Form-4

APPLICATION FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE

(To be filled up by User Agency)
1. Details of Project
 
Proposal No. : SIA/RJ/MIN/293752/2022  
(a) Name of the project : Amendment in EC or Bhinay River Bed Mining poject  
(e) Joint Venture (Yes/No) : No
2. Address for the Correspondence
 
(a) Name of the Applicant. : No  
(b) Designation (Owner/Partner/CEO) : Owner  
(c) Address :-  
       State : Rajasthan  
       District : Jaipur  
       Town / Village : R/o-C-57, Hanuman nagar, Raghu marg, Khatipura, Ja  
(d) Pin Code : 302006  
(e) Email : abhimanyusinghbhinay@gmail.com  
(f) Telephone no : 2333907  
(g) Fax no : 2333907  
(h) Mobile no : 9799744347  
(i) Contact Person. : Abhimanyu Singh  
(j) Website (if any) : No
3. Category of the Project/Activity as per Schedule of EIA Notification,2006
 
(a). Major Activity. : 1(a) Mining of minerals
                               
 
      Minor Activity : 1(a) Mining of minerals
                               
 
      Major Sub Activity. : No  
      Minor Sub Activity : Open Cast Mining  
(b). Category : B1  
      Reason for applicant at central level/state level(in case of B1 and B2 ): No  
(c). Reason : No  
      EAC Concerned (for category A Projects Only ): No
4. Location of the Project
 
(a) Plot No/Survey No/Khasra No : 1 Barli 2572 32.28 -Do- 2573 0.03 2553 10.81 2573/5877 0.16 5437 14.57 5438 21.81 5443 8.15 5445 6.45 5470 3.45 5521 1.7 5528 2.42 5569 23.74 5589 3.61 5590 0.31Mataji Ka Kheda 1020 17.09 787 9.02 3 Devliya Kalan 1506 14.7 1900 0.32 4412 14.45 4540 8.69 4873 9.93 4 Guda Khurd 3152/2616 48.55 5 Guda Kalan 1131 36.03 6 Kitab 253 4.09 318 4.24 479 2.18 613 13.06  
(b) Village : Barli, Mataji Ka Kheda, Deoliya Kalan, Guda Khurd, Gudha Kala & Kitab  
(c) Tehsil : bhinai  
(d) District : Ajmer  
(e) State : Rajasthan  
(f) Pin Code : 305622  
(g) Bounded Latitudes (North) : Yes  
        From : Degree:25, Minutes : 51, Seconds :24  
        To    : Degree:25, Minutes : 45, Seconds :22  
(h) Bounded Longitudes (East) : Yes  
        From : Degree:75, Minutes : 18, Seconds :27  
        To    : Degree:74, Minutes : 59, Seconds :24  
(i) Survey of India Topo Sheet No : 45K/9, 45K/13, 45J/12, 45J/16
5 Details of Environmental Clearance
 
(a) Project Name : Amendment in EC or Bhinay River Bed Mining poject  
(b) MoEF&CC / SEIAA File No : J-11015/224/2013-IA.II (M),  
(c) Date of issue of EC : 03/02/2022   (d) Uploaded EC letter :
6 Details of Consent to Operate
 
(i) Whether Consent to operate obtained (Yes/No) ? : No
7 Amendment Sought for
 
Amendment in Configuration/ Amendments in Clearance condition/ Other (specify) : 1. Looking at the Rajasthan Scenario, the max depth of working will be till 3.0 m. 2. Validity of E
8 Details of Product (as per the approved EC)
Details of Products
S.no Product / Activity (Capacity/ Area). Quantity Unit Mode of Transport/ Transmission of Product
1River bed sand mining/ 1(a)/52 lakh TPA/342.08ha.52 lakhsTPAOthersRoad
9 Details of Configuration (Multiple Entries Allowed)
Details of Configurations
S.no Plant/ Equipment/ Facility Existing Configuration Proposed Configuration Final configuration after Amendment Remarks if Any
1NANANANAno changes
10 Reasons for Amendment
 
Reasons for Amendment : 1)The reason for amendment is accounted to the fact that the production 52 lakhs MTPA (ROM) accorded with area 342.08 ha of excavation with depth of 3.0m. In compliance of Supreme Court order replenishment report has been submitted and fresh deposition of _ sediments on the river bed from replenishment report 10262700 MT is reported, desired excavation quantity is hardly 1.9% of the replenished quantity, therefore depth of mining should be increased from 1mtr to 3mtr from original ground level. Sediments on the bed, which if not removed will account for change in river morphology in the due course of time resulting in Public and asset losses. This production quantity and area of mining was determined by the royalty collected in the area on realistic basis. The same is in sync with the approved Mining Plan. 2) As lease period is only 13 month from the date of execution of mining lease therefore EC may be co-terminus with mining lease period.
11 Any Other Amendment required
Any Other Amendment Required
S.no Reference of Approved EC Description as per Approved EC Description as per Proposal. Remarks
1J-11015/224/2013-IA.II (M)Permissible Mining of River Bed Material (Sand/BajThe reason for amendment is accounted to the factThe EC is desired for excavation of 52 lakhs
2J-11015/224/2013-IA.II (M)The permissible minable material of 52 lakhs MTPAAs lease period is only 13 month from the date ofWe need to stand in sync with the approved mining
12 Details of EIA Consultant
 
Have you hired Consultant for preparing document (Yes/No) ? : Yes  
(i) Accereditation No : NABET/EIA/1922/RA/0173_Rev-01)  
(ii) Name of EIA Consultant : M/S N.S. ENVIRO – TECH LABORATORIES & CONSULTANT  
(iii)Address : OFFICE ADD- P. NO. 51, GANETA HOUSE, SHIV VIHAR COLONY NEAR PATRAKAR COLONY ROAD, MANSAROVAR JAIPUR  
(iv)Mobile No: 0982993087  
(v)Landline No : 01416783371  
(vi)E-mail Id : nsenvirotech@gmail.com  
(vii)Category of Accreditation : A  
(viii)Sector of Accreditation : 1  
(ix)Validity of Accreditation : 8-7-2023   (x)Uploaded certificate of Accreditation certified by QCI/NABET :
13. Documents to be Attached
  (a) Uploaded addendum to EIA/EMP Report:   (b) Uploaded Copy of revised -Feasibility Report /Detailed Project Report (DPR) / Detailed Engineering Report / Detailed Conceptual Plan / Approved Mining Plan (in case of mining proposals):   (c) Uploaded Copy of final Layout Plan:   (d)Uploaded Cover Letter duly signed by the project proponent or authorized person:   (e)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency:   (f)Uploaded Additional File, If any:
Essential Details Sought
Essential Details Sought
S.no. EDS Sought Date EDS Sought Letter
1.20/12/2022Your proposal has been examined and it is found that Essential documents are not submitted, kindly submit.
 
Additional Detail Sought:   NIL
14. Undertaking
(a): I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up. (b)Name : No (c)Designation: Owner (d)Company: No (e)Address: No