Form-4

APPLICATION FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE

(To be filled up by User Agency)
1. Details of Project
 
Proposal No. : SIA/GJ/IND3/299004/2023  
(a) Name of the project : M/s. New Tech Polychem Pvt. Ltd.  
(b) Name of Company / Organisation. : NEW TECH POLYCHEM PVT. LTD  
(c) Registered Address. : PLOT NO. C-364, Saykha-GIDC, Taluka: Vagara, District: Bharuch, Gujarat Gujarat 393001  
(d) Legal Status of the Company. : Private  
(e) Joint Venture (Yes/No) : No
2. Address for the Correspondence
 
(a) Name of the Applicant. : Navish Sahlot  
(b) Designation (Owner/Partner/CEO) : Director  
(c) Address :-  
       State : Gujarat  
       District : Bharuch  
       Town / Village : No  
(d) Pin Code : 393001  
(e) Email : ntpi222@gmail.com  
(f) Telephone no : No  
(g) Fax no : No  
(h) Mobile no : 9967659691  
(i) Contact Person. : Navish  
(j) Website (if any) : No
3. Category of the Project/Activity as per Schedule of EIA Notification,2006
 
(a). Major Activity. : 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
                               
 
      Minor Activity : No  
      Major Sub Activity. : No  
      Minor Sub Activity : No  
(b). Category : B1  
      Reason for applicant at central level/state level(in case of B1 and B2 ): No  
(c). Reason : No  
      EAC Concerned (for category A Projects Only ): No
4. Location of the Project
 
(a) Plot No/Survey No/Khasra No : Plot No. C-364  
(b) Village : Saykha-GIDC  
(c) Tehsil : Vagra  
(d) District : Bharuch  
(e) State : Gujarat  
(f) Pin Code : 393001  
(g) Bounded Latitudes (North) : Yes  
        From : Degree:21, Minutes : 47, Seconds :53  
        To    : Degree:21, Minutes : 47, Seconds :56  
(h) Bounded Longitudes (East) : Yes  
        From : Degree:72, Minutes : 53, Seconds :54  
        To    : Degree:72, Minutes : 53, Seconds :53  
(i) Survey of India Topo Sheet No : F43M13,F43M14,F43N1,F43N2
5 Details of Environmental Clearance
 
(a) Project Name : M/s. New Tech Polychem Pvt. Ltd.  
(b) MoEF&CC / SEIAA File No : SEIAA/GUJ/EC/5(f)/550/2022  
(c) Date of issue of EC : 17/02/2022   (d) Uploaded EC letter :
6 Details of Consent to Operate
 
(i) Whether Consent to operate obtained (Yes/No) ? : No
7 Amendment Sought for
 
Amendment in Configuration/ Amendments in Clearance condition/ Other (specify) : Corrigendum in quantity of product sr. no. 15 (i.e., Styrene Butadiene Emulsion) in which correction
8 Details of Product (as per the approved EC)
Details of Products
S.no Product / Activity (Capacity/ Area). Quantity Unit Mode of Transport/ Transmission of Product
1Paints Binder6000Tons per Annun(TPA)Road
2Paper Binder6000Tons per Annun(TPA)Road
3Textile Binder3000Tons per Annun(TPA)Road
4Construction Chemical3000Tons per Annun(TPA)Road
5Stone Binder3600Tons per Annun(TPA)Road
6Synthetic Adhesive10800Tons per Annun(TPA)Road
7Acrylic Polymers12000Tons per Annun(TPA)Road
8Vinyl Polymers12000Tons per Annun(TPA)Road
9Retention Aid (Acrylamide Polymer)4800Tons per Annun(TPA)Road
10WSR (Wet Strength Resin)3600Tons per Annun(TPA)Road
11Styrene Butadiene Emulsion12000Tons per Annun(TPA)Road
12Poly Urethane (PU) Resin Dispersion3000Tons per Annun(TPA)Road
13Unsaturated Polyester Resin3000Tons per Annun(TPA)Road
14Surface Sizing For Paper3600Tons per Annun(TPA)Road
15Cationic Surface Sizing3600Tons per Annun(TPA)Road
16High Impact Polystyrene Resin6000Tons per Annun(TPA)Road
17Pure Acrylate2400Tons per Annun(TPA)Road
18Ethylene Vinyl Acetate Emulsion6000Tons per Annun(TPA)Road
19Acrylate Styrene Emulsion12000Tons per Annun(TPA)Road
9 Details of Configuration (Multiple Entries Allowed)
Details of Configurations
S.no Plant/ Equipment/ Facility Existing Configuration Proposed Configuration Final configuration after Amendment Remarks if Any
1Steam Boiler(2 TPH x 2) [one working & one standby](2 TPH x 2) [one working & one standby]
2Steam Boiler(850 kg/hr x 2) [one working & one standby](850 kg/hr x 2) [one working & one standby]
10 Reasons for Amendment
 
Reasons for Amendment : Corrigendum in quantity of product sr. no. 15 (i.e., Styrene Butadiene Emulsion) in which correction is required. Please may note that, in EC application quantity of product is 1000 MT/Month but in granted EC Copy/letter it is given 100 MT/Month in the product table. And Amendment in fuel.
11 Any Other Amendment required
Any Other Amendment Required
S.no Reference of Approved EC Description as per Approved EC Description as per Proposal. Remarks
1As per granted ECQuantity of product sr. no. 15 (i.e., Styrene ButaPlease may note that, in EC application as well as
2A.3 AIR Condition No. 15As stated in Annexure-B of our application requestAs stated in Annexure-B of our application requestAddition of fuel (i.e., H.S.D. / L.S.H.S.) for boi
12 Details of EIA Consultant
 
Have you hired Consultant for preparing document (Yes/No) ? : Yes  
(i) Accereditation No : NABET/EIA/2124/RA 0224  
(ii) Name of EIA Consultant : Paramarsh Servicing Environment and Development  
(iii)Address : M.S.-1/10 Sector A, Sitapur Road Yojna, Ram Ram Bank Chauraha, Aliganj, Lucknow-226024  
(iv)Mobile No: 9662024515  
(v)Landline No : 9662024515  
(vi)E-mail Id : eiaexpert.qcinabet@gmail.com  
(vii)Category of Accreditation : Category A  
(viii)Sector of Accreditation : 21  
(ix)Validity of Accreditation : 01/05/2024   (x)Uploaded certificate of Accreditation certified by QCI/NABET :
13. Documents to be Attached
  (a) Uploaded addendum to EIA/EMP Report:   (b) Uploaded Copy of revised -Feasibility Report /Detailed Project Report (DPR) / Detailed Engineering Report / Detailed Conceptual Plan / Approved Mining Plan (in case of mining proposals):   (c) Uploaded Copy of final Layout Plan:   (d)Uploaded Cover Letter duly signed by the project proponent or authorized person:   (e)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency:   (f)Uploaded Additional File, If any:
Essential Details Sought
Essential Details Sought
S.no. EDS Sought Date EDS Sought Letter
1.09/05/2023(1) First clarify whether it is corrigendum or amendment in EC? (2) Your project falls under B1 category so submit addendum EIA report through accredited valid NABET consultant if it is amendment application (3) Submit SEAC filled format. (4) It is not clear what changes you required.
2.29/02/2024The corrections have been made as per the instruction received.
 
Additional Detail Sought:   NIL
14. Undertaking
(a): I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up. (b)Name : Navish Sahlot (c)Designation: Director (d)Company: NEW TECH POLYCHEM PVT. LTD (e)Address: PLOT NO. C-364, Saykha-GIDC, Taluka: Vagara, District: Bharuch, Gujarat Gujarat 393001