Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name Proposed Construction of Residential Apartment Building - “Shivabagh” Company/Organisation Name N. SUBBAN SHIVA RAO
Registered Address Land Traders Builders and Developers "Milestone 25" 5th floor, Shop No. 514, Door No. 15-5-223/140 Collectors Gate Junction, Balmatta Mangalore - 575002, Karnataka Karnataka 575002 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Shrinath Hebbar
(b)Designation (Owner/ Partner/ CEO) Authorized Signatory
(c)Address Land Traders Builders and Developers "Milestone 25" 5th floor, Shop No. 514, Door No. 15-5-223/140 Collectors Gate Junction, Balmatta Mangalore - 575002, Karnataka,Dakshina Kannada,Karnataka-575002
(d)Pin code 575002
(e)E-mail shivabaghkar@gmail.com
(f)Telephone No. 824-2423866
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(a) Building and Construction projects
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/KA/MIS/239447/2021
(e)Master Proposal Number(Single Window) SW/239444/2021
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaDakshina KannadaMangaloreKadri
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document NILL
Project Profile
Location of the project R.Sy.No.101/A2P1,101/B1,113/2A1A1A1A1AP1,T.SY No. 749/1AP1
Town / Village
(Name of more than one town may be entered by separating with)
Kadri Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
R.Sy.No.101/A2P1,101/B1,113/2A1A1A1A1AP1,T.SY No. 749/1AP1
State Karnataka District Dakshina Kannada
Tehshil Mangalore Pincode 575002
Nearest railway station Mangalore Railway Station Distance from the project site 2.5
Nearest airport Bajpe International Airport Distance from the project site 8.3
Nearest Town/City/District Headquarters Within the limits of Mangalore City Corporation (MCC) Distance from the project site 0
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) Mangalore City Municipal Corporation M. G. Road, Lal Bhag, Mangalore - 575 003. Contact No.: 0824 - 2220313 – 318 Upload GPS file Copy of Kml File     
Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas None of above Areas
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 68929 Existing Built Up Area(In Meter /Sqr) 0
Does it attract any of the general conditions given below? No
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) 0
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The land was used for residential purpose (single large house) and the same landuse will continue with increased intensity (Refer Annex IV Project site location in CDP Map). Some ruins of the earlier residential houses are present at the site. Landownership and Land conversion documents are enclosed as Annex V. It is proposed to construct a residential apartment building with 3 Basements, Ground Floor and 34 upper floors. Civic Amenities consisting of a mini mart/coffee shop of 167 Sq.m is al
1.2 Clearance of existing land, vegetation and buildings? Yes The land has some ruins of the earlier residential bungalow which will be cleared before the construction starts. Around 74 nos. of trees are present on the project site. The trees falling under the footprint will be cleared with prior permission if required.Refer Annex XIV for Tree Survey of the project site.
1.3 Creation of new land uses? No Not applicable as the land use is residential.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil testing for foundation design of civil structures is carried out.
1.5 Construction works? Yes A single Residential tower of 147 units with 3 basements, ground floor, 34 upper floors will be constructed.
1.6 Demolition works? Yes A shed along with ruins of earlier construction will be demolished/removed.
1.7 Temporary sites used for construction works or housing of construction workers? No Approx. 150-200 construction workers will be engaged during peak construction. The workers will be brought to the site every morning by the contractor. No labour colony is proposed at the site. Temporary sheds will be set up for storage of construction materials. Adequate number of toilets, other sanitary facilities and other amenities will be provided for the labours at the site.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes Single tower with 3 Basements + Ground Floor + 34 Upper Floors. Additional excavated soil will be disposed through contractors.
1.9 Underground works including mining or tunneling? No Excavation work of 71320 Cu.m will be carried out for construction of basements.
