Form-4

APPLICATION FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE

(To be filled up by User Agency)
1. Details of Project
 
Proposal No. : SIA/RJ/MIN/294208/2022  
(a) Name of the project : Amendment in EC of Chohten River Bed Mining Project  
(b) Name of Company / Organisation. : PARAS SETHI  
(c) Registered Address. : New Friends Colony,New Delhi 110065 Haryana 110065  
(d) Legal Status of the Company. : Individual  
(e) Joint Venture (Yes/No) : No
2. Address for the Correspondence
 
(a) Name of the Applicant. : PARAS SETHI  
(b) Designation (Owner/Partner/CEO) : No  
(c) Address :-  
       State : Haryana  
       District : Vaishali  
       Town / Village : No  
(d) Pin Code : 110065  
(e) Email : chohtanbajri@gmail.com  
(f) Telephone no : No  
(g) Fax no : No  
(h) Mobile no : 9811300003  
(i) Contact Person. : PARAS SETHI  
(j) Website (if any) : No
3. Category of the Project/Activity as per Schedule of EIA Notification,2006
 
(a). Major Activity. : 1(a) Mining of minerals
                               
 
      Minor Activity : 1(a) Mining of minerals
                               
 
      Major Sub Activity. : No  
      Minor Sub Activity : Open Cast Mining  
(b). Category : B1  
      Reason for applicant at central level/state level(in case of B1 and B2 ): No  
(c). Reason : No  
      EAC Concerned (for category A Projects Only ): No
4. Location of the Project
 
(a) Plot No/Survey No/Khasra No : 200/135,132  
(b) Village : shivpura  
(c) Tehsil : Chohtan  
(d) District : Barmer  
(e) State : Rajasthan  
(f) Pin Code : 344702  
(g) Bounded Latitudes (North) : Yes  
        From : Degree:25, Minutes : 31, Seconds :47  
        To    : Degree:25, Minutes : 32, Seconds :56  
(h) Bounded Longitudes (East) : Yes  
        From : Degree:71, Minutes : 13, Seconds :43  
        To    : Degree:71, Minutes : 14, Seconds :38  
(i) Survey of India Topo Sheet No : 40O/2, 40O/3, 40O/6, 40O/7
5 Details of Environmental Clearance
 
(a) Project Name : Amendment in EC of Chohten River Bed Mining Project  
(b) MoEF&CC / SEIAA File No : J-11015/217/2013-IA.II (M),  
(c) Date of issue of EC : 03/02/2022   (d) Uploaded EC letter :
6 Details of Consent to Operate
 
(i) Whether Consent to operate obtained (Yes/No) ? : No
7 Amendment Sought for
 
Amendment in Configuration/ Amendments in Clearance condition/ Other (specify) : Amendment: - 1. Looking at the Rajasthan Scenario, the max depth of working will be till 3.0 m. 2.
8 Details of Product (as per the approved EC)
Details of Products
S.no Product / Activity (Capacity/ Area). Quantity Unit Mode of Transport/ Transmission of Product
1River bed sand mining/ 1(a)/2.52 Lakh TPA/54.68ha.2.52 Lakh TPA (ROM)OthersRoad
9 Details of Configuration (Multiple Entries Allowed)
Details of Configurations
S.no Plant/ Equipment/ Facility Existing Configuration Proposed Configuration Final configuration after Amendment Remarks if Any
1NANANANANO CHANGES
10 Reasons for Amendment
 
Reasons for Amendment : The reason for amendment is accounted to the fact that the production 2.52lakh TPA (ROM) accorded with area 54.68ha.. of excavation with depth of 3.0m. In compliance of Supreme Court order replenishment report has been submitted and fresh deposition of _ sediments on the river bed from replenishment report 1,530,900 MT is reported, desired excavation quantity is hardly 6.07% of the replenished quantity, therefore depth of mining should be increased from 1mtr to 3mtr from original ground level. Sediments on the bed, which if not removed will account for change in river morphology in the due course of time resulting in Public and asset losses. This production quantity and area of mining was determined by the royalty collected in the area on realistic basis. The same is in sync with the approved Mining Plan. As lease period is only 13 month from the date of execution of mining lease therefore EC April be co-terminus with mining lease period.
11 Any Other Amendment required
Any Other Amendment Required
S.no Reference of Approved EC Description as per Approved EC Description as per Proposal. Remarks
1J-11015/217/2013-IA.II (M),Permissible Mining of River Bed Material (Sand/BajThe reason for amendment is accounted to the factThe EC is desired for excavation of 2.52lakh
2J-11015/217/2013-IA.II (M)The permissible minable material of 2.52lakh TPA (As lease period is only 13 month from the date ofWe need to stand in sync with the approved mining
12 Details of EIA Consultant
 
Have you hired Consultant for preparing document (Yes/No) ? : Yes  
(i) Accereditation No : NABET/EIA/1922/RA/0173_Rev-01  
(ii) Name of EIA Consultant : M/S N.S. ENVIRO – TECH LABORATORIES & CONSULTANT  
(iii)Address : OFFICE ADD- P. NO. 51, GANETA HOUSE, SHIV VIHAR COLONY NEAR PATRAKAR COLONY ROAD, MANSAROVAR JAIPUR  
(iv)Mobile No: 9829930877  
(v)Landline No : 01416783371  
(vi)E-mail Id : nsenvirotech@gmail.com  
(vii)Category of Accreditation : A  
(viii)Sector of Accreditation : 1  
(ix)Validity of Accreditation : 22.4.2024   (x)Uploaded certificate of Accreditation certified by QCI/NABET :
13. Documents to be Attached
  (a) Uploaded addendum to EIA/EMP Report:   (b) Uploaded Copy of revised -Feasibility Report /Detailed Project Report (DPR) / Detailed Engineering Report / Detailed Conceptual Plan / Approved Mining Plan (in case of mining proposals):   (c) Uploaded Copy of final Layout Plan:   (d)Uploaded Cover Letter duly signed by the project proponent or authorized person:   (e)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency:   (f)Uploaded Additional File, If any:
Essential Details Sought
Essential Details Sought
S.no. EDS Sought Date EDS Sought Letter
1.21/12/2022Your proposal has been examined and it is found that documents links are not opening. kindly resubmit the documents.
2.07/02/2024The corrections have been made as per the instruction received.
 
Additional Detail Sought:   NIL
14. Undertaking
(a): I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up. (b)Name : PARAS SETHI (c)Designation: No (d)Company: PARAS SETHI (e)Address: New Friends Colony,New Delhi 110065 Haryana 110065