Form-1 | APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE | | 1. Basic Informations | Project Name | M/s. Rasun Exports Private Limited & Others | Company/Organisation Name | M/S. RASUN EXPORTS PRIVATE LIMITED & OTHERS | Registered Address | survey no 63part kondapur village serilingampally mandal rangareddy district telangana Telangana 500084 | Legal Status of the Company | Private |
| 2. | Address for the correspondence: | (a)Name of the Applicant | Kankar Ravinder Reddy | (b)Designation (Owner/ Partner/ CEO) | managing Partner | (c)Address | Rasun Ace Elysian, site office, sy no 63, kondapur village, serilingampally mandal, rangareddy district, telangana,,Serilingampalle,Rangareddi,Telangana-500084 | (d)Pin code | 500084 | (e)E-mail | rasunexports2021@gmail.com | (f)Telephone No. | 0- | (g)Fax No. | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 8(a) Building and Construction projects
| (b)Minor Project/Activity | NIL | (c)Category | B2 | (d)Proposal Number | SIA/TG/MIS/213565/2021 | (e)Master Proposal Number(Single Window) | SW/213564/2021 | (f)EAC concerned (for category A Projects only) | INFRA-2 | (g)Project Type(New/Expansion/Modernization) | Fresh EC |
|
| 4. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Telangana | |
| Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Telangana | Rangareddi | Serilingampalle | Kondapur | | 5. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (c)Reason | -1 | (d)Supporting Document | NILL | |
| Location of the project | Survey No. 63 Part , Kondapur (V), Serilingampally (M), RangaReddy Dist. Telangana | | | Town / Village (Name of more than one town may be entered by separating with) | Survey No. 63 Part ,
Kondapur (V),
Serilingampally (M),
RangaReddy Dist.
Telangana | Plot/Survey/Khasra No. (Name of more than one town may be entered by separating with) | Survey No. 63 Part ,
Kondapur (V),
Serilingampally (M),
RangaReddy Dist.
Telangana | State | Telangana | District | Rangareddi | Tehshil | Serilingampalle | Pincode | 500084 | Nearest railway station | Secunderabad Railway station | Distance from the project site | 15 | Nearest airport | Rajiv Gandhi International Airport | Distance from the project site | 26 | Nearest Town/City/District Headquarters | hyderabad | Distance from the project site | 16 | Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) | Survey No. 63 Part ,
Kondapur (V),
Serilingampally (M),
RangaReddy Dist.
Telangana | Upload GPS file | Copy of Kml File Uploaded GPS file | Shape of the project land | Block (Polygon) | Site alternative under consideration(If any) | Uploaded Site alternative under consideration | Brief summary of project | Uploaded Brief summary of project | | | Does your project location falls under out of any following areas | None of above Areas | | | Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) | 98429.07 | Existing Built Up Area(In Meter /Sqr) | 0 | Does it attract any of the general conditions given below? | No | | | Does it attract the specific condition given below? | No | | | Interlinked Projects | No | | | Whether separate application of interlinked projects has been submitted? | | Date of Submission | | Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | | Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No | | | Whether there is any Government Order/Policy relevent/relating to the site? | No | | | Forest land involved(hectares) | NA | | | Is there any litigation pending against the project? | No | | |
1. | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | There will be changes in the existing land use pattern due to proposed construction activity. The proposed project is in accordance with the GHMC approved Development plan. The development starts only after getting the permission of Environment clearance for the complete project. | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | The existing land is plain land and few trees are present in the site which will be replaced within the project site. | 1.3 | Creation of new land uses? | No | The project site is earmarked for development as per the GHMC building by-laws. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil investigation has been done and the site is suitable for construction activity. | 1.5 | Construction works? | Yes | The proposed project will have the following Total Land Area : 9,169.83 Sq.mts
Road affected Area : 2,558.87 Sq.mts
Area affefted in HT Tower line : 1,562.91 Sq.mts
Net Plot Area : 5,048.05Sq.mts
Proposed Built up area : 98,429.07 Sq.mt.It is a Commercial Building with retail shops and Office space | 1.6 | Demolition works? | No | Demolition is not required. It is a plain open land. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | The construction activities including storing of raw materials will be confined within the project site only. No temporary labour hutment is proposed. Construction workers will be hired from the local area. | 1.8 | Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations | Yes | Total Excavation quantity will be used for refilling or foundation trenches and the balance shall be used for leveling of low-lying areas within the plot premises. | 1.9 | Underground works including mining or tunneling? | No | No underground works including mining / tunneling will be required. | 1.10 | Reclamation works? | No | No reclamation work required. | 1.11 | Dredging? | No | No dredging required. | 1.12 | Offshore structures? | No | No offshore structures required. | 1.13 | Production and manufacturing processes? | No | No manufacturing activity | 1.14 | Facilities for storage of goods or materials? | Yes | Raw material will be stored at site in a covered area. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Solid Waste :
Solid wastes generated will be segregated into biodegradable (waste vegetables and foods etc.) and non-biodegradable (paper, plastic, glass etc.) components and collected in separate bins. Recyclable wastes will be sold off to vendors. Dewatered/ dried sludge from STP will be used as manure in horticulture.
