Form-4
APPLICATION FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE
(To be filled up by User Agency)
Proposal No. : SIA/OR/MIN/306201/2023
(a) Name of the project : Mongrapali Sand Quarry
(b) Name of Company / Organisation. : EQBAL GANDHI
(c) Registered Address. : MONGARAPALI
AMODI,KHARIAR ROAD
NUAPADA Orissa 766104
(d) Legal Status of the Company. : Individual
(e) Joint Venture (Yes/No) : No 2. | Address for the Correspondence |
(a) Name of the Applicant. : EQBAL SINGH GANDHI
(b) Designation (Owner/Partner/CEO) : OWNER
(c) Address :-
State : Orissa
District : No
Town / Village : No
(d) Pin Code : 766104
(e) Email : ecmongrapalisandquarry@gmail.com
(f) Telephone no : No
(g) Fax no : No
(h) Mobile no : 9437140703
(i) Contact Person. : EQBALGANDHI
(j) Website (if any) : No 3. | Category of the Project/Activity as per Schedule of EIA Notification,2006 |
(a). Major Activity. : 1(a) Mining of minerals
Minor Activity : 1(a) Mining of minerals
Major Sub Activity. : No
Minor Sub Activity : Open Cast Mining
(b). Category : B2
Reason for applicant at central level/state level(in case of B1 and B2 ): No
(c). Reason : No
EAC Concerned (for category A Projects Only ): No 4. | Location of the Project |
(a) Plot No/Survey No/Khasra No : Khata no-187, Plot no-24
(b) Village : Mongrapali
(c) Tehsil : Nuapada
(d) District : Nuapada
(e) State : Orissa
(f) Pin Code : 766104
(g) Bounded Latitudes (North) : Yes
From : Degree:20, Minutes : 58, Seconds :40
To : Degree:20, Minutes : 58, Seconds :54
(h) Bounded Longitudes (East) : Yes
From : Degree:82, Minutes : 34, Seconds :46
To : Degree:82, Minutes : 34, Seconds :59
(i) Survey of India Topo Sheet No : F44W9 5 | Details of Environmental Clearance |
(a) Project Name : Mongrapali Sand Quarry
(b) MoEF&CC / SEIAA File No : 265473/251-MINB2/04-2022
(c) Date of issue of EC : 30/06/2022 (d) Uploaded EC letter : 6 | Details of Consent to Operate |
(i) Whether Consent to operate obtained (Yes/No) ? : Yes (ii) Uploaded copies of all Consent to operate obtained since inception:
(iii)Date of issue : 15/11/2022
(iv)Valid Upto: 01/11/2023
(v)File No : No
(vi)Application No : No (vii)Uploaded copy of Consent to operate valid as on Date:
Amendment in Configuration/ Amendments in Clearance condition/ Other (specify) : Production as per Approved Mining Plan- 10000Cum, Asper Approved EC-3500Cum, Proposed production 8 | Details of Product (as per the approved EC) |
Details of Products |
---|
S.no | Product / Activity (Capacity/ Area). | Quantity | Unit | Mode of Transport/ Transmission of Product |
---|
1 | River Sand | 3500 | Others | Road |
9 | Details of Configuration (Multiple Entries Allowed) |
Details of Configurations |
---|
S.no | Plant/ Equipment/ Facility | Existing Configuration | Proposed Configuration | Final configuration after Amendment | Remarks if Any |
---|
1 | Tipper | 6Cum | 0 | 0 | |
Reasons for Amendment : From the replenishment study report it is found that mineable reserve after post-monsoon survey is 17,760Cum, hence production shall be maintain as per approved mining plan i.e 10000Cum per annum. 11 | Any Other Amendment required |
Any Other Amendment Required |
---|
S.no | Reference of Approved EC | Description as per Approved EC | Description as per Proposal. | Remarks |
---|
1 | Production as per approved Mining Plan- 10000Cum, Production as per approved EC- 3500Cum | Production as per approved EC is 3500Cum | Production shall be 10000Cum | |
12 | Details of EIA Consultant |
Have you hired Consultant for preparing document (Yes/No) ? : No
(i)Reason for not engaging the Consultant : As it is a category-B2 project 13. | Documents to be Attached |
(a) Uploaded addendum to EIA/EMP Report:
(b) Uploaded Copy of revised -Feasibility Report /Detailed Project Report (DPR) / Detailed Engineering Report / Detailed Conceptual Plan / Approved Mining Plan (in case of mining proposals) : No Data
(c) Uploaded Copy of final Layout Plan : No Data (d)Uploaded Cover Letter duly signed by the project proponent or authorized person: (e)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency: (f)Uploaded Additional File, If any: Essential Details Sought |
---|
S.no. | EDS Sought Date | EDS Sought | Letter |
---|
1. | 03/11/2023 | 1).The CTO issued by SPCB for production of 10000 cum of sand but EC and transfer of EC was issued for 3500 cum sand for 1st lease period.
2). The PP has not submitted compliance of transfer of EC additional stipulation.
In view of the above the PP ask to submit certified compliance report from lease granting Authority with mentioning production details and also submit compliance of transfer of EC conditions. | |
2. | 03/11/2023 | 1).The CTO issued by SPCB for production of 10000 cum of sand but EC and transfer of EC was issued for 3500 cum sand for 1st lease period.
2). The PP has not submitted compliance of transfer of EC additional stipulation.
In view of the above the PP ask to submit certified compliance report from lease granting Authority with mentioning production details and also submit compliance of transfer of EC conditions. | |
3. | 03/11/2023 | 1).The CTO issued by SPCB for production of 10000 cum of sand but EC and transfer of EC was issued for 3500 cum sand for 1st lease period.
2). The PP has not submitted compliance of transfer of EC additional stipulation.
In view of the above the PP ask to submit certified compliance report from lease granting Authority with mentioning production details and also submit compliance of transfer of EC conditions. | |
4. | 03/11/2023 | 1).The CTO issued by SPCB for production of 10000 cum of sand but EC and transfer of EC was issued for 3500 cum sand for 1st lease period.
2). The PP has not submitted compliance of transfer of EC additional stipulation.
In view of the above the PP ask to submit certified compliance report from lease granting Authority with mentioning production details and also submit compliance of transfer of EC conditions. | |
5. | 03/11/2023 | 1).The CTO issued by SPCB for production of 10000 cum of sand but EC and transfer of EC was issued for 3500 cum sand for 1st lease period.
2). The PP has not submitted compliance of transfer of EC additional stipulation.
In view of the above the PP ask to submit certified compliance report from lease granting Authority with mentioning production details and also submit compliance of transfer of EC conditions. | |
6. | 23/02/2024 | The corrections have been made as per the instruction received. | |
7. | 22/04/2024 | Please withdrawal the amendment of EC application as already amendment of EC approved by SEIAA, Odisha in the Parivesh-2.0 for the same proposal. | |
| Additional Detail Sought: NIL |
(a): I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up. (b)Name : EQBAL SINGH GANDHI (c)Designation: OWNER (d)Company: EQBAL GANDHI (e)Address: MONGARAPALI
AMODI,KHARIAR ROAD
NUAPADA Orissa 766104