Form-4
APPLICATION FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE
(To be filled up by User Agency)
Proposal No. : SIA/PB/MIS/294800/2022
(a) Name of the project : Jubilee vallum
(b) Name of Company / Organisation. : MANOHAR INFRASTRUCTURE CONSTRUCTION PVT LTD
(c) Registered Address. : Manohar Campus, SCO No. 139-141, Sector 17C, Chandigarh Chandigarh 160017
(d) Legal Status of the Company. : Private
(e) Joint Venture (Yes/No) : No 2. | Address for the Correspondence |
(a) Name of the Applicant. : Surinder Talwar
(b) Designation (Owner/Partner/CEO) : Authorized Signatory
(c) Address :-
State : Chandigarh
District : Chandigarh
Town / Village : No
(d) Pin Code : 160017
(e) Email : talwar.skt@gmail.com
(f) Telephone no : 5016888
(g) Fax no : No
(h) Mobile no : 8196097333
(i) Contact Person. : Surinder
(j) Website (if any) : No 3. | Category of the Project/Activity as per Schedule of EIA Notification,2006 |
(a). Major Activity. : 8(a) Building and Construction projects
Minor Activity : No
Major Sub Activity. : No
Minor Sub Activity : No
(b). Category : B2
Reason for applicant at central level/state level(in case of B1 and B2 ): No
(c). Reason : No
EAC Concerned (for category A Projects Only ): No 4. | Location of the Project |
(a) Plot No/Survey No/Khasra No : 49//4/2 (1-9), 49//5/1(3-2), 49//5/2(3-10), 5/3(0-15), 47//24/1(6-3) 47//24/2(1-4), 47//25(6-16), 49//6(8-0)
(b) Village : sector 90 - 91 mohali
(c) Tehsil : S.A.S.Nagar (Mohali)
(d) District : SAS Nagar
(e) State : Punjab
(f) Pin Code : 160071
(g) Bounded Latitudes (North) : Yes
From : Degree:30, Minutes : 42, Seconds :007
To : Degree:30, Minutes : 41, Seconds :584
(h) Bounded Longitudes (East) : Yes
From : Degree:76, Minutes : 40, Seconds :581
To : Degree:76, Minutes : 41, Seconds :023
(i) Survey of India Topo Sheet No : H43K10 5 | Details of Environmental Clearance |
(a) Project Name : Jubilee Vallum
(b) MoEF&CC / SEIAA File No : SIA/PB/NCP/50089/2017
(c) Date of issue of EC : 02/02/2023 (d) Uploaded EC letter : 6 | Details of Consent to Operate |
(i) Whether Consent to operate obtained (Yes/No) ? : No
Amendment in Configuration/ Amendments in Clearance condition/ Other (specify) : No 8 | Details of Product (as per the approved EC) |
Details of Products |
---|
S.no | Product / Activity (Capacity/ Area). | Quantity | Unit | Mode of Transport/ Transmission of Product |
---|
1 | Land area | 11768.05 Sqm | Others | Others |
2 | Flats | 125 No. | Others | Others |
3 | Fresh Water | 66 KLD | Others | Others |
4 | Domestic water required | 94 KLD | Others | Others |
5 | MSW | 250 Kg/day | Others | Others |
6 | Builtup Area | 43165.17 Sqm | Others | Others |
7 | Flushing | 28 KLD | Others | Others |
9 | Details of Configuration (Multiple Entries Allowed) |
Details of Configurations |
---|
S.no | Plant/ Equipment/ Facility | Existing Configuration | Proposed Configuration | Final configuration after Amendment | Remarks if Any |
---|
1 | Fresh water | 66 | 1 | 67 | KLD |
2 | Domestic water required | 94 | 1 | 95 | KLD |
3 | Flats | 125 | 1 | 126 | No. |
4 | MSW | 250 | 2 | 252 | Kg/day |
5 | Builtup Area | 43165.17 | -79.17 | 43086 | Sqm |
Reasons for Amendment : 1 No. Flat has been increased and the builtup area has been decreased 11 | Any Other Amendment required |
Any Other Amendment Required |
---|
S.no | Reference of Approved EC | Description as per Approved EC | Description as per Proposal. | Remarks |
---|
1 | Flats | 125 | 126 | No. |
2 | Domestic water required | 94 | 95 | KLD |
3 | Builtup Area | 43165.17 | 43086 | Sqm |
4 | Fresh water | 66 | 67 | KLD |
5 | MSW | 250 | 252 | Kg/day |
12 | Details of EIA Consultant |
Have you hired Consultant for preparing document (Yes/No) ? : No
(i)Reason for not engaging the Consultant : only amendment 13. | Documents to be Attached |
(a) Uploaded addendum to EIA/EMP Report: (b) Uploaded Copy of revised -Feasibility Report /Detailed Project Report (DPR) / Detailed Engineering Report / Detailed Conceptual Plan / Approved Mining Plan (in case of mining proposals): (c) Uploaded Copy of final Layout Plan: (d)Uploaded Cover Letter duly signed by the project proponent or authorized person: (e)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency: (f)Uploaded Additional File, If any: Essential Details Sought |
---|
S.no. | EDS Sought Date | EDS Sought | Letter |
---|
NIL |
| Additional Detail Sought: NIL |
(a): I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up. (b)Name : Surinder Talwar (c)Designation: Authorized Signatory (d)Company: MANOHAR INFRASTRUCTURE CONSTRUCTION PVT LTD (e)Address: Manohar Campus, SCO No. 139-141, Sector 17C, Chandigarh Chandigarh 160017