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? No Not applicable
1.14 Facilities for storage of goods or materials? Yes Temporary sheds will be erected for the storage of construction materials during the construction stage, these will be dismantled after construction is over.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Construction Phase: Solid waste: Construction waste will be segregated and reused on site to the extent possible. Proper facility for storage of construction wastes will be made at Project site. Liquid waste: The sewage generating from the temporary toilets at the Project site will be taken to the UGD line. Care will be taken to ensure that the water used for construction purposes does not accumulate at the site. Operation Phase: Solid waste: The solid waste generated will be segrega
1.16 Facilities for long term housing of operational workers? No Not applicable
1.17 New road, rail or sea traffic during construction or operation? Yes Construction phase: Temporary traffic of approx. 15-20 trucks per day for haulage of construction material depending on the site activity. Operation phase: There will be an increase in vehicular traffic during peak hours.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not applicable
1.20 New or diverted transmission lines or pipelines? No Not applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not applicable
1.22 Stream crossings? No Not applicable
1.23 Abstraction or transfers of water from ground or surface waters? Yes Construction Phase: Requirement: Approx. 80 kld of fresh water will be required during construction phase. Source: Open well at the site. Operation Phase: Requirement: 142 kld (83 kld Fresh water + 59 kld Recycled water) Fresh water Source: Mangalore City Corporation (MCC) Recycled water Source: 150 kld of STP to be proposed at site
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No There are no water bodies at the site. Land developments will be done in such manner that natural drainage pattern is maintained and the run off will be routed to the water harvesting structures.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Construction Phase: • Construction materials will be transported to the site by the means of trucks/dumpers. • Construction workers are brought to the site by contractor. Operation Phase: • Approx. 100 commuters (working in the shop and other building maintenance staff) on daily basis will use self-driven vehicles or public transport facilities. • Residents and visitors during the operation phase will be using self-owned transportation or public transportation facilities.
1.26 Long-term dismantling or decommissioning or restoration works? No Not applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Construction Phase: There will be a temporary and minor influx of construction laborers and semi-skilled manpower due to employment opportunities generated. Operation Phase: Approximately 100 commuters working in the shops will be using the Mini mart and Approx. 1000 people will be reside in building on full occupancy.
1.29 Introduction of alien species? No Not applicable
1.30 Loss of native species or genetic diversity? No Not applicable
1.31 Any other actions? No Not applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Assigned landuse is residential.
2.2 Water (expected source & competing users) unit: KLD Yes Construction phase: Requirement: 80 kld during peak construction period Source: Open well at the site Operation Phase: Requirement: 142 kld (83 kld Fresh water + 59 kld Recycled water) Fresh water Source: Mangalore City Corporation (MCC) Recycled water Source: 150 kld of STP to be proposed at site. Refer Annex VI for Water Balance chart
2.3 Minerals (MT) No The proposal pertains to the construction activity only. Other than sand, no other minerals will be used.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction materials will be procured from local dealers. Approx. quantity of the construction material will be as follows Cement approx. : 300000 Bags Steel approx. : 3000 T Sand approx. : 30000 cum Masonry approx.: 600000 Nos. Jelly (20mm) : 20000 cum Jelly (40mm) : 500 cum
2.5 Forests and timber (source – MT) No Minimal use of timber for construction.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Construction Phase: Requirement: Approx. 40 KvA Source: MESCOM Operation Phase: Requirement: Approx. 4525 kW Source: MESCOM Back up: 2 DG set of 800 kVA each with fuel requirement of (Diesel) approx. 320 l/hr.
2.7 Any other natural resources (use appropriate standard units) No Not applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No Not applicable. No hazardous substances or material will be used in any commercial and domestic activity during operation phase.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not applicable
3.3 Affect the welfare of people e.g. by changing living conditions? No Not applicable
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not applicable
3.5 Any other causes No Not applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Construction phase: Construction waste would be generated which would include debris, concrete, steel and other metals, bricks, pallets, packaging and paper products, etc. Approximately, 1-2% of debris will be generated during construction depending upon the activity. During Operation Phase Total Solid waste: Approx. 360 kg/day, of which approx. 180 kg will be biodegradable 145 kg non-biodegradable and 35 kg inert waste, will be generated per day. After segregation, Biodegradable was
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Sump oil from the standby DG to be sold to Authorized Recyclers.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Operation phase: Total sewage sludge generated from the proposed activity will be about 3.3 kg/day which will be used as manure at the Project site along with the composted degradable waste.
4.7 Construction or demolition wastes Yes During construction phase, approx. 1-2% of construction material will be waste. Concrete wastage and wasted mortar will be crushed, aggregated and mixed with other road sub-base construction material. Waste/damaged construction material, sieved sand, broken brick bats and chipped plaster will also be used in the construction of roads and for backfill and consolidation of surfaces under margins/pitching of storm water drains, periphery curbing of roads etc. Broken tiles, wasted sanitary ware,
4.8 Redundant machinery or equipment No Not applicable
4.9 Contaminated soils or other materials No Not applicable
4.10 Agricultural wastes No Horticulture waste will be composted along with other biodegradable wastes and used as manure if required or disposed.
