Form-4

APPLICATION FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE

(To be filled up by User Agency)
1. Details of Project
 
Proposal No. : SIA/TG/MIS/254901/2022  
(a) Name of the project : Brigade Banyan Hyderabad M/s Brigade Enterprises Limited  
(b) Name of Company / Organisation. : BRIGADE GROUP  
(c) Registered Address. : Brigade Group 29th & 30th Floor, World Trade Center, Brigade Gateway Campus, 26/1, Dr. Rajkumar Road, Malleswaram - Rajajinagar, Bangalore 560 055, India Telangana 560055  
(d) Legal Status of the Company. : Private  
(e) Joint Venture (Yes/No) : No
2. Address for the Correspondence
 
(a) Name of the Applicant. : Abraham koshy  
(b) Designation (Owner/Partner/CEO) : Authorizedsignatory  
(c) Address :-  
       State : Telangana  
       District : Rangareddi  
       Town / Village : No  
(d) Pin Code : 560055  
(e) Email : veena@brigadegroup.com  
(f) Telephone no : 41379200  
(g) Fax no : No  
(h) Mobile no : 9900059043  
(i) Contact Person. : Abraham  
(j) Website (if any) : No
3. Category of the Project/Activity as per Schedule of EIA Notification,2006
 
(a). Major Activity. : 8(b) Townships and Area Development projects.
                               
 
      Minor Activity : No  
      Major Sub Activity. : No  
      Minor Sub Activity : No  
(b). Category : B1  
      Reason for applicant at central level/state level(in case of B1 and B2 ): No  
(c). Reason : No  
      EAC Concerned (for category A Projects Only ): No
4. Location of the Project
 
(a) Plot No/Survey No/Khasra No : Survey Nos. 78 & 79, Fathenagar, Balanagar Mandal, Medchal - Malkajgiri District  
(b) Village : Fathenagar  
(c) Tehsil : balanagar  
(d) District : Medchal Malkajgiri  
(e) State : Telangana  
(f) Pin Code : 500018  
(g) Bounded Latitudes (North) : Yes  
        From : Degree:17, Minutes : 27, Seconds :28  
        To    : Degree:17, Minutes : 27, Seconds :35  
(h) Bounded Longitudes (East) : Yes  
        From : Degree:78, Minutes : 25, Seconds :43  
        To    : Degree:78, Minutes : 24, Seconds :45  
(i) Survey of India Topo Sheet No : 56
5 Details of Environmental Clearance
 
(a) Project Name : Brigade Banyan Hyderabad M/s Brigade Enterprises Limited  
(b) MoEF&CC / SEIAA File No : SIA/TG/MIS/40692/2019  
(c) Date of issue of EC : 23/11/2019   (d) Uploaded EC letter :
6 Details of Consent to Operate
 
(i) Whether Consent to operate obtained (Yes/No) ? : No
7 Amendment Sought for
 
Amendment in Configuration/ Amendments in Clearance condition/ Other (specify) : NA
8 Details of Product (as per the approved EC)
Details of Products
S.no Product / Activity (Capacity/ Area). Quantity Unit Mode of Transport/ Transmission of Product
1Total Built up area in sqm264946.5OthersSelect
9 Details of Configuration (Multiple Entries Allowed)
Details of Configurations
S.no Plant/ Equipment/ Facility Existing Configuration Proposed Configuration Final configuration after Amendment Remarks if Any
1Total Built up area in sqm264946.5262314.6262314.6
2No of Units180813341334
3No of FloorsAmenities - 2C+G+4Amenities - 2C+G+4Amenities - 2C+G+4
4Wastewater generation KLD1028.7776.4776.4
5STP Capacity KLD750 and 620500 and 480500 and 480
6Solid Waste Kg/day568043364336
7DG set Capacity500 kVA x 1 Nos+ 750 kVA x 6 Nos4 X 750 + 2 X 500 +1 X 380 + 1 X 2504 X 750 + 2 X 500 +1 X 380 + 1 X 250
8No of FloorsBlock (1 to 8) -2C+G+15; Amenities - 2C+G+4Block (1 to 6) - 2C+G+15, Block (7 & 8) - 2C+G+6;Block (1 to 6) - 2C+G+15, Block (7 & 8) - 2C+G+6;
9Water requirement KLD1285.9970.5970.5
10 Reasons for Amendment
 
Reasons for Amendment : Final Approvals
11 Any Other Amendment required
Any Other Amendment Required
S.no Reference of Approved EC Description as per Approved EC Description as per Proposal. Remarks
1Project NameBrigade Banyan @ Hyderabad M/s Brigade EnterpriseBrigade Citadel by M/s Brigade Enterprises Limited
12 Details of EIA Consultant
 
Have you hired Consultant for preparing document (Yes/No) ? : No  
(i)Reason for not engaging the Consultant : NA
13. Documents to be Attached
  (a) Uploaded addendum to EIA/EMP Report:   (b) Uploaded Copy of revised -Feasibility Report /Detailed Project Report (DPR) / Detailed Engineering Report / Detailed Conceptual Plan / Approved Mining Plan (in case of mining proposals):   (c) Uploaded Copy of final Layout Plan:   (d)Uploaded Cover Letter duly signed by the project proponent or authorized person:   (e)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency:   (f)Uploaded Additional File, If any:
Essential Details Sought
Essential Details Sought
S.no. EDS Sought Date EDS Sought Letter
NIL
 
Additional Detail Sought:   NIL
14. Undertaking
(a): I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up. (b)Name : Abraham koshy (c)Designation: Authorizedsignatory (d)Company: BRIGADE GROUP (e)Address: Brigade Group 29th & 30th Floor, World Trade Center, Brigade Gateway Campus, 26/1, Dr. Rajkumar Road, Malleswaram - Rajajinagar, Bangalore 560 055, India Telangana 560055