Legal Status of the Company. : Individual  
(e) Joint Venture (Yes/No) : No
2. Address for the Correspondence
 
(a) Name of the Applicant. : AJIT SAHOO  
(b) Designation (Owner/Partner/CEO) : No  
(c) Address :-  
       State : Orissa  
       District : Angul  
       Town / Village : No  
(d) Pin Code : 759117  
(e) Email : ecmanduasandbed@gmail.com  
(f) Telephone no : No  
(g) Fax no : No  
(h) Mobile no : 7873060485  
(i) Contact Person. : AJIT SAHOO  
(j) Website (if any) : No
3. Category of the Project/Activity as per Schedule of EIA Notification,2006
 
(a). Major Activity. : 1(a) Mining of minerals
                               
 
      Minor Activity : 1(a) Mining of minerals
                               
 
      Major Sub Activity. : No  
      Minor Sub Activity : Open Cast Mining  
(b). Category : B2  
      Reason for applicant at central level/state level(in case of B1 and B2 ): No  
(c). Reason : No  
      EAC Concerned (for category A Projects Only ): No
4. Location of the Project
 
(a) Plot No/Survey No/Khasra No : Khata No-70,Plot No-2201(p)  
(b) Village : Mandua  
(c) Tehsil : Chhendipada  
(d) District : Angul  
(e) State : Orissa  
(f) Pin Code : 759117  
(g) Bounded Latitudes (North) : Yes  
        From : Degree:21, Minutes : 09, Seconds :15  
        To    : Degree:21, Minutes : 09, Seconds :28  
(h) Bounded Longitudes (East) : Yes  
        From : Degree:84, Minutes : 59, Seconds :24  
        To    : Degree:84, Minutes : 59, Seconds :30  
(i) Survey of India Topo Sheet No : F45M16 , F45N4
5 Details of Environmental Clearance
 
(a) Project Name : Mandua Sand Quarry  
(b) MoEF&CC / SEIAA File No : SEIAA-46/02-2020  
(c) Date of issue of EC : 25/06/2020   (d) Uploaded EC letter :
6 Details of Consent to Operate
 
(i) Whether Consent to operate obtained (Yes/No) ? : No
7 Amendment Sought for
 
Amendment in Configuration/ Amendments in Clearance condition/ Other (specify) : Production as per Approved mining plan-10000Cum, Asper Approved EC-10000Cum,Proposed production.
8 Details of Product (as per the approved EC)
Details of Products
S.no Product / Activity (Capacity/ Area). Quantity Unit Mode of Transport/ Transmission of Product
1River Sand10000OthersRoad
9 Details of Configuration (Multiple Entries Allowed)
Details of Configurations
S.no Plant/ Equipment/ Facility Existing Configuration Proposed Configuration Final configuration after Amendment Remarks if Any
1Tipper600
10 Reasons for Amendment
 
Reasons for Amendment : From the replenishment study report it is found that mineable reserve after post-monsoon survey is 62240Cum, hence production shall be maintain as per approved mining plan i.e 10000Cum per annum.
11 Any Other Amendment required
Any Other Amendment Required
S.no Reference of Approved EC Description as per Approved EC Description as per Proposal. Remarks
1Production as per approved mining plan-10000Cum,Production as per approved EC-10000CumProduction as per approved Ec is 10000CumProduction shall be 10000Cum
12 Details of EIA Consultant
 
Have you hired Consultant for preparing document (Yes/No) ? : No  
(i)Reason for not engaging the Consultant : B2 Project
13. Documents to be Attached
  (a) Uploaded addendum to EIA/EMP Report:   (b) Uploaded Copy of revised -Feasibility Report /Detailed Project Report (DPR) / Detailed Engineering Report / Detailed Conceptual Plan / Approved Mining Plan (in case of mining proposals):   (c) Uploaded Copy of final Layout Plan:   (d)Uploaded Cover Letter duly signed by the project proponent or authorized person:   (e)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency:   (f)Uploaded Additional File, If any:
Essential Details Sought
Essential Details Sought
S.no. EDS Sought Date EDS Sought Letter
1.28/11/2023The project proponent ask to submit KML file of the lease area and send to SEIAA, Odisha Email-info.seiaaodisha@gmail.com and also submit legible copy of EC letter.
2.28/11/2023The project proponent ask to submit KML file of the lease area and send to SEIAA, Odisha Email-info.seiaaodisha@gmail.com and also submit legible copy of EC letter.
3.15/12/2023The corrections have been made as per the instruction received.
4.18/01/20241).The KML file submitted by the PP is in point source. The PP ask to submit proper KML file and the exact quantity of sand extracted from the source in 1st year against EC letter. 2). The PP and lease granting Authority jointly submit the proforma applicable for violation or non-violation.
5.01/02/2024The corrections have been made as per the instruction received.
 
Additional Detail Sought:   NIL
14. Undertaking
(a): I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up. (b)Name : AJIT SAHOO (c)Designation: No (d)Company: AJIT SAHOO (e)Address: Deranga, Kaniha, Angul Orissa 759117