4.11 Other solid wastes Yes Plastic/E-waste will be disposed of through authorized agencies.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes There will be minor vehicular pollution during operation phase. Negligible emissions from DG set in case of power failure and from vehicles of the occupants.
5.2 Emissions from production processes No Not applicable.
5.3 Emissions from materials handling including storage or transport Yes There will be dust generation due to construction activities, handling of construction material and movement of construction vehicles. Hence, there will be a slight increase in particulate matter levels during construction phase.
5.4 Emissions from construction activities including plant and equipment Yes Fugitive emissions during unloading of construction material and concrete mixers. Negligible emission from DG sets are also expected.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes During the construction phase, dust will be generated due to handling of construction material and movement of construction vehicles. Occasional odor is possible from STP.
5.6 Emissions from incineration of waste No Not applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources No Not applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Construction phase: Noise will be generated from following sources during construction phase: 1. Construction machinery 2. Proposed construction activity The impacts resulting from these will be mitigated by providing equipment like ear plugs, ear muffs for workers. The noise vibration will also be controlled by using damped foundations and minimizing the number of hours for their usage. Operation phase: Minimal noise from vehicular movement of the occupants and visitors.
6.2 From industrial or similar processes No Not applicable
6.3 From construction or demolition Yes Noise will be generated from construction activity mainly from concrete mixers, trucks, tower cranes, etc.
6.4 From blasting or piling No Not applicable
6.5 From construction or operational traffic Yes Construction phase: Noise generated due to truck carrying the construction raw material/ debris and construction activities. Operational Phase: Since it is a residential project, noise is expected only from the traffic. Minimum noise will be generated from vehicular movement of the occupants and visitors.
6.6 From lighting or cooling systems No Not applicable
6.7 From any other sources No Not applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Not applicable
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes It is estimated that about 110 kld of sewage will be generated from the Site. It would be treated in Sewage Treatment Plant (STP) of 150 kld capacity to meet the prescribed land disposal standards. The treated water will be reused in flushing and horticulture.
7.3 By deposition of pollutants emitted to air into the land or into water No Dust particles generated during construction will be settled continuously by spraying water. No pollutant emission except for DG emissions in case of power failure is envisaged which is rare.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Not applicable
8.2 From any other causes No Not applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Project is in Earthquake Zone III. The design of the building is as per the IS 1893: Part (1) 2002 (Criteria for earth quake resistance design of structures - Part 1 General Provisions and Buildings). Refer Annex XV for Structural Stabilty Certificate.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No Not applicable as the project site is within the well-developed area of Mangalore Municipal Corporation limits where all infrastructural facilities are already available.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not applicable
9.3 Set a precedent for later developments No Not applicable
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes 1. Netravathi river - Approx. 4.23 km* South direction 2. Gurupur river - Approx. 4 km* West direction
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not applicable
4 Inland, coastal, marine or underground waters Yes Arabian Sea - Approx. 5 km* West direction
5 State, National boundaries No Not applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not applicable
7 Defence installations No Not applicable
8 Densely populated or built-up area No The site is densely populated located within Mangalore City Corporation.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes The Project site is within Mangalore City Corporation limits where high quality educational and community facilities are available.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Project is in Seismic Zone III. The building will be designed as per IS 1893: Part (1) 2002 (Criteria for earth quake resistance design of structures - Part 1 General Provisions and Buildings).
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)23/11/2021clarification/details with respect to, •FAR permissible and proposed •Justification for Height clearance •Land use pattern •Tress details w.r.t existing, trees to be removed and additional trees to be planted along with trees proposed at 1tree/80Sqm of plot area •Reports of baseline data
(2.)30/11/2021The correction have been made as per the instruction received
(3.)01/12/2021details not uploaded. pl upload and resubmit.
(4.)01/12/2021The correction have been made as per the instruction received
(5.)04/12/2021Pl provide justification for height clearance.
(6.)07/12/2021The correction have been made as per the instruction received
(7.)17/12/2021pl upload NOC online.
(8.)17/12/2021pl upload NOC online.
(9.)17/12/2021The correction have been made as per the instruction received
(10.)17/12/2021pl upload all documents.
(11.)17/12/2021The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShrinath Hebbar
DesignationAuthorized Signatory
Name of Company (Applicant Name should not be given here)N. SUBBAN SHIVA RAO
AddressLand Traders Builders and Developers "Milestone 25" 5th floor, Shop No. 514, Door No. 15-5-223/140 Collectors Gate Junction, Balmatta Mangalore - 575002, Karnataka
Print