Form-4

APPLICATION FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE

(To be filled up by User Agency)
1. Details of Project
 
Proposal No. : SIA/BR/THE/236202/2021  
(a) Name of the project : Barh Super Thermal Power Project Stage-II  
(b) Name of Company / Organisation. : NTPC Limited  
(c) Registered Address. : NTPC Engineering Office Complex Sector-24, Noida NTPC Engineering Office Complex Sector-24, Noida Uttar Pradesh 201301  
(d) Legal Status of the Company. : Central PSU  
(e) Joint Venture (Yes/No) : No
2. Address for the Correspondence
 
(a) Name of the Applicant. : Vijay Prakash  
(b) Designation (Owner/Partner/CEO) : Head of Deptt Env Engg  
(c) Address :-  
       State : Uttar Pradesh  
       District : Gautam Buddha Nagar  
       Town / Village : Noida  
(d) Pin Code : 201301  
(e) Email : environment.ntpc@gmail.com  
(f) Telephone no : 2410331  
(g) Fax no : 24105060  
(h) Mobile no : 9650991509  
(i) Contact Person. : Vijay  
(j) Website (if any) : No
3. Category of the Project/Activity as per Schedule of EIA Notification,2006
 
(a). Major Activity. : 1(d) Thermal Power Plants
                               
 
      Minor Activity : No  
      Major Sub Activity. : No  
      Minor Sub Activity : No  
(b). Category : B1  
      Reason for applicant at central level/state level(in case of B1 and B2 ): No  
(c). Reason : No  
      EAC Concerned (for category A Projects Only ): No
4. Location of the Project
 
(a) Plot No/Survey No/Khasra No : Plant is bounded by Ramnagar, Nawada etc  
(b) Village : Barh  
(c) Tehsil : Barh  
(d) District : Patna  
(e) State : Bihar  
(f) Pin Code : 803215  
(g) Bounded Latitudes (North) : Yes  
        From : Degree:25, Minutes : 29, Seconds :32  
        To    : Degree:25, Minutes : 29, Seconds :22  
(h) Bounded Longitudes (East) : Yes  
        From : Degree:85, Minutes : 44, Seconds :11  
        To    : Degree:85, Minutes : 45, Seconds :36  
(i) Survey of India Topo Sheet No : 72 G/10 to 14
5 Details of Environmental Clearance
 
(a) Project Name : Barh Super Thermal Power Project Stage-II  
(b) MoEF&CC / SEIAA File No : J-13011/29/2007-IA-II (T)  
(c) Date of issue of EC : 08/04/2013   (d) Uploaded EC letter :
6 Details of Consent to Operate
 
(i) Whether Consent to operate obtained (Yes/No) ? : Yes   (ii) Uploaded copies of all Consent to operate obtained since inception:  
(iii)Date of issue : 20/09/2018  
(iv)Valid Upto: 31/12/2022  
(v)File No : No  
(vi)Application No : 1316487   (vii)Uploaded copy of Consent to operate valid as on Date:
7 Amendment Sought for
 
Amendment in Configuration/ Amendments in Clearance condition/ Other (specify) : Clearance condition No. xxxiv
8 Details of Product (as per the approved EC)
Details of Products
S.no Product / Activity (Capacity/ Area). Quantity Unit Mode of Transport/ Transmission of Product
1Electricity1320Mega Watt(MW)Select
2SelectSelect
9 Details of Configuration (Multiple Entries Allowed)
Details of Configurations
S.no Plant/ Equipment/ Facility Existing Configuration Proposed Configuration Final configuration after Amendment Remarks if Any
1Thermal Power Plant132013201320Regular periodical monitoring
10 Reasons for Amendment
 
Reasons for Amendment : NTPC has explored the technologies for in-built continuous monitoring of radioactivity and heavy metals in coal and ash. No instrument for online in-built continuous monitoring of heavy metals is available. Only periodic sampling of heavy metals and radioactivity is usually being conducted through reputed laboratory / Institute.
11 Any Other Amendment required
Any Other Amendment Required
S.no Reference of Approved EC Description as per Approved EC Description as per Proposal. Remarks
1J-13011/29/2007-IA-II (T)A long term study of radio activity and heavy metaThe term in-built continuous in said stipulation mNTPC has explored the technologies for in-built co
12 Details of EIA Consultant
 
Have you hired Consultant for preparing document (Yes/No) ? : No  
(i)Reason for not engaging the Consultant : Amendment of clause only
13. Documents to be Attached
 
(a) Uploaded addendum to EIA/EMP Report : No Data  
(b) Uploaded Copy of revised -Feasibility Report /Detailed Project Report (DPR) / Detailed Engineering Report / Detailed Conceptual Plan / Approved Mining Plan (in case of mining proposals) : No Data  
(c) Uploaded Copy of final Layout Plan : No Data   (d)Uploaded Cover Letter duly signed by the project proponent or authorized person:   (e)Uploaded a copy of authorization duly signed by the project proponent in support of the person making this application on behalf of the User Agency:   (f)Uploaded Additional File, If any:
Essential Details Sought
Essential Details Sought
S.no. EDS Sought Date EDS Sought Letter
NIL
 
Additional Detail Sought:   NIL
14. Undertaking
(a): I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, The project will be rejected and clearance given, If any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity / construction / expansion has since been taken up. (b)Name : Vijay Prakash (c)Designation: Head of Deptt Env Engg (d)Company: NTPC Limited (e)Address: NTPC Engineering Office Complex Sector-24, Noida NTPC Engineering Office Complex Sector-24, Noida Uttar Pradesh 201301