Form-6
APPLICATION FOR EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE
(To be filled up by User Agency)
1.
Details of Project
Proposal No. :
SIA/MP/MIN/304787/2023
(a) Name of the project :
Musamundi Sand Quarry
(b) Name of Company / Organisation. :
RAVINDRA MISHRA
(c) Registered Address. :
The Madhya Pradesh State Mining Corporation Limited, Paryawas Bhawan, Block No. 1(A), Second Floor, Jail Road, Arera Hills, District Bhopal (M.P.) 462011 Madhya Pradesh 462011
(d) Legal Status of the Company. :
Individual
(e) Joint Venture (Yes/No) :
No
2.
Address for the Correspondence
(a) Name of the Applicant. :
RAVINDRA MISHRA
(b) Designation (Owner/Partner/CEO) :
No
(c) Address
:-
State :
Madhya Pradesh
District :
Bhopal
Town / Village :
No
(d) Pin Code :
462011
(e) Email :
districtdindorisandec@gmail.com
(f) Telephone no :
No
(g) Fax no :
No
(h) Mobile no :
9836167750
(i) Contact Person. :
RAVINDRA MISHRA
(j) Website (if any) :
No
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006
(a). Major Activity. :
1(a) Mining of minerals
Minor Activity :
No
Major Sub Activity. :
No
Minor Sub Activity :
No
(b). Category :
B1
Reason for applicant at central level/state level(in case of B1 and B2 ):
No
(c). Reason :
No
EAC Concerned (for category A Projects Only ):
No
4.
Location of the Project
(a) Plot No/Survey No/Khasra No :
54
(b) Village :
Musamundi
(c) Tehsil :
Bajag
(d) District :
Dindori
(e) State :
Madhya Pradesh
(f) Pin Code :
481880
(g) Bounded Latitudes (North) :
Yes
From :
Degree:22, Minutes : 46, Seconds :29
To :
Degree:22, Minutes : 47, Seconds :12
(h) Bounded Longitudes (East) :
Yes
From :
Degree:81, Minutes : 27, Seconds :10
To :
Degree:81, Minutes : 26, Seconds :47
(i) Survey of India Topo Sheet No :
64-F/5,64-F/6
5.
Details of Environmental Clearance
(a) Project Name :
Musamundi Sand Quarry
(b) MoEF&CC / SEIAA File No :
7863/2020
(c) Date of issue of EC :
13/05/2021
(d) Uploaded EC letter :
6.
Details of Consent to Establishment
(i) Whether Consent to operate Establishment obtained (Yes/No) ? :
No
7
Whether Amendment is environmental clearance is also sought for ?:-
Amendment in Configuration/ Amendments in Clearance condition/ Other (specify) :
No
8
Details of Production (as per the approved EC ):-
Details of Products
S.no
Product / Activity (Capacity/ Area).
Quantity
Unit
Mode of Transport/ Transmission of Product
1
River Sand
40500
Others
Road
9
Details of Amendment in Configuration sought(Multiple Entries Allowed):-
Details of Configurations
S.no
Plant/ Equipment/ Facility
Existing Configuration
Proposed Configuration
Final configuration after Amendment
Remarks if Any
1
Lease Area & Production Capacity
7.0 ha, 40500 cubic meter per year
00
7.0 ha, 40500 cubic meter per year
There is no any change in area & production and the proposal is being applied for extension of valid
10
Any other Amendment required:-
Any Other Amendment Required
S.no
Reference of Approved EC
Description as per Approved EC
Description as per Proposal.
Remarks
1
437/SEIAA/21
00
00
Application for validity extension of EC
11
Reason for Seeking Extension of Validity of the Environmental Clearance:-
Uploaded substantiating the reason of the delay in implementation :
12
Progress of Implementation of the Project /Facilities /Activities:-
Progress of implementation of the project /facilities /activity for which environmental clearance was granted (Physical Progress) :
Application for Validity Extension of EC
13
Schedule of the Completion of the Balance Activity / Project:-
Uploaded bar chart of schedule of implementation:
14
Details of EIA Consultant
Have you hired Consultant for preparing document (Yes/No) ? :
Yes
(i) Accereditation No :
IA0092
(ii) Name of EIA Consultant :
Parivesh Environmental Engineering Services
(iii)Address :
5/916, Viram Khand, Gomti Nagar, Lucknow, Uttar Pradesh
(iv)Mobile No:
9819893405
(v)Landline No :
9819893405
(vi)E-mail Id :
vikas.parivesh@gmail.com
(vii)Category of Accreditation :
A
(viii)Sector of Accreditation :
1,8,9,21,33,34,38,39
(ix)Validity of Accreditation :
11.11.2024
(x)Uploaded certificate of Accreditation certified by QCI/NABET :
15.
Documents to be attached
(a) Uploaded addendum to EIA/EMP Report (in case of Amendment in environmental clearance also sought):
(b) Uploaded Copy of revised -Feasibility Report /Detailed Project Report (DPR) / Detailed Engineering Report / Detailed Conceptual Plan / Approved Mining Plan (in case of mining proposals)(in case of Amendment in environmental clearance also sought):
(c) Uploaded Copy of final Layout Plan (in case of Amendment in environmental clearance also sought) :
No Data
(d)Uploaded Cover Letter duly signed by the project proponent or authorized person:
(e)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency:
(f)Uploaded Additional File, If any :
No Data
Essential Details Sought
Essential Details Sought
S.no.
EDS Sought Date
EDS Sought
Letter
1.
30/09/2023
kindly upload 1. As per SEIAA OM Dated 16-08-2023 kindly upload Online processing fees reciept 2.lease Validity Extension Order. 3. Previous EC copy 4. Approved Mine Plan With Replenishment Study 5. EMP, Prepared by QCI/NABET Accredited Consul., PFR Note - Kindly Skip if any of the above documents already uploaded with the proposal
2.
10/10/2023
The corrections have been made as per the instruction received.
3.
19/12/2023
EC validity (30.06.2023) now expired. New PP Applied for extension in EC of old PP. As per the decision taken by Authority and letter No 2047 dtd 20.11.2023 issued to MPSMC. kindly apply afresh for EC.
4.
23/01/2024
The corrections have been made as per the instruction received.
5.
23/01/2024
Previous EDS not Complied please upload Annual replenishment Study approved by competent authority, Compliance Report of Previous EC, NoC of Previous PP and undertaking New PP, Approved DSR highlighting details of mine site, OIC letter for address change
6.
24/01/2024
The corrections have been made as per the instruction received.
Additional Detail Sought:
NIL
16.
Undertaking
(a):
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up.
(b)Name :
RAVINDRA MISHRA
(c)Designation:
No
(d)Company:
RAVINDRA MISHRA
(e)Address:
The Madhya Pradesh State Mining Corporation Limited, Paryawas Bhawan, Block No. 1(A), Second Floor, Jail Road, Arera Hills, District Bhopal (M.P.) 462011 Madhya Pradesh 462011