Liquid Effluent:
During construction phase, sewage will be treated and disposed through septic tanks followed by soak pits.
The wastewater in operation phase genera | 1.16 | Facilities for long term housing of operational workers? | No | There will be no facilities for long-term housing of operational workers. | 1.17 | New road, rail or sea traffic during construction or operation? | No | In construction stage some vehicles will be operated at the site for construction work and transport of construction materials.
During operation traffic will increase to some extent for employees. But there will be no rail or sea traffic. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not applicable. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not applicable. | 1.20 | New or diverted transmission lines or pipelines? | No | Not required | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | No impoundment, damming, culverting, realignment or other changes to the hydrology of surface watercourses is proposed. | 1.22 | Stream crossings? | No | The nearby waterbodies are listed below.
Nerla Cheruvu 0.60km S
Kamunon Cheruvu 4.30km E
Maisamma Cheruvu 5.50km E
Suram Cheruvu 4.65km SE
Durgam Cheruvu 5.00km SSE
Padda Cheruvu 4.90km SSE
Chinta Kunta 5.00km SSW
Kudi Kunta 2.30km W
Nallagandla Cheruvu 5.80km W
Vanam Cheruvu 9.40km W
Patel Cheruvu 3.80km NW
Pedda Cheruvu 5.20km NW
Amb Cheruvu 6.00km NNE | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | During construction phase, water supply will be met through bore wells/ tankers. During operation phase, water will be from municipal supply. Treated water from STP will be recycled in operation phase. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Surface drainage will not be affected. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Transport of personnel/ material during construction and operation phase are envisaged. ORR is present in the Front for free movement of the vehicles. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | No | Construction workers from nearby areas will be hired. | 1.29 | Introduction of alien species? | No | Not applicable | 1.30 | Loss of native species or genetic diversity? | No | Not applicable | 1.31 | Any other actions? | No | no | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Project site is earmarked for development by the local development authority. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | During construction phase, required water will be supplied through tankers.
operation phase
1. Total water required during Operation phase of Commercial Complex is 278 KLD.
2. Wastewater estimated to be generated from the project is 222KLD
3. STP Capacity proposed for treatment is 270KLD
4. Recycled water after STP treatment in the process is 200KLD which will be completely recycled for Flushing, Greenbelt development, HVAC system, DG set cooling etc.
Detailed Breakup is given in the | 2.3 | Minerals (MT) | No | Not applicable. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction materials required:
Source: Steel and cement will be procured from authorized vendors. Sand & aggregate will be procured from local material suppliers. | 2.5 | Forests and timber (source – MT) | No | None | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Overall maximum demand is estimated approximately 5715KVA. The source of Electricity will be Telangana State Electricity Board.
DG Set of capacities of 3*2000KVA will be provided for entire Commercial building campus as Back up supply of Power. | 2.7 | Any other natural resources (use appropriate standard units) | No | None | |
3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | The proposed project is a Commercial building project with retail shops & Office space. No production process involved, and hence, no storage of hazardous chemicals (as per MSIHC rules) will be done. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Suitable covered drainage and waste management measures will be adopted in both construction and operational phase, which will restrict stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Construction of Commercial building will provide employment for local labors in both construction and operation phase. During construction phase around 100 persons will be employed and during operational phase around 200 persons will be getting employment in Security, Shopping Areas, Pink collor workers, Maintenance & Cleansing staff in Commercial offices etc. Individual Commercial offices have the employment generated by the respective firm after occupancy. Better infrastructure will be provide | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not applicable. | 3.5 | Any other causes | No | no | |
4 | Production of solid wastes during construction or operation or decommissioning (MT/month) |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | No such spoil, overburden or mine wastes will be generated. | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Solid wastes to be generated in project will be of domestic in nature.
During operation phase, Total Solid waste estimated to be generated from the project would be 1555kg/capita. Composition & quantity of solid wastes estimated to be generated in operation phase are are:
Biodegradable: 933kg/day (Waste vegetables and food waste etc.)
Recyclable 466.50kg/day (Papers, cartons, thermocol, plastics, glass etc.)
Inerts 155.50kg/day
Total: 1555 kg/day | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | No hazardous waste will be generated. | 4.4 | Other industrial process wastes | No | Not applicable | 4.5 | Surplus product | No | Not applicable | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | The sludge generated from STP will be dewatered/ dried and used as compost/manure for the green belt development within the site. | 4.7 | Construction or demolition wastes | Yes | The construction waste will consist of excess earth and construction debris along with cement bags, steel in bits and pieces, insulating and packaging materials etc.
Recyclable waste construction materials will be sold to recyclers. Unusable and excess construction debris will be disposed as per Construction and Demolition waste management rules 2016. | 4.8 | Redundant machinery or equipment | No | Not applicable | 4.9 | Contaminated soils or other materials | No | Not applicable | 4.10 | Agricultural wastes | No | Not applicable | 4.11 | Other solid wastes | No | - | |
5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | The proposed project does not envisage any major air pollution sources except operation of backup DG sets during power failure and vehicular traffic. | 5.2 | Emissions from production processes | No | Not envisaged | 5.3 | Emissions from materials handling including storage or transport | Yes | This will be restricted to the construction phase and to the construction site only. | 5.4 | Emissions from construction activities including plant and equipment | Yes | This will be restricted to the construction phase and to the construction site only. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust, which will be generated during construction, will be water sprinkled. Tarpaulin cover will be provided on stored raw material to reduce the dust emission. Green belt will be developed with 1meter width all along the boundary with large leave foliage and Roof top green areas will be developed in the open spaces of Podium block and Commercial floors. | 5.6 | Emissions from incineration of waste | No | Not applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Open burning of biomass/ other material will be strictly avoided | 5.8 | Emissions from any other sources | No | Not applicable | |
6 | Generation of Noise and Vibration, and Emissions of Light and Heat: |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Source of noise in the operational phase will be from backup DG sets (which will be in operation only during power failure) and pumps & motors. All the machinery will be of highest standard of reputed make and will comply with national/ international standards that take care of air and noise pollution control/ vibration control. Therefore, no significant impact due to operation of machinery is anticipated. | 6.2 | From industrial or similar processes | No | Not applicable | 6.3 | From construction or demolition | Yes | Due to various construction activities, there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities:
• Concreting, mixing & operation of DG sets
• Construction plant and heavy vehicle movement
• During operation phase the DG sets will be provided with suitable noise abatement methods, like acoustically treated enclosures will be adopted. | 6.4 | From blasting or piling | No | No blasting or mechanized piling will be used in the construction phase. | 6.5 | From construction or operational traffic | Yes | Some noise will be generated from vehicular movement in the construction and operational phase. | 6.6 | From lighting or cooling systems | No | No | 6.7 | From any other sources | No | Not applicable. | |
7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | The only hazardous wastes in the project will be used/ spent oil from backup DG sets. The spent oil will be carefully stored in HDPE drums under isolated storage, and periodically sold to authorized recyclers. All precautions will be taken to avoid spillage from storage. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | There will be no discharge of untreated sewage on water or land, as wastewater after treatment will be reused for toilet flushing, and horticultural. Hence no adverse effect is envisaged. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | There will be no deposition of pollutants in to air and water | 7.4 | From any other sources | No | Not applicable. | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not applicable. | |
8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | As we are proposing Retail shops & office space, There might be chances of Fire explosion due to short circuits. But we are proposing advanced technology with all full proof fire resistant materials in Theatre and retail shop constructions. We will strictly implement the all the norms of Telangana State Disaster Response and Fire Services Department.
During construction, all construction workers will be provided with personal protective equipment (PPE) by the contractors as required under th | 8.2 | From any other causes | No | Not applicable. | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | Suitable seismic consideration will be adopted while designing the structures to mitigate the seismic impacts. | |
9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | The proposed project will lead to development of the area by providing well infrastructure, clean atmosphere, employment of the local people during construction and operation phase.
All supporting infrastructure is in place.
Commercial Building project improves infrastructure development, local employment of the location and improves the State Economy.
Not applicable
Not applicable
Not applicable | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not applicable | 9.3 | Set a precedent for later developments | No | Not applicable | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not applicable | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | none | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | Water Bodies
water bodies
Nerla Cheruvu 0.60km S
Kamunon Cheruvu 4.30km E
Maisamma Cheruvu 5.50km E
Suram Cheruvu 4.65km SE
Durgam Cheruvu 5.00km SSE
Padda Cheruvu 4.90km SSE
Chinta Kunta 5.00km SSW
Kudi Kunta 2.30km W
Nallagandla Cheruvu 5.80km W
Vanam Cheruvu 9.40km W
Patel Cheruvu 3.80km NW
Pedda Cheruvu 5.20km NW
Amb Cheruvu 6.00km NNE
Fotrest
Kottaguda RF 1.05km SW | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | none | 4 | Inland, coastal, marine or underground waters | No | none | 5 | State, National boundaries | No | none | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | none | 7 | Defence installations | No | none | 8 | Densely populated or built-up area | No | Kondapur village is the densely populated area | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | none | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | none | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | none | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | none | | Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
NO Record | | Additional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
(1.) | 09/07/2021 | The parking area proposed is insufficient, as per G.O.Ms.No.168, dt.07.04.2012. The proponent shall submit the revised layout plan with parking as per the above G.O. | | (2.) | 13/07/2021 | As per G.O.Ms.No.168, dt.07.04.2012. The proponent as given adequate parking. | EDS Letter | | | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | | Name of Applicant | Kankar Ravinder Reddy | Designation | managing Partner | Name of Company (Applicant Name should not be given here) | M/S. RASUN EXPORTS PRIVATE LIMITED & OTHERS | Address | survey no 63part kondapur village serilingampally mandal rangareddy district telangana |
|
|